ML20085M341

From kanterella
Jump to navigation Jump to search
AO BFAO-7348W:on 731225,during Routine Surveillance Testing, HPCI Turbine Failed to Reach Rated Speed & Flow.Caused by Open Resistor in Woodward Unit Which Supplies 48-volt Dc Power to Governor Control Box.Resistor Box Replaced
ML20085M341
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/04/1974
From: Eric Thomas
TENNESSEE VALLEY AUTHORITY
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20085M343 List:
References
AO-BFAO-7348W, NUDOCS 8311080265
Download: ML20085M341 (2)


Text

c i

m

,s

,),

s.;

j TENNESSEE VALLEY AUTHOAITY iT^ li CHATTANOOGA, TENNESSEE 37401 L i

!. 2-

$UTE5D$N Gl I*

PAATNEASHip 3""""U "> 1974

/g

~

('

'd\\

.),0,4#RK g,

hh f

Mr. John F. O'Learf, Director i, W, J,'erk Directorate of Licensing 7,

.f'* ' T * '

'N Office of Regulation U.S. Atcaic Encrt;y Co=ission k

Washinston, DC 20545

Dear Tr. O' Leary:

TENHESSEE'EALLEY AUTHORITI - 3:10WHS FERRY IR.TCLEAR PLANT UNIT 1 -

DOC:C:T UO. 50-259 - FACILITI OPZ3ATIUG LICEUSE DPR 1.3 HOR!'AL OCCUP. C CE REPORT 3FAO-734El The enclosed report is to provide details concerning HPCI failure i

which occurred on 3rouns Ferri Uuclear Plant unit 1 on December 25, 1973, and is submitted in cecordance with Appendix A to Regulatory

{

Guide 1.16, Revision 1, October 1973.

l Very truly yours, i

TEiHESSEE VALLEY AUTHORITY I

'}

7 / / Cr E. F. Thomas Director of Power Production i

1 Enclosure CC (Enclosure):

Er, Narman C. Moseley, Director Region II Regulatory Operations Office, USAEC l

230 Peachtree Street,131.

Atlanta, GeorSia 30303 I

l g/ 6 REGULATORYLOPERATIONS

$$k1$00$k*oN000$9 PDR LF FILE COPY S

4 2

f 9(

COPY sm REGION-205-i t

s

_a...._.

., ;.j

r O

O

~

ABNOR!@.L OCCURRENCE REPORT Report No.-BFAO-73h8W Report Date--January 4, 1974 Occurrence Date--December 25, 1973 Facility--Browns Ferry nuclear Plant unit 1 Identification of Occurrence HPCI failure.

Conditions Prior to Occurrence The unit was operating at 158o 1.st and 44o Ise.

Description of Occurrence At approxi= ate],y 11:00 p.m., the HPCI turbine failed to reach. rated speed and flow during routine surveillance testing. The control valve came open on initiation, but returned 4-ediately to the closed position.

Desienation of Antarent Cause of Occurrence A resistor was open in the Woodward unit which supplies the 48-volt de power to the EG-M governor control box. Therefore, the governor was unable to give the control valve a proper control signal.-

Analysis of Occurrence Safe shutdown of the reactor would have been possible because the re=aining emergency core cooling systems were-operable.

Corrective Action The resistor box was replaced and a surveillance test was performed to demonstrate operability.

The turbine performed satisfactorily.

Failure Data Resistor box, Woodward,-Part No. 8270-282.

y.

-