ML20086A302
| ML20086A302 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/31/1991 |
| From: | Baron M, Miller D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CNN-91-14094, NUDOCS 9111190020 | |
| Download: ML20086A302 (13) | |
Text
,
+l CCil 91-14n94
.e Pillt.ADEl.PillA El.ECTRIC COMPANY I'l ACll lu) TIUM NIOMIC l'OWI H FI AllON i
R,1) I, Ikit 204 S**g -1A#
Dcita. Itnns) h anta 17.41-4 l's.u as mornw-rets ttm a a os u a t t e %t n (717) 4 W7014 D. IL Milles, h.
Yke l'aenklent novmber 14, im)1
\\
Docket Nos. 50 277 i
50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SUllJECT:
Peach 110ttom Atomic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1991 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerch j /gw#*'
g(./ 7N @Er4 Synp6Mmta1o I'
Df3M/ekAF/TJN/DRM/MJ1Feme Enclosure cc:
R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania J.J. Lyash, USNRC Senior Resident inspector R.I. McLean, State of Maryland T.T. Martin, Administrator, Repion 1. USNRC ll.C. Schwemm, Atlantic Electric J. Urban, Delmarva Power INPO Records Center CCl(nl.NRC
(
- r
'^
.t <J 0 (J' l..,
f
\\\\
9111190020 911031 PD9 ADOC.K 05000277 R
-. -, ~ - _. -. _ -..
,i
+
DocLet No. 50 277 Attachment to Montidy Operating Report for October 1991 UNIT 2 RITUELING INFORM ATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 9 scheduled for September 5,1992.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 20,1992.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
No.
If answer is yes, what, in general, will these be?
5.
- Scheduled date(s) for submitting proposed licensing action and supporting information.
N/A 6.
Imjutant licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 1
l CCic71.NRC
Docke No. 50-277 Attachment to Monthly Operating Report for October 1991 Page 2 IWIT 2 REFUELING INroRM ATION (Continued) 7.
The number of fuel nuemblies (a) in the core and (b) in the ment fuel storage pool:
(a)
Core 7M Fuel Auemblics (b)
Fuel Pool.1896 Fuel Assemblies,58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
September 1997 with full core offload capability.
t l-l l
t CC1091.NRC
'1
.. _.., _ ~.,
.-.~..~,
7-
~,
.a 1
Dodet No. 50 278 Attachment to Monthly Operating Report for October 1991 UNIT 3 HEFUlllNG INI ORM ATIOS 1.
Name of facility:
Peach 11ottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 8 in progress--
l 3.
Scheduled date for restart following refueling Restart following refueling scheduled for December 7,1991 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
See item 6.
If answer is yes, what, in general, will these be?
See item 6.'
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Technical specification amendment on reactor vessel pressure iemperature limits prior to start up for cycle 9 was approved 6/27/91. (Technical Specification Change Request 9(M" f CC1091.NitC i
L. _
,7
.I i
1 Docket No. 50-278 Attachment to Monthly Operating Report for October 1991 Page 2 UNIT 3 HEFUFIJNU INFORM ATION (Continued) e 7.
The number of fuel anemblics (a) in the core and (b) in the spent fuel Storage pool:
(a)
Core 764 Fu:1 Auemblics (b)
Fuel Pool - 1689 Fuel Anemblics,6 Fuel Rods 8.
The present licensed spent fuel pool r,torage capacity and the sire of any increase in licensed storage capacity that has been requer,ted or is planned, in number of fuel assemblics:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.
9.
The projected date of the last refueling that can te discharged to the Spent fuel pool assuming the present capacity:
September 2004 without full core offload capability.
