ML20086A349

From kanterella
Jump to navigation Jump to search
Forwards Rev to McGuire Unit 1,Cycle 8 Reload Rept, Describing Failed Fuel Rod Discovered in Assembly H63
ML20086A349
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 11/07/1991
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086A352 List:
References
NUDOCS 9111190062
Download: ML20086A349 (5)


Text

_-.

ll l

trake nwn rempany Htt II It air

,l'solh lon" herm r i n r hou!< nt Ctwirrte A C : :01-itnt!

% tear (To/f y7.7 (U/

i DUKE POWER November 7, 1991 U.

S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.

C.

20555

Subject:

McGuire Nuclear Station, Unit 1 Docket Number 50-369 Cycle 8 Reload Submittal; Revision to Reflect Redesign Necessitated By Failed Fuel Rod A report describing the McGuire Unit 1 Cycle 8 reload was submitted by Duke Power on June 26, 1991.-

During the current end-of-cycle (EOC) 7 refueling outage, ultrasonic testing of fuel assemblies to be loaded into Cycle-8 revealed a failed fuel rod in assembly H63.

This assembly was scheduled to be loaded into core location G-ll.

A replacement

assembly, G19, has been selected from among assemblies discharged at EOC 6

to replace assembly H63.

An evaluation of the reload design showed negligible differences in core characteristics as a result of the change in fuel assemblies, and has confirmed the applicability of the original reload safety analysis performed for McGuire Unit 1 Cycle 8.

This change has required a revision to the reload report as submitted.

Accordingly, attached are four (4) replacement pages

~

for Attachment IV of the June 26, 1991 submittal.

The revised information is identified by a vertical line in the right-hand margin.

If there are any questions, please call Scott Gewehr at (704) 373-7581.

Very truly yours, hrY A$.

H.- B. Tucker ffsupp/ sag Y11I190062 9111o7

// }[ l

{DR ADOCK 05000369

( h

\\

PLR

U.

S.

Nuclear Regulatory Commission November 7, 1991-Page 2 cc Mr. T. A.

Road, Project Manager Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Mail Stop 141125, OWFN

_ Washington, D. C.

20555 Mr.

S. D.

Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region 11 101 Marietta Street, NW - Suito 2900 Atlanta, Georgia 30323 Mr. W. T. Orders Conior-Resident Inspector McGuire Nuclear Station Mr. Dayne_ Brown,_ Chief Radiation Protection Branch Division of Facility Services Department _of Iluman Services 701 Barbour Drivo Raleigh, North Carolina 27603-2008 C

('

i

(

l-l

C' Attachment 1

1 l

i 1

4

-f I

e N

e S

. 2 m

4 I

r r

-w4mhr-m+=-

f er-tr w--+

+ =m + >ine-- ww r w+ > e we

--m'wre.-wisme r e--w--e.w-+wrm,=wi~-w.

s,-

=-+me-se-*--+w=-a-

  • +---=-a-+----

-en==ww--aw-esee--ee-+-w-v&-

~

mm-

=emem*-

-m r-

-