Text
p r.sg Ul p
,t UNITED STATES j
NUCLEAR REGULATORY COMMISSION 4
WASHINGTON, D.C. 20065 4 001 49.....,o
-Pf PECO ENERGY COMPANY Tha PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 207 License No. DPR-44 k
1.
The Nuclear Regulatory Commission (the Commission) has found that:-
$I A.
The application for amendment by PEC0 Energy Company, et al. (the licensee) dated March 22, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activiti9s authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defgand security or to the health or safety of the public; and m:%
E.
The'i4ssuance of this amendment is in accordance with 10 CFR Part 51 of theif,surission's " regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
ph[ ADO 00 7
P
~
?
. (2) T Enacifications 1-TheTeebnical'SpecificationscontainedinAppendicesAandB,as revised through Amendment No. 207, are hereby incorporated in the Itcense.
PECO shall operate the facility in accordance with the Technical Specifications.
?*
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY C0f011SSION b & ).h,a$! =-
pJohnF.Stolz, Director Project Directorate I-2 Division of Reactor Projects - I/II l
r.
Office of Nuclear Reactor Regulation il.
Attachment:
Changes to the Technical Specifications j
Date of Issuance: June 19, 1995 i
'i e
-p N
f%
.)
kycn.
,m
3* ' -.
3 v
ATTACHMENT TO LICENSE AMENDMENT NO. 207 FACILITY OPERATING LICENSE NO. DPR-44 i
.1 DOCKET NO. 50-277 9
t 9
l' Replace the following page of the Appendix A Technical Specifications with the
- q enclosed page. The revised areas are indicated by marginal lines.
.q ;
Remove.
Insert h
168 188 i
I llF i
i
~~
- =_
i Unit 2 PBAPS M
NOTES FOR TABTRA 3.7.2 THROUGH 3.7.4 1<
(1)
Minimum test hold time duration for all valves and M
penetrations listed is 20 minutes after stabilization.
7
-(2)
Test pressures of at least 49.1 psig for all valves and penetrations except MSIV's which are tested at 25 psig.
(3)
MSIV's acceptable leakage is 11.5 scfh/ valve of air.
(4)
The total acceptable leakage for all valves and penetrations other than the MSIV's is 0.60 La.
(5)
Local leak tests on all testable isolation valves shall be performed per 10CFR50, Appendix J requirements.
(6)
Local leak tests on all testable penetrations shall be performed per 10CFR50, Appendix J requirements.
(7)
Personnel Air Locks shall be tested at 6-month intervals.
(8)
The personnel air locks are tested at 49.1 psig.
(9)
Identifies isolation valves that may be tested by applying pressure between the inboard and outboard valves.
(10) Gate valves are tested in reverse direction.
Test acceptable since the normal force between the seat and the disc generated by stem action alone is greater than ten (10) times the normal force induced by test differential pressure except for valves MO-10-31A,B which is 7.97.
This applies to the following valves:
MO-2-74 MO-10-31A, B MO-13-15 MO-10-18 MO-23-15 MO-12-15 (Unit #2)
MO-10-32 (Unit #2)
-188-Amendment No. 30,lH,l79,207 I
I
.,,m o
p' UNITED STATES j
j j
NUCLEAR REGULATORY COMMISSION
_l 2
WASHINGTON, D.C. 200664m01
\\...../
PECO ENERGY COMPANY Q
EyglIC SERVICE ELECTRIC AND GA5 COMPANY 3
DELMARVA POWER AND LIGHT COMPANY 4
ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 209 License No. DPR-56 i
i 1.
The Nuclear Regulatory Comission (the Commission) has found that:
Te
?
A.
The application for amendment by PECO Energy Company, et al. (the 1
licensee) dated March 22, 1995, complies with the standards and l
requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the reles and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (11) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defg and security or to the health or safety of the public; and s.-
E.
Thefissuance of this amendment is in accordance with 10 CFR Part 51 of the Commissionts regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:
i
~
1 4 (2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 209, are hereby incorporated in the
., i license. _ PECO shall operate the facility in accordance with the M,g Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMISSION
[JohnF.Stolz, Director Project Directorate I-2 Division of Reactor Projects - I/II Office nf Nuclear Reactor Regulation 2
Attachment:
1 Changes to the Technical j
Specifications Date of Issuance: June 19, 1995 g-y
gjg ;
e
=1 0
ATTACHMENT TO LICENSE AMENDMENT NO.209 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278
..)
Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.
Remove Inatt 188 188 1
I
-t-a
, ;E%, *
[,k;;,.
a
3,;
+1 Unit 3 PBAPS bl
- 4 NOTES FOR TABTRA 3.7.2 THROUGH 3.7.4 7)m' (1)
Minimum test hold time duration for all valves and "N
penetrations listed is 20 minutes after stabilization.
~
(2)
Test pressures of at least 49.1 psig for all valves and' penetrations except MSIV's which are tested at 25 psig.
(3)
MSIV's acceptable leakage is 11.5 scfh/ valve of air.
(4)
The total acceptable leakage for all valves and penetrations other than the MSIV's is 0.60 La.
(5)
Local leak tests on all testable isolation valves shall be performed per 10CFR50, Appendix J requirements.
(6)
Local leak tests on all testable penetrations shall be performed per 10CFR50, Appendix J requirements.
(7)
Personnel Air Locks shall be tested at 6-month intervals.
(8)
The personnel air locks are tested at 49.1 psig.
( 9')
Identifies isolation valves that may be tested by applying pressure between the inboard and outboard valves.
(10) Gate valves are tested in reverse direction.
Test acceptable since the normal force between the seat and the disc generated by stem action alone is greater than ten (10) times the normal force induced by test differential pressure except for valves MO-10-31A,B which is 7.97.
This applies to the following valves:
y';
MO-2-74 MO-10-31A, B MO-13-15 MO-10-18 MO-23-15 MO-12-15 (Unit #2)
NO-10-32 (Unit #2)
-188-Amendment No. 29,I67,IB2,209
~
. -.