Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP OP-0 Re Reactor Trip W/Safety Injection,Ep OP-1 Re LOCA & EP OP-2 Re Loss of Secondary Coolant
ML20085H386
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/12/1983
From: Schuyler J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML16340D778 List:
References
NUDOCS 8309080265
Download: ML20085H386 (3)


Text

_ _ . _ _ _ . _ _ _

. O e e PACIFIC GAS AND ELECTR,IC C O M PANY hbVJ3 h 77 BEALE STREET . SAN FRANCISCO, C AliFORNI A 94106 * (415) 781-4211 . TWx 9:C 3 72 65 '

J.O.SCHUYLER v CE rag 5&c tni mocktae coat. GtweAUO4 August 12, 1983 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory (hmbsion, Region V 1450 Maria Iane, suite 210 Walnut Creek, CA 94596-5368 Re: Ibcket No. 50-275, OL-DPR-76 Docket No. 50-323 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedures Updates

Dear Mr. Martin:

In accordance with Secticn V, " Implementing Procedures," of 10 CFR 50, Appendix E, we are submitting one copy of the updates to the detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan, as listed on Attachment 1. Concurrently, two copies of each update are being subnitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information. 'Ihis privacy / proprietary information has been bracketed in accordance with NRC Generic letter 81-27.

Kindly acknowledge receipt of the above material on the enclosed copy of this letter and return it in the enclosed addressed envelope. l Very truly yours Attachments cc w/att: R. Fish, NRC (Region V)

Document Control Desk (2)

Service List cc w/o att: G. W. Knighton 8309080265 030831 PDR ADOCK 05000275 F PDR

}l l

{ _ _ _ _ - - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(f AITAONENT 1 Updates Included In This Submittal Volume 3A rodated Table of Contents EP OP-0, Revision 4 EP OP-1, Revision 6 EP OP-4B, On-The-Spot-Qvulge ,

EP OP-6, Revision 6 EP OP-8, Revision 6 EP OP-23, Revision 3 EP R-1, Revision 10 EP R-2, Revision 4 EP R-6, Revision 6 EP R-7, Revision 3 EP M-1, Revision 10 EP M-2, Revision 9 EP M-4, Revision 7 EP M-6, Revision 8 EP M-7, Revision 5 EP G-2, On-The-Spot Qange ,

i Volume 3B Updated Table of Contents EP m -1, Revision 2 EP RB-7, Revision 2 EP RB-8, Revision 2 EP RL-9, Revision 1 EP EF-4, Revision 2 EP EF-5, Revision 3 i

O

A'ITAONENT 2 Iocation of Proprietary / Privacy Information EP R-1, Revision 10 Pages 2 of 15, 10 of 15 and 15 of 15.

Attachnent " Personnel to be Contacted for Reporting of Injuries at Diablo Canyon" both pages.

EP R-6, Revision 6 Pages 1 of 10, 3 of 10, 6 of 10, 7 of 10 and 8 of 10 EP R-7, Revision 3 Pages 9 of 10 and 10 of 10 EP M-1, Revision 10 Pages 1 and 3 of 4 Attachnent " Personnel to be Contacted for Reporting of Injuries at Diablo Canyon " both pages.

Appendix Z Page 1 of 1 EP M-2, Revision 9 Page 1 of 3 Appendix Z Page 1 of 2 EP M-4, Revision 7 Pages 15 through 35 of 40 EP M-6, Revision 8 Pages 1 of 10, 3 of 10, 7 of 10, 8 of 10 EP M-7, Revision 5 Page 2 of 5 EP G-2, On 'Ibe-Spot-01ange Emergency Organization Call List, all of 28 pages.

EP CR-1, Revision 2 Table 1, pages 2 of 9, 3 of 9, 5 of 9, 6 of 9, 7 of 9 EP EF-4, Revision 2 Pages 1 of 8, 2 of 8, 3 of 8 8 of 8 Attachment 1, page 1 of 1 EP EF-5, Revision 3 Pages 2 of 39,11 of 39,12 of 39,16 of 39, 27 of 39 Attachnent 1 page 1 of 1 Attachnent " technical Support Center Q1ecklist", pa6e 2 of 3 Attachment 'hergency Operation Facility Equipment Attachment "Evacuation Quantity Checklist", pageQ1ecklist",

Kit Inventory 3 of 5 page 2 of 2 Attachnent 'hergency Kit Inventory Q1ecklist", page 1 of 4 -

EP RB-8, Revision 2 Pages 3 of 49, 7 of 49, 29 of 49, 42 through 44 of 49

-7 g - ,..- , , ,,._- -w r.