Forwards Tech Spec Change Request 191 to License DPR-16, Establishing Addl Requirements for Availability of LPRM Associated W/Aprm Sys to Further Restrict Allowable Number of out-of-svc Lprms/Arpms Re Hydraulic Oscillations
ML20085H428
Person / Time
Site: Oyster Creek
Issue date: 10/09/1991
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20085H432 List:
References
C321-91-1148, NUDOCS 9110280274
Download: ML20085H428 (1)


Text

G10 Nuclear Corporation

% Nuc ear = a88 forked River NewJersey087300388 609 971-4000 Writer's utrocl Dial Nuniber:

C321-91-1148 October 9.1991 I U. 5, . Nuclear Regulatory Commission Attonticn Document Control Domk -j Washington, D.C. 20.!5 l contlemons I

Subject:

Oyster Creek Nuclear Generating Station  ;

Docket No. 50-219  ;

l Tochnical Specification Chango noquent No. 191 1

I Pursuant to 10 CFR 50.90, GPUN, oporator of the Oyster Crook Nuclear Generating Station (OCNGS), Facility Operating Liceneo Ne DPR-16, requenta a 1 chango to Appendix A of that liconno. The attachod Technical Specification i Chango Roquent (TSCR) proposee to ootablish additional requirements for the availability of Local Power Range Monitors (LPRM) associated with the Avorago Powor Range Monitoring (APRM) system. Those additional requiremonto will further rostrict the allowable number of out of cervico LPRM/APRM detectors in order to ensura a suf ficient recponen to regional thormal hydraulic oscillations in the Roactor Coro to provont violation of the Minimum Critical Power Ratio (MCPR) safety limit. This TSCR also identifien a lower bound MCPR operating limit for each cycle as identified in thu Coro Operating Limita Report (COLR). Thio limit shall be greator than or equal to 1.47.

We roquent that the NRC staff place an appropriato priority for a timely review of thoco propocod Technical Specification Changon by March 31, 1992.

Thio change request han been reviewed in accordance with Section 6.5 of the OCNGS Technical Specifications, and utilizing the standard in 10 CFR 50.92, wo have concluded that thono proposed changea do not constituto a significant hazardo consideration.

i Also enclosed heroin in GPUN Technic 61 Report Nc. 068, Rev. 2, which provides the detailed basis in cupport of this TSCll.

Pursuant to 10 CFR 50.91(b)(l', a copy of the chango request has boon sent to the stato of New Jersey, Department of Environmontal Protection.

/

f}nc ely / . ,

/

9110280274 911009 J arton

, PDR ADOCK OSO(Xr219 .

v c President and Director, P PDR I yr or Crook j

JJH/EP/ pip g

cc Administrator, Region I NRC Ronident Inspector

'hi Oyotor Creek NRC Project Manager fV l I

n .- . nr GPU Nuclear Corporabon m a subunary of tne Qneral Pubhc Ubhbes Corporahon 4 s) JUOJ

.