Text
-
. & -f2'/ f25 - & A -b Of/6lf5 E- " 3 " $
VEGP PIANT REVIEW GOARD MEETING MINUTES Staff Exh, II-9 DOCKETED i
MEETING MO.90-111 DATE 8/30/90 pad &SNEC oF a
.afETING CONVENED 8:19 AM/PH; MEETING AD70U D, 93 2 ( y AM/ N I j
(
- VIA TELECON) j 4
j THIS MEETING CHAIPZD BY:
i T. v. Greene blCEgSpCPETg 0
j (X) CHAIRMAN
( ) VICE CHAIRMAN n
x l
VOTING MEMBERS PRESENT:
J. G. Aufdenkampe M.W. E n PRB SECRETARY A. Rodgers NON-VOTING MEMBERS PRESENT:
G. R. Frederick j
i I
\\
i VOTING ALTERNATES PRESENT:
C.
L. Coursey FOR H. M. Handfinger W. L. Burmeister FOR J. P. Cash l
NON-VOTING ALTERNATES PRESENT:
FOR FOR FOR FOR l
FOR GUESTS / TECHNICAL ADVISORS:
G. Bockhold S. H. Chesnut A. L. Mosbaugh R. M. Odom B. Bonzer (NRC)
PRB ACTION ITEMS OPENED:
None PRB ACTION ITEMS CLOSED:
None eo es:s PRB MINUTES APPROVED None I
_A V
0XLI2c&u.v A&
PRBSECNETARY PRB CHAIRMAN a
.CC: NRC RESIDENT INSPECTOR (FORM NAME=PRBAGEND) 45A4219P
'?ii U3
. 'i i
dE: 7.."1 F-a F
' M)
^T!
NI T
35v 7 sm:lA Jaf.0 IVO KEE4'UO
.7 h 7 l
- 9 tga 02u03 c3103r39
^"*i'l y
CV.13338 luesddy NU3 C2H!1?SGI
/
y gy pJas w einul 9,g g q g 0N N/3 Inn.
hth O ON P f'00
~
,msm-xusm-o
1 h
l PRB 90-111 Page 2 of 2 PRB NEETING NINUTES CONTINUATION SEEST A.
The board unanimously recommended approval of the Letter to NRC for Clarification of Response to Confirmation of Action Letter (ELV-02059), with comment.
No unreviewed safety E
question involved.
Comments are as follows:
- Page 1, paragraph #1, next to last sentence - and the sentence at the word " error", and delete the remainder of the sentence.
- Page 1, paragraph (2 - change "the OSI" to "a recent NRL inspection"
- Page 1, paragraph f3, line il - change " errors" to
" confusion"
- Page 1, paragraph #3, line $3 - change " start" to " test";
line #7 - change " start" to " test"
- Page 1, paragraph f3, last sentence - add "...for the NRC April 9 Letter" at the end of the sentence.
- Page 2, line $6 - change "24" to "29",
and delete
"(excluding'5 post maintenance start attempts)"; change "23" to "21".
Line 67 - change #14" to "12".
- Tables #1 & #2 - spell out all abbreviations, except UV and LOSP.
- Table #1, start #148 - Add "Yes" in success column and "Yes" in Unplanned Trip column with the following explanation:
" Unit tripped during bubble testing due to one sensor venting and another sensing line being disconnected for testing".
- Table #2, start #136 - Add "No" in Success column and "No" in Unplanned Trip column.
Add an asterisk (*) in the success column with the following explanation:
"High Temperature Jacket Water alarm was received and the engine ',
kept running"
- Tables #1 and #2 - delete footnotes at the bottom of both i
tables.
Meeting Adjourned e
n i
k l
kl o
M MM W.
M.
,,,Q
I j
.n.,,
\\
1 PRB 90-111 Page 2 of 2
,l PRB MEETING NINUTES CONTINUATION SEEST A.
The board unanimously recommended approval of the Letter to NRC for Clarification of Response to Confirmation of Action Letter (ELV-02059), with comment.
No unreviewed safety E
question involved.
Comments are as follows:
- Page 1, paragraph #1, next to last sentence - and the sentence at the word " error", and delete the remainder of the sentence.
- Page 1, paragraph #2 - change "the OSI" to "a recent NRC inspection" l
- Page 1, paragraph f3, line il - change " errors" to
" confusion" 1
- Page 1, paragraph f3, line #3 - ohange " start" to " test";
line #7 - change " start" to " test"
- Page 1, paragraph $3, last sentence - add "...for the NRC April 9 Letter" at the end of the sentence.
- Page 2, line $6 - change "24" to "29",
and delete
"(excluding'5 post maintenance start attempts)"; change "23" to "21".
Line 67 - change "14" to "12".
- Tables #1 & $2 - spell out all abbreviations, except UV and LOSP.
- Table #1, start #148 - Add "Yes" in Success column and "Yes" in Unplanned Trip column with the following
{
explanation:
" Unit tripped during bubble testing due to one sensor venting and another sensing line being disconnected for testing".
i
- Table #2, start #136 - Add "No" in Success column and "No#
in Unplanned Trip column.
Add an asterisk (*) in the l
Success column with the following explanation:
"High t
Temperature Jacket Water alarm was received and the engine ",,,
i j
kept running"
- Tables #1 and f2 - delete footnotes at the bottom of both i
tables.
j Meeting Adjourned l;