Monthly Operating Rept for Oct 1991 for Grand Gulf Unit 1.W/
ML20086A848
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/31/1991
From: Cottle W, Daughtery L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-91-00185, GNRO-91-185, NUDOCS 9111190390
Download: ML20086A848 (5)


Text

...,

A9k E:stergy Operations,inc.

~~" ENTERGY

-. - _ = -.

W. T. Cottle November 14, 1991 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.

20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Repcrt GNR0-91/00185 Gentlemen:

In accordance with the requirement of Technical Specification 6.9.1.10, Eatergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for October 1991 (attachment).

If you have any questions or require additional information, please contact this office.

Yours truly, c--o C W a

WTC/TKM/cg attachments: 1.

Operating Status 2.

Average Daily Power Level 3.

Unit Shutdowns and Power Reductions cc:

(See next page) r' o 1'l i isa wa 711031 -

hDR ADOCh OUOOkOlD p.

R M00P0CT l

1 l

November 14. 1991

-- GNR0-91/00185 Page 2 of 3 cc:

kr. D. C. Hintz (w/a)

Mr. J. L. Mathis (w/a)

Mr.-R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)-

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S. Nuclear Regulatory Ceumission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager (w/a)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555 w

5 M00POCT

i to o'

GNR0-91/00185 DOC + ET i40.

50-416 DATE 11/07/91 COMPLETED BY L. F. Daughtery TELE? HONE (6Til)437-2334 0PERATING STATUS 1.

Unit Name: GGNS UNIT 1

'Wotes:

2.

Reporting Period:

October 1991 3.

Licensed Thermal Powe* (MWT): 3833 MWT 4.

Nameplate Rating (Gross MWE): 1372.5 MWE

5.. Design Electrical Rating (Net MWe): 1250 MWE 6.

Maximum Dependable Capacity (Gross MWe): 113~0 MWE 7.

Maximum Dependable Capacity (Net NWe): 1143 MWE 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.

Give Reasons:

N/A 9.

Power Level To Which Restricted, in-Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr to Date Cumulative 11.' Hours In Reporting Period 745 7,296 61,618

- 12. Number of Hours Reactor Was Critical 745 6,866.3 48,833.1

13. Reactor Reserve Shutdown Hours 0

0 0

-14. Hours Generator On-Line 745 6,697.7 46,711.4 15.-Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,820,903 24,809,236 160,717,307
17. Gross Electrical Energy Generated (MWH) 894,793 7,901,772 50,965,286
18. Net Electrical Energy Generated (MWH) 860,037_

7,578,762 48,720,761

19. Unit Ser+ ice Factor 100.0 91.8 78.6 121.. Unit Capacity Factor (Using MDC Net) 101.0~

91.8 78.6

20. Unit Avcilability Factor 100.0 90.9 74.5'
22. Unit Capacity Factor (Using DER Net) 92.4 83.1 67.6
23. Unit Forced Outage Rate 0

8~2 6.5

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Begin Refueling Outage on 04/17/92 for an estimated duration of 46 days.

2i If Shut Down At End of Report-Period.

Estimated Date of Startup:

NA 26, Units In Test Status (Prior to Commercial Operation).

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 l

l MOOPOCT/SCMPFLR 1

~.. -...

. to

~

l-GNRO-91/00185 f

DOCKET NO.

50-416 UNIT 1

DATE.

11/07/91 COMPLETED BY L. F. Daughtery_

TELEPHONE 601-437-2334 MONTH October 1991-1 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1164.1 17 1184.3 2-1164.4-18 1178.2

^

3 1162.9 19 1167.4 4

1158.1

.20 1179.5 5

1166.3 21 1173.4 i

6 1186.1 22 1166.3

.7 1190.9' 23 1157.5 8

1188.0 24 1158.7 9

1181.1 25 1108.4 10 1174.2 26 809.4 s-L

=11 1171.0-27 1.06.9 l

1:2-1154.3 28 1155.2 13 1169.3-29 1155.8 14

'1168.0=

30 1159.8 I-15 1180.7 31 1161.0 16 1187.7 I

M00POCT/SCMPFLR

' Attachment 3$o GNRO-91/00185 UNIT SHUTDOWNS AND P0WER REDUCTIONS

~

DOCKET NO.

50-416 1

UNIT NAME 1

DATE 11/07/91 COMPLETED BY-L. F. Daughtery TELEPHONE-601-437-2334 REPORT MONTH October 1991 l Method of l Licensee 1

l l

Cause & Corrective

- l 1

-No.

'Date Type Duration P.eason lShuttirq Downl Event System IComponent l Action To (1)

Hours (2)

{

Reactor l Report #

Code l

Code l

Prevent Recurrence 1

(5)

(C&CA) l l

(3)

(4) 1 I

91-10/26/91 S

41 B

5 NA NA NA Rx thermal power reduction to l

i 011

' approximately 70% for control rod l i

l sequence exchange.

-l i

UNIT SHUTDOWNS AND POWER REDUCTIONS 1

2 3

4 F: Forced Reason:

Method:-

Exhibit G - Instructions S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data i

(Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test _

3-Automatic Scram Event Report'(LER)

C-Refueling 4-Continued File (NUREG-0161)

D-Regulatory Restriction 5-Reduced load E-Operator. Training &

6-Other Licensing Examination F-Administrative 5

G-Operational Error Exhibit 1-Same Source j'

(Explain)

H-Other (Explain) i i.

i M00POCT/SCMPFLR

'