ML20085N647

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1991 for Beaver Valley Power Station,Units 1 & 2
ML20085N647
Person / Time
Site: Beaver Valley
Issue date: 10/31/1991
From: David Jones, Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9111150305
Download: ML20085N647 (9)


Text

.

k l

  • /;gf M

f u, r m,

,4,n m wo m,o,m, on,

II (') (I C !

  • 4 u m....,,o,o u isan m,"

14 vember 8,1991 Beaver Valley Pcuer Station Unit 1 - Dcxtet flo. 50-334, Licenso 14o. DIH-66 Unit 2 - Docket lio. 50-412, Licenso llo. IIIT-73 liottthly Orcratitn,1Leport U. S. liucicar Regulatory Corxnission Docunent control Denk Washirgton, D.C.

20555 Centlaw.41:

In accordance with Appenlix A,

'Itchnical Specifications, the lionthly Operating Foport is cuhnittid for Unit 1 ard Unit 2 for the month of Octoter, 1991.

Very truly yours,

'-h.Y

[4,, u - u.

N<

J. D. Sicber Vice President liuclear Group DI'J/mng D1 closures oc: Imc Pcgional Offico Kirg of Pnissia, PA 1

O

/)0o n u n.c.w n on,,

t p g,;;

ADOCU CN U,U c a t p

eIH

IWGATIVE

SUMMARY

OP ltimILY OPITATDG DGTRI121CC UllIT 1 CCIUDER 1991 I

October 1 7ho Unit operated at a nontinal value of 100% output.

thturgh October 21 October 22 At 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> the Unit comenced Icod reduction to chutdown for repairs to the River Water Purps and to clean the Recirculation Spray lleat Exchargers.

At 0903 hours0.0105 days <br />0.251 hours <br />0.00149 weeks <br />3.435915e-4 months <br /> the Main Unit Generator was taken off line. At 0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br /> the Unit entetui Mode 2.

At 0916 hcurs the reactor was shutdown ard the Unit entetui Mcdo 3.

At 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br /> the Unit enteM Mode 4.

October 23 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br /> the Unit entered Mode 5 for cleaning of the Rociru11ation Spray licat Exchargers and to begin repsirs to the River Water Punps.

Octotor 24 The Unit rannined in Mode 5 for cleaning of the Rocirculation through Spray !! cat Exchangers and for relnirs to the River Water Pumps.

October 31 e- - =

mn.

w>

e,

-,s


3-+<

-, e m ;,,,-m w,

v, -,,

y.- ~. - -

.v~-,-

y

=>-ev-

--,-w-ryq--*

I OPERATING DATA REPORT

)

DOCI'ET No.

50 334 REPORT DATE:

11/04/91 COMPLETED BY: DA"ID T. JONES l

TELEPHONE:

(412) 393 7612 OffEATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: OCTOBER 1991
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Cross MWo):

923 5, DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX, DEPENDABLE CAPACITY (Cross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CllANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, CIVE REASONS:
9. POWER LEVEL TO WilICll RESTRICTED. IF ANY (Not MWe):

tigne

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTil YEAR TO DATE CUMULATIVE

11. Il0URS Ill REPORTING PERIOD:

745.0 7296.0 135888.0 1.2. NO. OF HRS. REACTOR WAS CRITICAL:

