Forwards Implementation Plan for Emergency Response Data Sys (Erds),Per 10CFR50,App E,Section (VI)(4)(a). Implementation Will Be Complete by 930213
ML20085M200
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/28/1991
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-91383, NUDOCS 9111050220
Download: ML20085M200 (16)


Text

_

-(

I7 Log i TXX-91383 File i 10035 GL-89-15 71/El ECTRIC REF: # 10CFR50, APP. E October 28, 1991 Willinin J. Oshill, Jr.

c.mm r...aa.

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, O. C. 20555 CDMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

SUBJECT:

DOCKET NOS. 50-445 AND 50-446 EMERGENCY RESPONSE DATA SYSTEM (EROS)

NRC Letter from W. J. Cahill Jr. to Mr. John R. Jolicouer NRC dated REF:

September 20, 1990 and logged TXX-90328.

Gentlemen:

By this letter TU Electric complies with the requirements of 10CFR50 Appendix L (VI)(4)(a) in providing an implementation plan for the Emergency Response Data System (ERDS).

The TV Electric is in the process of changing out the plant computers.

present Prime 750 computers, reported in the EROS survey attached to the 4000-300 computers.

referenced letter, will be replaced by VAX Correspondingly, the operating system will be changed from the Primos 18.3 As a result of operating system to the VMS Version 5.4 operating system.

these changes the Plant Attribute Library (PAL), transmitted as part of the EROS survey, is being re-transmitted as an criclosure to this letter as Please note that the PAL is common required by 10CFR50 Appendix E (VI)(3)(b).Although TU Electric does not expe to both units.

(OPL), aim a prt of the EROS survey, to change substantially, TU Clectric will, as the new computers are installed and tested, reverify the contents of the OFL and inform the NRC of any changes as required by 10CFR50 Appendix E (VI)(3),

10CFR50.72(a)(4) requires that the ERDS be activated as soon as possible but no later than one hour af ter declaring an emergency classification of alert or in order to comply, TV Electric Emergency Plan Proccdures will require activation of the EROS as one of the initial steps in the activation

higher, Activation of the EROS by TSC of the Technical Support Center (TSC).

personnel will relieve control room personnel from performing this extra task.

Revision of TV Electric Emergency Plan Procedures and training to reflect the 13, 1993.

new computer system and EROS in Unit 2 will be complete by February cst N I}

9 m osce2o m_o,m r-

1XX-91383 Page 2 of 2 The Unit 2 plant computer changcout is p.'ojected for July 1992.

10 Electric expects to install the ERDS sof tware and hardware as part of the changeout.

1U Electric will verify operability and compatibility of the NRC supplied modem and ti new plant computer system during acceptance testing of the computer. Any changes identified to the Data Point Library will be submitted prior receipt of the Unit 2 facility operating license.

TV Electric will provide available dates for the installation testing of the LRD$ in accordance with the NRC supplied test procedure when the Data Point Library changes are submitted.

The Unit 1 plant computer changeout is currently projected for fourth quarter of 1993. As in Unit 2, 1U Electric expects tt install the EADS software and hardware as part of the changeout, lU Electric will verify operability and compatibility of the NRC supplied modem and the new plant computer system during acceptance testing of the computer.

The schedule is still tentative and contains uncertainties that could affect completion.

Since the projected completion date is after the implementation date specified in the rule, TV Electric will prepare and submit an exemption request, to the NRC.

10 Electric will submit the exemption request prior to August 31, 1992, and will provide an implementation schedule for ERDS, including Emergency plan procedures and training, when the plant computcr changeout schedule becomes firm Sincerely

$y1h'

> 5t William J. Cahill, Jr.

By:

Wdd dA Roger'D. Walker Manager of Nuclear Licensing JDR/

Enclosure i

c.

Mr. R. D. Martin, Region IV Resident inspectors, CP$ES (2)

1. A. Bergman, NPR M. 8. Fields, NRR Mr. Tony P. LaRosa, HUS 1

l

i.

i i

i l

i PLANT ATTRIBUTE LIBRARY for EMERGENCY RESPONSE DATA SYSTEM-ENCLOSURE 10 TXX-91383 I

l 1

Pay;e 1 of 13 1.

