Interim Deficiency Rept DER 83-51 Re Failure of Bingham- Willamette Auxiliary Feedwater Pump to Meet Hot Functional Test Requirements.Bechtel Evaluation Underway.Final Rept Will Be Submitted by 840628
ML20085H623
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/22/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-27606-RQT, DER-83-51, NUDOCS 8309120177
Download: ML20085H623 (3)


Text

- ,

~

@cep asfa Arizona Public Service Company 883ggy P O. BOX 21666 . PHOENIX, ARIZONA 85036

  • /

August 22, 1983 ,

/tf ANPP-27602-RQT/BSK Q. >:,

U. S. Nuclear Regulatory Commission N Region V rg '

Creekside Oaks Office Park-1450 Maria Lane - Suite 210 '[C Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Interim Report - DER 83-51 A 50.55(e) Potentially Reportable Deficiency Relating to Unit 1 Auxilliary Feedwater Pump By Bingham-Willamette Failed To Meet Requirements Of Hot Functional Test File: 83-019-026; D.4.33.2 Re ference: Telephone Conversation between P. Narbut and R. Tucker on August 2, 1983.

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due_to the extensive investigation and evaluation required, an Interim Report is attached. -It is now expected that this information will be finalized by June 28, 1984, at which time a complete report will be submitted.

Very truly yours, C.E L k &ge E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr./RQT:sn Enclosure cc: See Attached Page Two s

8309120177 830822 l PDR ADOCK 05000528 S PDR ~

-)r-[ tq

U. S. Nuclear Regulatory' Commission Page Two cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A.' Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees '

J. R. Bynum P. P. KI.ute/D. D. Green A. C. Gehr

  • W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self

, Records Center i Institute of Nuclear Pcwer Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 l

i l

~

=. .

INTERIM REPORT -DER 83-51 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1 I. Potential _ Problem

1) NCR SM-2396 documents that the turbine driven Auxiliary Feedwater Pump shaft bounces rapidly back and forth at the 135 GPM minimum flow causing the suction piping to vibrate severely.
2) NCR SM-2282 documents that the turbine driven Auxiliary Feedwater Pump, IMAFAP01, does not develop 1 1420 psig discharge pressure at a flowrate of 875 gpm as required by Hot Functional Test 91HF-1Af01. The acceptance criteria is obtained from the PVNGS FSAR, Section 10.4.9.1.1.G.

II. Appr,oach jro _and .Statys Of _Prgposed Resolution Bechtel engineering is currently corresponding with Bingham Williamette and reviewing the PVNGS FSAR to deterime reportability and technical- justification for corrective action. In the meantime, steps are being taken to conduct additional pump tests and to acquire more accurate test data.

III. Projected _Complet. ion ,0f _. Corrective Action and . Submittal of The _ Fin?1 -

Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by June 28, 1984.

t

- . - r- - , .