Staff Exhibit S-9,consisting of VEGP Plant Review Board Meeting Minutes
ML20085M772
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/16/1995
From: Thomas Greene
GEORGIA POWER CO.
To:
References
OLA-3-S-009, OLA-3-S-9, NUDOCS 9506290332
Download: ML20085M772 (3)


Text

-

, . & -f2'/ f25 - & A -b Of/6lf5 E- " 3 " $

. VEGP PIANT REVIEW GOARD MEETING MINUTES Staff Exh, II-9 ,

DOCKETED i MEETING MO.90-111 DATE 8/30/90 pad &SNEC oF a

.afETING CONVENED 8:19 AM/PH; MEETING AD70U D , 93 2 ( y AM/ N I j (

  • VIA TELECON) --- - --

j 4  ;

j THIS MEETING CHAIPZD BY: i j (X) CHAIRMAN ( ) VICE CHAIRMAN T. v. Greene0nblCEgSpCPETg x

l VOTING MEMBERS PRESENT: J. G. Aufdenkampe M.W. E n PRB SECRETARY A. Rodgers '

NON-VOTING MEMBERS PRESENT: G. R. Frederick j i

I _

\

i __

! VOTING ALTERNATES PRESENT:

C. L. Coursey FOR H. M. Handfinger W. L. Burmeister FOR J. P. Cash l NON-VOTING ALTERNATES PRESENT: ,

FOR FOR FOR FOR l FOR GUESTS / TECHNICAL ADVISORS:

G. Bockhold S. H. Chesnut A. L. Mosbaugh R. M. Odom B. Bonzer (NRC)

PRB ACTION ITEMS OPENED: None None l

$$ PRB ACTION ITEMS CLOSED:

eo es:s PRB MINUTES APPROVED  : None I

.- . _A V 0XLI2c&u.v A&

PRBSECNETARY PRB CHAIRMAN a

.CC: NRC RESIDENT INSPECTOR (FORM NAME=PRBAGEND) 45A4219P _ _ _ _ _ _ _ _

. '?ii U3

. 'i i dE: 7.."1 F- a F

' M)

^T!

NI T Jaf.0 35v 7 sm:lA IVO KEE4'UO

.7 h 7 l

  • 9 tga 02u03 c3103r39 ^"*i'l luesddy y CV.13338 NU3 C2H!1?SGI /

~

y gy pJas w einul 9 ,g g q g 0N N/3 Inn . hth O ON P f'00

,msm-xusm-o

  • 1 h

PRB 90-111 Page 2 of 2 l PRB NEETING NINUTES CONTINUATION SEEST A. The board unanimously recommended approval of the Letter to NRC for Clarification of Response to Confirmation of Action .

Letter (ELV-02059), with comment. No unreviewed safety question involved. Comments are as follows: E

- Page 1, paragraph #1, next to last sentence - and the -

sentence at the word " error", and delete the remainder of the sentence.

- Page 1, paragraph (2 - change "the OSI" to "a recent NRL inspection"

- Page 1, paragraph f3, line il - change " errors" to

" confusion"

- Page 1, paragraph #3, line $3 - change " start" to " test";

line #7 - change " start" to " test"

- Page 1, paragraph f3, last sentence - add "...for the NRC  !

April 9 Letter" at the end of the sentence.

- Page 2, line $6 - change "24" to "29", and delete

"(excluding'5 post maintenance start attempts)"; change "23" to "21". Line 67 - change #14" to "12".

- Tables #1 & #2 - spell out all abbreviations, except UV and LOSP.

- Table #1, start #148 - Add "Yes" in success column and "Yes" in Unplanned Trip column with the following explanation: " Unit tripped during bubble testing due to one sensor venting and another sensing line being disconnected for testing".

- Table #2, start #136 - Add "No" in Success column and "No" in Unplanned Trip column. Add an asterisk (*) in the success column with the following explanation: "High Temperature Jacket Water alarm was received and the engine ',

kept running" .

- Tables #1 and #2 - delete footnotes at the bottom of both i tables.

Meeting Adjourned .

l e

n i

k l >!

! kl o

--._- _ _ - _ M __MM W . __ _

, . - - . - M. , , ,Q

I j

.n.,,

\

1 PRB 90-111 .

Page 2 of 2 ,l PRB MEETING NINUTES CONTINUATION SEEST A. The board unanimously recommended approval of the Letter to -

NRC for Clarification of Response to Confirmation of Action .

Letter (ELV-02059), with comment. No unreviewed safety question involved. Comments are as follows: E

- Page 1, paragraph #1, next to last sentence - and the -

sentence at the word " error", and delete the remainder of the sentence.

- Page 1, paragraph #2 - change "the OSI" to "a recent NRC l inspection" l

- Page 1, paragraph f3, line il - change " errors" to i

" confusion" 1

- Page 1, paragraph f3, line #3 - ohange " start" to " test";

l line #7 - change " start" to " test" l

- Page 1, paragraph $3, last sentence - add "...for the NRC April 9 Letter" at the end of the sentence.

- Page 2, line $6 - change "24" to "29", and delete

"(excluding'5 post maintenance start attempts)"; change "23" to "21". Line 67 - change "14" to "12".  !

- Tables #1 & $2 - spell out all abbreviations, except UV <

and LOSP. ,

- Table #1, start #148 - Add "Yes" in Success column and "Yes" in Unplanned Trip column with the following  ;

{

explanation: " Unit tripped during bubble testing due to

one sensor venting and another sensing line being '
disconnected for testing".

i - Table #2, start #136 - Add "No" in Success column and "No#

! in Unplanned Trip column. Add an asterisk (*) in the l Success column with the following explanation: "High t i Temperature Jacket Water alarm was received and the engine ",,,

j kept running"

- Tables #1 and f2 - delete footnotes at the bottom of both i tables. '

j Meeting Adjourned l;