CCNTACTS ENCLOSURE '.

Page 1 of 13 Note:

Please provide name, title, mailing address, and phone numcer.

!arvey C:orcinater .e..

ntact f:r later clars f teation of :yest::rrat et answers);

Jose D.

Rod r i g u e r.. Licensin: E n c, t nc e r 400 ::. Oliva St.,

L.. E l Dallas, T7 75:01 f:14) 612 % 74 3.

l:mouter Marcware 5:ett al1it!$):

Ron Greenthaler, Leaa Entineer

'fexas (Jtili ' u Electt:0 Ccnoany CPSES - : tail Stop C01 P.O.

Box 1002 Glen Rose, O 76043 C.

Systems Software 5:ectalist(s):

$ame as

'3.'

D.

Application level Software Specialist (s):

Same as

'3.'

E.

Teleonone Systans Spectalist(s):

same as

'3.'

%RC 314 sev. J.A N.!9

i 1

Page 2 Page 2 of 13 IV.

[xcept10nt Please note any exceptions which must te taken to Section !! ano explain

.ny.

Tnere are no exceptions taken to Section !!

Rev 3 A NRC 314

'( 19

~

a Page 3 of 13 Pago 3 III.

SELECTION OF DATA FEEDERS A.

Ilow many data f coders are thoro (oix maxhtum) ?

ll 2

- 1 por nach unit I

B, Identify the nelected data fo dors and provido the following for eacht l

(1) a short doncription of the categorien of data pointo it will provido (e.g., mot, rad, or plant data points, by unit).

l CP1 will provido all the described pointo for Unit 1 and CP2 will provida all the doncribed pointo for Unit 2.

(2)

The rationale for selecting it if another nyutom can also provido its categories of data pointo.

i The PCS on cach respectivo unita hao all of the points and all pointo havo boon verified and validated.

1 C.

Which data foodor la the site timo datormining foodor?

Thin should be

-the foodor which in providing the majority of the data points.

For this application, PCS.

4 d

NRC-314 Rev.

0.A N-19 I

,m.,

,.,_._,-_....,_.__._,.........~.m....

..~,..._,--_..~m

....-....._..--....--.,--,,-.-,.,-.m.~.,

-m,--..

Page 4 of'13

.f

,. ?

Page 4

$?;-

9 gY,y/l 5'

IV.

CATA FEEDER I!1FOlu4ATIOt1

. a

t,;o :

A now Section IV must be filled out for each fondor syntom selected.

t

$h A.

General Questions i g :.3 J

65 1.

Identificatior of Data Feodor E -

(CP1) a.

What : :J the namo in local parlanco given to this data foodor (e.g.,

Emergency Responso Information System;?

Pleano give both the at:ronym and the words forming it.

PCS - Plant Computer System Unit 1 I

b.

In this the site timo datormining feeder?

fio c.

Phat is the update frequency of this foodor (in accondo)?

once por recond I

1 11RC-314 Re v. 0.A N-19 l

l

~ -.

4 Pagebof13 Page 5 11..

liardware/Sof tware Environment 1

a.

_1fy the manutacturer and model number of C a data feedor hardware.

VAX 4000-300 b.

Identify the operating system.

VMS Vors. ton 5.4 c.

Pht.t method of timekeeping is implemented on this feeder system C ylight Savings, Standard, Greenwich)?-

Daylight Savings

-d.

In what time zone is this feeder located?

Central l

l I

i NEC-314 Rev. 0.A N-19

Page 6 I'4yte C of 1:1

iit, Da t a Cortmun i c a s :ar:. De t a i l s Can this data feeder provide asynchronous serial data communication (RS.

a.

232 C) with full. modem control?

YES Will this feeder transmit in ASCll or (( '9IC?

b.

ASCII Can this feeder transmit at a serial baud rate of 2400 bos?

c.

'f not, at what baud rate can it transmit?

Yts Does th'e operating system support XON/XOFF flow control?

o.

YES

1. *.rt any problems foreseen with the NRC using XON/X0FF to control :he transmission of data?

