Text
.
k l
- /;gf M
f u, r m,
,4,n m wo m,o,m, on,
II (') (I C !
- 4 u m....,,o,o u isan m,"
14 vember 8,1991 Beaver Valley Pcuer Station Unit 1 - Dcxtet flo. 50-334, Licenso 14o. DIH-66 Unit 2 - Docket lio. 50-412, Licenso llo. IIIT-73 liottthly Orcratitn,1Leport U. S. liucicar Regulatory Corxnission Docunent control Denk Washirgton, D.C.
20555 Centlaw.41:
In accordance with Appenlix A,
'Itchnical Specifications, the lionthly Operating Foport is cuhnittid for Unit 1 ard Unit 2 for the month of Octoter, 1991.
Very truly yours,
'-h.Y
[4,, u - u.
N<
J. D. Sicber Vice President liuclear Group DI'J/mng D1 closures oc: Imc Pcgional Offico Kirg of Pnissia, PA 1
O
/)0o n u n.c.w n on,,
t p g,;;
ADOCU CN U,U c a t p
eIH
IWGATIVE
SUMMARY
OP ltimILY OPITATDG DGTRI121CC UllIT 1 CCIUDER 1991 I
October 1 7ho Unit operated at a nontinal value of 100% output.
thturgh October 21 October 22 At 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> the Unit comenced Icod reduction to chutdown for repairs to the River Water Purps and to clean the Recirculation Spray lleat Exchargers.
At 0903 hours0.0105 days <br />0.251 hours <br />0.00149 weeks <br />3.435915e-4 months <br /> the Main Unit Generator was taken off line. At 0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br /> the Unit entetui Mode 2.
At 0916 hcurs the reactor was shutdown ard the Unit entetui Mcdo 3.
At 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br /> the Unit enteM Mode 4.
October 23 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br /> the Unit entered Mode 5 for cleaning of the Rociru11ation Spray licat Exchargers and to begin repsirs to the River Water Punps.
Octotor 24 The Unit rannined in Mode 5 for cleaning of the Rocirculation through Spray !! cat Exchangers and for relnirs to the River Water Pumps.
October 31 e- - =
mn.
w>
e,
-,s
3-+<
-, e m ;,,,-m w,
v, -,,
y.- ~. - -
.v~-,-
y
=>-ev-
--,-w-ryq--*
I OPERATING DATA REPORT
)
DOCI'ET No.
50 334 REPORT DATE:
11/04/91 COMPLETED BY: DA"ID T. JONES l
TELEPHONE:
(412) 393 7612 OffEATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: OCTOBER 1991
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Cross MWo):
923 5, DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX, DEPENDABLE CAPACITY (Cross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CllANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO WilICll RESTRICTED. IF ANY (Not MWe):
tigne
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTil YEAR TO DATE CUMULATIVE
- 11. Il0URS Ill REPORTING PERIOD:
745.0 7296.0 135888.0 1.2. NO. OF HRS. REACTOR WAS CRITICAL:
513.3 n229,5 84523.9
- 13. REACTOR RESERVE SilVTDOWN 1100RS :
0.0 0.0 4482.8
- 14. IlOURS CENERATOR WAS ON LINE:
513.1 4091.0 82636.0
- 15. UNIT RESERVE SHUTDOWN 1100RS:
0.0 0.0 0.0
- 16. CROSS TilERMAL ENERGY CEN. (MWil) :
1348372.0 10195509.0 196483956.5
- 17. CROSS ELECT. ENERGY GEN. ( M'.*H ) :
444830.0 3295868,0 63128597 0
- 18. NET ELECTRICAL ENERCY CEN. (MWil) :
417660.0 3080580.0 58944780.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 71.3 56.1 62.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 71.3 56.1 62.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 69.5 50.6 54.6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 31.1 16.1 16.3
- 24. SilUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACll):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:
11/16/91__
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION):
FORECAST ACilI EVED l
INITIAL CRITICALITY N/A N/A l
INITIAL ELECTRICITY N/A N/A l
COMMERCIAL OPERATION t!LA N/A I
l I
l,.
AVERAGE OL LY UNIT POWER LEVEL D00TP 130.
50-334 UNIT _)(VIS Unit 1 DATE 11cv. 4, 1991 cot 4PLL'1".'D BY Dwid T. Jog;s_
TEIIPilotIE J41M 393-7612 3
101Tn! October lig)
DAY AVDMGE DAILY 10hTR IEVEL DAY AVERAGE DAILY FOWER LEVEL
(!Go-Net)
(MWe-Net) 1 821 17 829 2
817 18 825 3
813 19 825 4
813 20 829 5
813 21 825 6
829 22 181 7
821 23 0
8
.82) 24 0
9 825 25 0
10 817 26 0
11 821 27 0
12 824 28 0
r3 829 29 0
14 825_ _.
30 0
15 821 31 0
16 829 IIISTRUCPIONS:
On this fonnat, list the average daily unit power level IEe-!1ct for each day in the reportiry month. Corpute to the nearest whole negawatt.
A UNIT SHO1DOWWS AND POWER REOUCTIONS (120%)
Doc k e t No.
50-33' Unit Name BVPS Unit #1 Date November 4 1991 Completed By D avid t.
Jones REPORT MONTH OCTOBER 1991 Telephone (412) 393-761?