September 1998 with full core offload capability.
i I
t CCK91,NRC
AVERACE DAILY UNIT POWER LEVEL DOCKET WD. 50 277 Uhli PEACH B0110M UN11 2 CATE NOVEMBER 15, 1991 COMPANT PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPOR15 CROUP PE ACH BOTTOM A10MIC POWER li ATION TELEPHONE (717) 456 7014 Ext.1521 MONTH OCTOBER 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVEFACE DAILY POWER LEVEL (MWE NET)
(MJE WET) 1 1065 17 0
2 1D60 18 0
3 1D62 19 0
4 1056 20 0
5 1056 21 0
6 1056 22 71 7
1057 23 664 8
1057 24 1058 9
1056 25 1028 10 1060 26 997 11 1056 27 1108 12 1056 28 1059 13 1056 29 1059 14 1060 30 1D67 15 523 31 1059 16 527
m
- m. _ _
.?
AVERAGE DAILY UNIT POWER LEVEL Doctti Wo. $0 278 i
UWlf PEACH BOTICM UNIT 3 i
]
DAff h0VEMBER 15, 1991 COMPANY PHILADELPHIA (LECTRIC COMPANY M. J. BARON
$UPERVISOR REPORi$ GROUP PEACM BOTTOM ATOMIC POWER $1Afl0N ItttPHONE (71/) 456 7014 Exi. 3321 MONTH OCTOBER 1991 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MA WET)
(Myr. NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
-13 0
29 0
14 0
30 0
15 0
31 0
I 16 0
L l
I-
\\
l l
- 1p OP(RATING DATA REPORT DOCKET 20. 50 278 DATE NOVEMBER 15, 1991 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REFORTS GPOUP PEACH BOTTCM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 OPERATING STATUS 1, UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERICO:
OCTOBER, 1991
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (CROS$ MWE): 1D98
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
103h
- 8. IF CHANGE 1 OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THis MONTH YR-TO DATE CUMULATIVF
- 11. HOURS IN REPORTING PERIOD 745 7,296 147,768
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0
5,359.2 90,362.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR DN-LINE
. 0. 0 5,214.4 87,305.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THEkt.AL ENERGY GENERATED (MWH) 0 16,241,424 256,093,930
- 17. GROSS ELECTRICAL ENERGY GENERA (ED (MWH) 0 5,327,000 84,002,532 l-
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 4,171 5,114,74S 60,491,417 PAGE 1 0F 2 i-l l
t l
t~
t I
9-c e 'e' 9
LPERATING DATA REPORT (CONT lNUED)
DOCKET NO. 50 278 DATE NOVEMBER 15, 1991 THis MONTN YR TO-DATE n atut. AT IVE
- 19. UNIT SERVICE FACTOR 0.0 71.5 59.1
- 20. UNIT AVAILABILITY FACTOR 0.0 71.5 59.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 67.7 52.6
)
l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 65.8 51.1
- 23. UNIT FORCED OUTAGE RATE 0.0 15.1 12.7 i
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURAfl0N OF [ACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF. STARTUP: N/A l
\\
l
- 26. UNITS IN TEti STATUS (PRIOR TO COMMERCtAL OPERAT10N):
FORECAST ACHi[VED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 OF 2
i_e 4
,p-OPERATING DATA REPORT DOCKET NO. 50 277 DATE WOVEMBER 15, 1991 COMPLETED BY PHIL ADELPHI A ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH Boff 0M A10MIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 OPERAllNG STATUS
- 1. UNIT NAME: PEACH BOTTOM V5'T 2 NOTES:
- 2. REPORTING PERIOD:
OCTOBER, 1991
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1D65
- 6. MAXIMUM DEPEN?ABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1055
- 8. IF CHANCES DCCUR IN CAPACITY.RAilWCS (ITEMS NUMBER 3 THROUGN 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE11