I No If it is not feanible to reconfigure a serial port for the EROS linku.

e.

(i.e., change the Daud rate, part ty, etc. ), please explain any.

It is feastble f.

Can the serial r;rt dedicated to the EROS be configured so that the NRC need not emul 4te a specific brand of terminal (t.e.,

can t te configured to be a ' vanilla

  • tenninal)?

iES Rev. 0 A NRC 314 l

N 19 i

.. ~ -

Page 7 I'nge 7 of 13 9

Do any ports currently exist for the EROS linkup?

YES

1. If not. 15 it possible to add additional ports?
2. If yes. will the port be used solely by the EADS or snarea itn other nonemergency time users? Give details.

YES, It will be solely dedicated to ERDS.

i s

1 i

Rev. 0,A NRC 314 N-19

PQge 8 l'ni:e 8 0f l3 Data Feecer Physical Environment and tianagement iv.

Where is the data feeder locited 11 a.

terms of the ISC. E0f and control room?

Control Room Compute. Recm is the data feeder protected from loss :(

0, supply of elettric t:,'

YES is there a human operator for this data feeder?

c,

O

1. If so, how many hours a day is the feeder attended?

Rev. 0.A NRC-314 N 19

___-__--~ ---~ ' ' ' -

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - ~ ~ - ' ~ ~ ' -

IV. DATA FEEDER INF0AMAil0N P"E" U Note:

A new Section IV must be filled out for each feeder system selected A.

General Questions t.

Identification of Data feeder (CP2) 4.

What is the name in local earlance given to this data feecer (e g,

Emergency Response information System)?

Please give t.cth t he acr:nym and the words forming it.

PCS - Plant Computer System

n t t 2

!$ this the site time determining feeder?

D.

NO c.

What is the update frequency of this feeder (in seconds)*

Once per second Q

N.19

n 1

Pago 10 Paen 10 of13 Hardware /Sof tware (nvironment it.

Identify the manufacturer and model number Gf the data feeder hardwa a.

VAX 4000-300 b.

Identify the operating system.

VMS Version 5.4 c.

What method of timekeeping is implemented on this feeder systen (Daylight Savings, Stancard, Greenwich)?

Daylight Savings d.

In what time zone is this feeder located?

Central l

l 1

i Rev. 0.A NRC-314 l

N 19 b

Page 11 pago11oria iii.

Data Communication Details Can this data feeder provide asynchronous serial data communication (RS 3.

232 C) with full modem control?

YES b.

Will this feeder transmit in ASCl! or EBC0!C?

ASCII c.

Can this feeder transmit at a serial baud rate of 7400 bps?

If not, at what baud rate can t transmit?

Y2S Does the operating System support XON/XOFF flow control?

d.

YES

1. Arc any problems foreseen with the NRC using XON/XOFF to control the transmission of data?

NO If it is not feasible to reconfigure a serial port for the EROS linkup e.

(i.e., change the baud rate, parity, etc.), please explain why.

It is feasible f.

Can the serial port dedicated to the ERDS be configured so that th, NRC need not emulate a specific brand of terminal (i.e.,

can it ce configured to be a ' vanilla" terminal)?

(ES Rev. 0.A NRC-314 N 19

Page 12 4

l' age 12 0f l3 9

Do any ports currently exist for she (R05 linkup?

YES

1. If-'not, i s it possible to add additional ports?
2. lf yes, ill the port ce used solely by the EROS or sharea with other nonemergency time users? Give details.

YES, it vill be soloiv dedicated to EADS.

\\

\\

4-4 Rev. 0 A NRC.314 ti-19

.-----ma~--

wy

-p-a m-w-

3

Page 13

  • Pag [t 13 0f13 Data feeder Physical Environc.ent and Management iv.

Where is the data feeder located in terrns of the ISC, EOF, and control 4.

room?

Control R.,om Comeuter Room Is the data feeder protected from loss of supply of ele:tricity?

D.

YES Is there a human operator for this data feeder?

c.

No

1. If so, how many hours a day is the fePoer attended?

l 1

Rev. 0.A 1RC 314 N 19

_-