Cause & Corrective I Licensee
______7 Method of Action to
' vent System Component Duration Shutting No.
Date Typel (Hours)
Reason 2 Down Reactor 3 Report #
Code 4 Code $
Prevent Recurrence 30 911022 F
231.9 8
1 N/A WA PUMPXX 8' nit shutcown to repair the River ater Pumps and to clean the Recirc Spray Heat Enchangers.
1___ __ _
4 3
1 2
Exhibit F-Instructions for Method:
F-forced Reason:
Preparation of Data Entry Sheets S-Scheduled A-Equipment Failure (E mplain) 1-Manual for Licensee Event Report (LER) file 8-Maintenance or Test 2 - M ar>ua l Scram (kUREG0161).
3-Automatic Scram C-Refuetin9 4-Cont'd, f r om Previous Month D-Regulatory Restriction 5
5 - R educ t i on E-Operator Training & L icense E xam Exhibit H-Same Source.
9-Other F-Administrative G-Operational Error (Explain)
H-Other (Emplain)
I
NARRATIVE
SUMMARY
OF 10NIHLY OPERATIlG EXPERIENCE UNIT 2 OCIOBER 1991 October 1
'Ihe Unit operated at a nominal value of 100% output, thnn3h October 9 October 10 At 1812 hours0.021 days <br />0.503 hours <br />0.003 weeks <br />6.89466e-4 months <br /> the Unit ccrrenced load reduction to approximately 46% output to perfom n:iintenance on the "B" Heater Drain Pump.
October 11
'Ihe Unit operatcd at approximately 46% output while maintenance through on the "B" Heater Drain Pump was performed.
October 12 October 13 At 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br /> the Unit began escalation to a nominal value of 100% output.
October 14 At 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> the Unit's output was rotuny3d to a noninal value of 100%.
October 15
'Ihe Unit operated at a naminal value of 100% output, thrmgh October 31
OPERATING DATA REPORT DOCKET NO :
50-412 REPORT DATE:
11/04/91 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7621
'QEEBATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REP 01; TING PERIOD: OCTOBER 1991
- 3. LICENSED THERMAL POWER (MWt):
2652 4, NAMEPLATE RATING (Geoss MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX, DEPENDABLE CAPACITY (Net MWe):
820 8.
IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMU LATIVE
- 11. HOURS IN REPORTING PERIOD:
745.0 7296.0 34671.0 l
12, NO. 0F HRS. REACTOR WAS CRITICAL:
745.0 7296,0 29643.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
745.0 7296.0 29457.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1861135.0 18921322.0 72048938.4
- 17. CROSS ELECT. ENERGY GEN. (MWH):
602387.0 6073225,0 23110025.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH):
570564,0 5757757.0 21801081.0 19; UNIT SERVICE FACTOR: (PERCENT) 100.0 100,0 85.0
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 85,0
.75.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 91.6 94.4 75.2
- 23. UNIT. FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
THE UNIT IS SCJJEpULED TO SHUTDOWN FOR IT'S THIRD REFUELING OUTAGE ON MARCH 13. 1991.
THE REFUELING OUTAGE IS SCHEDULED TO IAST FOR 70 DAYS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
AVERAGE DAILY UNIT IG?ER IL'EL LOC}TI' 10.
50-412 UNIT BVPS Unit 2 DATE
._l Lov, 4, 1991 COMPIRI'ED BY _D3yld T u,lgnen._
TELEnlO!IE._1112LL91-lG1L MotMi__ October 1991 D\\Y AVERAGE b\\ILY POWER LEVEL b\\Y AVERAGE D\\ILY IOiER IIVEL (Mie-Not)
(Mie-!!et) 1 805 17 812 2
307 18 808 3
809 19 813 4
806 20 8]6 5
809 21 815 6
819 22 812 7
818 23 808 8
815 24 804 9
810 25 80]
10 743 26 803 11 341 27 805 12 345 28 Ell 13 415 29 813 14 816 30 812 15 816 31 812 16 817 INSTIUCTIOtIS:
On this formt, list the average daily unit power level MWe-tiet for each day in the reportire month. Conpute to the nearest whole megawatt.
.g.
1 i
- s P
~
j
+
UNIT SHUIDOWNS.'AND POVER GEDUCTIONS (1201)
Docket no.
50-412 Unit Name SVPS Untt *2 Date November d..
1991-Completed By Devi<1 7.
Jones REPORT MONTH OCTOBER 1991 Telephone (412) 393-7612' 4
Method of Licensee Cause & Corrective.
Duration Shutting Event
. System Component Action to ko.
Date
.Typet
( H ours )
Reason 2-Down Reactor 3 Report #
-Code 4 Code 5 Prevent.. Recurrence 11 911010 S-0 8
5 N/A HM PUMPMN Unit's output reduced f rom 100% to 461 to perfore maintenance on the "B" Heater Drain Pump.
l l
i 4
1 2
I 4
F-Foeced Reason:
Method:
Exhibit F-Instructions for S-Sr eduled A -E quipment Failure (Explain) 1-Manual
. Preparation of Data Entry Sheets B-Maintenance or test 2-Manual Scram f or Licensee Event Report (LER) File C-Refueling 3* Automatic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month j
E-operator Training & License Ezam 5-Reduction 5
i F-Administrative 9-Other Exhibit H-Same Source.
G-Operat ional Er r or (Emplain)
H-Other (Esplain) i 4
4