4
'3h,
5 yb Arizona Public Service Company U rpp,,
r O DOx P1666 e PHOENIX. ARIZON A 85036
/?.
q.q,
August 23, J983 ANPP-27619-BSK/RQT U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Time EYtension for Report - DER 82-80 A 50.55(e) Potentially Reportable Deficiency Relating to Installed Conax Electrical Penetrations Low Insulation Resistance Does Not Meet Qualification Tests File: 83-019-026; D.4.33.2 Re fere nc e: (A)
Telephone Conversation between T. Young and G. Duckworth on December 17, 1982 (B)
ANPP-22736, dated January 17, 1983 (Interim Report)
(C)
ANPP-23642, dated May 3,1983 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by September 14, 1983.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by January 26, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
{
Very truly r
Q
/\\ LLA-E. E. Van Brunt, Jr.
APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr./RQT:
cc: See Page Two 8309120196 830823 IE PDR ADOCK 05000S28 p$.
S PDR f
't,.
ws%
, 'e-
.o U. S. Nuclear. Regulatory Commission Page 2
~
Richard DeYoung, Director cc:
Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R.-L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli.
S..R. Frost J. Self Records Center Institute of-Nuclear Power Operations 1100 circle 75 Parkway - Suite 1500 1