513.3 n229,5 84523.9

13. REACTOR RESERVE SilVTDOWN 1100RS :

0.0 0.0 4482.8

14. IlOURS CENERATOR WAS ON LINE:

513.1 4091.0 82636.0

15. UNIT RESERVE SHUTDOWN 1100RS:

0.0 0.0 0.0

16. CROSS TilERMAL ENERGY CEN. (MWil) :

1348372.0 10195509.0 196483956.5

17. CROSS ELECT. ENERGY GEN. ( M'.*H ) :

444830.0 3295868,0 63128597 0

18. NET ELECTRICAL ENERCY CEN. (MWil) :

417660.0 3080580.0 58944780.0

19. UNIT SERVICE FACTOR: (PERCENT) 71.3 56.1 62.9
20. UNIT AVAILABILITY FACTOR:(PERCENT) 71.3 56.1 62.9
21. UNIT CAPACITY FACTOR (MDC): PCT 71.6 52.1 56.3
22. UNIT CAPACITY FACTOR (DER): PCT 69.5 50.6 54.6
23. UNIT FORCED OUTAGE RATE: (PERCENT) 31.1 16.1 16.3
24. SilUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACll):
25. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:

11/16/91__

26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION):

FORECAST ACilI EVED l

INITIAL CRITICALITY N/A N/A l

INITIAL ELECTRICITY N/A N/A l

COMMERCIAL OPERATION t!LA N/A I

l I

l,.

AVERAGE OL LY UNIT POWER LEVEL D00TP 130.

50-334 UNIT _)(VIS Unit 1 DATE 11cv. 4, 1991 cot 4PLL'1".'D BY Dwid T. Jog;s_

TEIIPilotIE J41M 393-7612 3

101Tn! October lig)

DAY AVDMGE DAILY 10hTR IEVEL DAY AVERAGE DAILY FOWER LEVEL

(!Go-Net)

(MWe-Net) 1 821 17 829 2

817 18 825 3

813 19 825 4

813 20 829 5

813 21 825 6

829 22 181 7

821 23 0

8

.82) 24 0

9 825 25 0

10 817 26 0

11 821 27 0

12 824 28 0

r3 829 29 0

14 825_ _.

30 0

15 821 31 0

16 829 IIISTRUCPIONS:

On this fonnat, list the average daily unit power level IEe-!1ct for each day in the reportiry month. Corpute to the nearest whole negawatt.

A UNIT SHO1DOWWS AND POWER REOUCTIONS (120%)

Doc k e t No.

50-33' Unit Name BVPS Unit #1 Date November 4 1991 Completed By D avid t.

Jones REPORT MONTH OCTOBER 1991 Telephone (412) 393-761?

Cause & Corrective I Licensee

______7 Method of Action to

' vent System Component Duration Shutting No.

Date Typel (Hours)

Reason 2 Down Reactor 3 Report #

Code 4 Code $

Prevent Recurrence 30 911022 F

231.9 8

1 N/A WA PUMPXX 8' nit shutcown to repair the River ater Pumps and to clean the Recirc Spray Heat Enchangers.

1___ __ _

4 3

1 2

Exhibit F-Instructions for Method:

F-forced Reason:

Preparation of Data Entry Sheets S-Scheduled A-Equipment Failure (E mplain) 1-Manual for Licensee Event Report (LER) file 8-Maintenance or Test 2 - M ar>ua l Scram (kUREG0161).

3-Automatic Scram C-Refuetin9 4-Cont'd, f r om Previous Month D-Regulatory Restriction 5

5 - R educ t i on E-Operator Training & L icense E xam Exhibit H-Same Source.

9-Other F-Administrative G-Operational Error (Explain)

H-Other (Emplain)

I

NARRATIVE

SUMMARY

OF 10NIHLY OPERATIlG EXPERIENCE UNIT 2 OCIOBER 1991 October 1

'Ihe Unit operated at a nominal value of 100% output, thnn3h October 9 October 10 At 1812 hours0.021 days <br />0.503 hours <br />0.003 weeks <br />6.89466e-4 months <br /> the Unit ccrrenced load reduction to approximately 46% output to perfom n:iintenance on the "B" Heater Drain Pump.

October 11

'Ihe Unit operatcd at approximately 46% output while maintenance through on the "B" Heater Drain Pump was performed.

October 12 October 13 At 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br /> the Unit began escalation to a nominal value of 100% output.

October 14 At 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> the Unit's output was rotuny3d to a noninal value of 100%.

