Staff Exhibit S-9,consisting of VEGP Plant Review Board Meeting Minutes
ML20085M772
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/16/1995
From: Thomas Greene
GEORGIA POWER CO.
To:
References
OLA-3-S-009, OLA-3-S-9, NUDOCS 9506290332
Download: ML20085M772 (3)


Text

-

. & -f2'/ f25 - & A -b Of/6lf5 E- " 3 " $

VEGP PIANT REVIEW GOARD MEETING MINUTES Staff Exh, II-9 DOCKETED i

MEETING MO.90-111 DATE 8/30/90 pad &SNEC oF a

.afETING CONVENED 8:19 AM/PH; MEETING AD70U D, 93 2 ( y AM/ N I j

(

  • VIA TELECON) j 4

j THIS MEETING CHAIPZD BY:

i T. v. Greene blCEgSpCPETg 0

j (X) CHAIRMAN

( ) VICE CHAIRMAN n

x l

VOTING MEMBERS PRESENT:

J. G. Aufdenkampe M.W. E n PRB SECRETARY A. Rodgers NON-VOTING MEMBERS PRESENT:

G. R. Frederick j

i I

\\

i VOTING ALTERNATES PRESENT:

C.

L. Coursey FOR H. M. Handfinger W. L. Burmeister FOR J. P. Cash l

NON-VOTING ALTERNATES PRESENT:

FOR FOR FOR FOR l

FOR GUESTS / TECHNICAL ADVISORS:

G. Bockhold S. H. Chesnut A. L. Mosbaugh R. M. Odom B. Bonzer (NRC)

PRB ACTION ITEMS OPENED:

None PRB ACTION ITEMS CLOSED:

None eo es:s PRB MINUTES APPROVED None I

_A V

0XLI2c&u.v A&

PRBSECNETARY PRB CHAIRMAN a

.CC: NRC RESIDENT INSPECTOR (FORM NAME=PRBAGEND) 45A4219P

'?ii U3

. 'i i

dE: 7.."1 F-a F

' M)

^T!

NI T

35v 7 sm:lA Jaf.0 IVO KEE4'UO

.7 h 7 l

  • 9 tga 02u03 c3103r39

^"*i'l y

CV.13338 luesddy NU3 C2H!1?SGI

/

y gy pJas w einul 9,g g q g 0N N/3 Inn.

hth O ON P f'00

~

,msm-xusm-o

1 h

l PRB 90-111 Page 2 of 2 PRB NEETING NINUTES CONTINUATION SEEST A.

The board unanimously recommended approval of the Letter to NRC for Clarification of Response to Confirmation of Action Letter (ELV-02059), with comment.

No unreviewed safety E

question involved.

Comments are as follows:

- Page 1, paragraph #1, next to last sentence - and the sentence at the word " error", and delete the remainder of the sentence.

- Page 1, paragraph (2 - change "the OSI" to "a recent NRL inspection"

- Page 1, paragraph f3, line il - change " errors" to

" confusion"

- Page 1, paragraph #3, line $3 - change " start" to " test";

line #7 - change " start" to " test"

- Page 1, paragraph f3, last sentence - add "...for the NRC April 9 Letter" at the end of the sentence.

- Page 2, line $6 - change "24" to "29",

and delete

"(excluding'5 post maintenance start attempts)"; change "23" to "21".

Line 67 - change #14" to "12".

- Tables #1 & #2 - spell out all abbreviations, except UV and LOSP.

- Table #1, start #148 - Add "Yes" in success column and "Yes" in Unplanned Trip column with the following explanation:

" Unit tripped during bubble testing due to one sensor venting and another sensing line being disconnected for testing".

- Table #2, start #136 - Add "No" in Success column and "No" in Unplanned Trip column.

Add an asterisk (*) in the success column with the following explanation:

"High Temperature Jacket Water alarm was received and the engine ',

kept running"

- Tables #1 and #2 - delete footnotes at the bottom of both i

tables.

Meeting Adjourned e

n i

k l

kl o

M MM W.

M.

,,,Q

I j

.n.,,

\\

1 PRB 90-111 Page 2 of 2

,l PRB MEETING NINUTES CONTINUATION SEEST A.

The board unanimously recommended approval of the Letter to NRC for Clarification of Response to Confirmation of Action Letter (ELV-02059), with comment.

No unreviewed safety E

question involved.

Comments are as follows:

- Page 1, paragraph #1, next to last sentence - and the sentence at the word " error", and delete the remainder of the sentence.

- Page 1, paragraph #2 - change "the OSI" to "a recent NRC inspection" l

- Page 1, paragraph f3, line il - change " errors" to

" confusion" 1

- Page 1, paragraph f3, line #3 - ohange " start" to " test";

line #7 - change " start" to " test"

- Page 1, paragraph $3, last sentence - add "...for the NRC April 9 Letter" at the end of the sentence.

- Page 2, line $6 - change "24" to "29",

and delete

"(excluding'5 post maintenance start attempts)"; change "23" to "21".

Line 67 - change "14" to "12".

- Tables #1 & $2 - spell out all abbreviations, except UV and LOSP.

- Table #1, start #148 - Add "Yes" in Success column and "Yes" in Unplanned Trip column with the following

{

explanation:

" Unit tripped during bubble testing due to one sensor venting and another sensing line being disconnected for testing".

i

- Table #2, start #136 - Add "No" in Success column and "No#

in Unplanned Trip column.

Add an asterisk (*) in the l

Success column with the following explanation:

"High t

Temperature Jacket Water alarm was received and the engine ",,,

i j

kept running"

- Tables #1 and f2 - delete footnotes at the bottom of both i

tables.

j Meeting Adjourned l;