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR TO-DATE CUMULAT;VE
- 11. HOURS IN REPORTING PER100 745 7,296 151,872
- 12. NUMBER OF HOURS REACTCa VAS CR111 CAL 638.9 4,361.7 91,062.4
- 13. REACTDR RESERVE SHU1DOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 605.5 4,118.1 87,703.2
- 15. UNIT RESERVE SHUTDOWN ROURS 0.0 0.0 0.0
. GROSS THERMAL ENERGY GENERATED (MWH) 1,892,304 12,465,624 258,B82,657
- 17. GROSS FLECTRICAL ENERGY GENERATED (MWH) 628,500 4,059,300 85,067,590
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 606,873 3,883,222 81,437,868 PACE 1 0F 2 l
1 l
i I
6 0
4*
t OPERAllNG DATA REPORT (CONilNUED)
DOCKET NO. 50 277 DATE NDVEMBER 15, 1991 THIS MONIN YR-10-DATE CUMULAllVE
- 19. UNIT SERVICE FACTOR 81.3 56.4 57.7
- 20. UNil AVAILABILITY F ACTOR 81.3 56.4
$7.7
- 21. UNIT CAPActTY FACTOR (USING MDC NET) 77.2 50.4 50.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 76.5 50.0 50.3
- 23. UNIT FORCED OUTAGE RATE 18.7 16.8 14.5
- 24. SHUTDOUNS SCH(DULED OVER NEXT 6 MON'HS (TYPE, DATE, AND DURATION OF EACH)2
- 25. If SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF ST ARTUP N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL DPERAfl0N):
F ORECAST ACHIEVED INITIAL CRITICAll1Y 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCI AL DPERATIDN 07/05/74 PAGE 2 0F 2 l
1 6 :-
a' 1-i 4
1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 278 UNii NAME PEACH BOTTDM UNIT 3 DATE NOVEMBER 15, 1991 REPORT MONTH OCTOBER, 1991 COMPLETED BT PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POUER STATION TELEPHONE (717) 456 7014 EXT. 3321 I
METHOD OF LICENSEE SYSTEM C0HPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 16 911001 S
745.0 C
1 N/A ZZ ZZZZZ2 PL ANNED Rf'*Ji'. LNG OUT AGE 745.0
[
(1)
(2) -
(3)
(4)
F - FORCED REASON METHOD EXHIBli G - INSTRUCTIONS S - SCHEDULED A EQUIPMENT FAILURE ffXPLAIN) 1 - MANUAL FOR PREPARAfl0N OF DATA B - MAINTENANCE OR TEST 2
- MANUAL SCRAM.
. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D REGULATORY RESTRICTION 4 OTHER (EXPLAIN)
FILE (NUREG 0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G OPERATIONAL ERROR (EXPLAIN)
H OTHER(EXPLAIN)
EXHlBli ! - SAME SOURCE
s a'
UNii $HU1 DOWNS AND POWE R REDUCil0NS DOCKET NO. 50 277 UNIT NAME PEACH B0110M UNii 2 DAIL NOVE MBE R 15, 1991 REPORT HONTH DCT OBE R, 1991 COMPLE1[D BY PHILADELPHI A ELECTRlt COMPANY M. J. BARON SUPERVISOR REPORi$ GROUP PE ACH BOTTOM ATOMIC POWlR 51 A110N TELEPHONE (717) 456-7014 EXI. 3321 sa METHOD Of LICENSEE SYSTEM COMPOkENT' CAUSE AND CORRECilVE IYPE DURAll0N REASON $HUlilWG DOWN EVENT CODE CODE Atil0N TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
RtPORT !
(4)
(5)
PREVENT RECURRENCE 1
19 911015 F
139.5 A
1 2 91 33 sF VALVEX HPCI no 2 23 15 PAtrlNG LEAK 20 911016 5
0.0 H
4 N/A RB CONROD CONTROL R00 PATTERN ADJUS1HENT REACIOR WAS NOT SHUT DOWN 139.5 (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBli G INSTRUCT!DNS S - SCHEDULED A - EQUlPMENT FAILURE (EXPLAIN) 1 - KANUAL FOR PREPARAll0N OF DATA B HAINTENANCE OR TEST 2 MANUAL SCRAM.
ENTRY SHEti$ FOR LICENSEE C - REFUELING 3 AUTOMATIC $ CRAM.
EVENT REPORT (LER)
D - GEGULATORY RESTRICil0N 4 01HER (EXPLAIN)
FILE (NUKEG 0161)
E OPERATOR TRAININC + LICENSE EXAMINAi!DN F
ADMINISTRA11VE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H OTHER(EXPLAIN)
EXHIBli !
SAME SOURCE
_