October 15

'Ihe Unit operated at a naminal value of 100% output, thrmgh October 31

OPERATING DATA REPORT DOCKET NO :

50-412 REPORT DATE:

11/04/91 COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-7621

'QEEBATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REP 01; TING PERIOD: OCTOBER 1991
3. LICENSED THERMAL POWER (MWt):

2652 4, NAMEPLATE RATING (Geoss MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX, DEPENDABLE CAPACITY (Net MWe):

820 8.

IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMU LATIVE

11. HOURS IN REPORTING PERIOD:

745.0 7296.0 34671.0 l

12, NO. 0F HRS. REACTOR WAS CRITICAL:

745.0 7296,0 29643.3

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR WAS ON LINE:

745.0 7296.0 29457.8

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1861135.0 18921322.0 72048938.4

17. CROSS ELECT. ENERGY GEN. (MWH):

602387.0 6073225,0 23110025.0

18. NET ELECTRICAL ENERGY GEN. (MVH):

570564,0 5757757.0 21801081.0 19; UNIT SERVICE FACTOR: (PERCENT) 100.0 100,0 85.0

20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 85,0
21. UNIT CAPACITY FACTOR (MDC): PCT 93.4 96,2

.75.9

22. UNIT CAPACITY FACTOR (DER): PCT 91.6 94.4 75.2
23. UNIT. FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.0
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):

THE UNIT IS SCJJEpULED TO SHUTDOWN FOR IT'S THIRD REFUELING OUTAGE ON MARCH 13. 1991.

THE REFUELING OUTAGE IS SCHEDULED TO IAST FOR 70 DAYS.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

AVERAGE DAILY UNIT IG?ER IL'EL LOC}TI' 10.

50-412 UNIT BVPS Unit 2 DATE

._l Lov, 4, 1991 COMPIRI'ED BY _D3yld T u,lgnen._

TELEnlO!IE._1112LL91-lG1L MotMi__ October 1991 D\\Y AVERAGE b\\ILY POWER LEVEL b\\Y AVERAGE D\\ILY IOiER IIVEL (Mie-Not)

(Mie-!!et) 1 805 17 812 2

307 18 808 3

809 19 813 4

806 20 8]6 5

809 21 815 6

819 22 812 7

818 23 808 8

815 24 804 9

810 25 80]

10 743 26 803 11 341 27 805 12 345 28 Ell 13 415 29 813 14 816 30 812 15 816 31 812 16 817 INSTIUCTIOtIS:

On this formt, list the average daily unit power level MWe-tiet for each day in the reportire month. Conpute to the nearest whole megawatt.

.g.

1 i

s P

~

j

+

UNIT SHUIDOWNS.'AND POVER GEDUCTIONS (1201)

Docket no.

50-412 Unit Name SVPS Untt *2 Date November d..

1991-Completed By Devi<1 7.

Jones REPORT MONTH OCTOBER 1991 Telephone (412) 393-7612' 4

Method of Licensee Cause & Corrective.

Duration Shutting Event

. System Component Action to ko.

Date

.Typet

( H ours )

Reason 2-Down Reactor 3 Report #

-Code 4 Code 5 Prevent.. Recurrence 11 911010 S-0 8

5 N/A HM PUMPMN Unit's output reduced f rom 100% to 461 to perfore maintenance on the "B" Heater Drain Pump.

l l

i 4

1 2

I 4

F-Foeced Reason:

Method:

Exhibit F-Instructions for S-Sr eduled A -E quipment Failure (Explain) 1-Manual

. Preparation of Data Entry Sheets B-Maintenance or test 2-Manual Scram f or Licensee Event Report (LER) File C-Refueling 3* Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month j

E-operator Training & License Ezam 5-Reduction 5

i F-Administrative 9-Other Exhibit H-Same Source.

G-Operat ional Er r or (Emplain)

H-Other (Esplain) i 4

4