ML20085H386
| ML20085H386 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/12/1983 |
| From: | Schuyler J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML16340D778 | List: |
| References | |
| NUDOCS 8309080265 | |
| Download: ML20085H386 (3) | |
Text
_ _. _ _ _. _ _ _
O e
e PACIFIC GAS AND ELECTR,IC C O M PANY hbVJ3 h
77 BEALE STREET. SAN FRANCISCO, C AliFORNI A 94106 (415) 781-4211. TWx 9:C 3 72 65 '
J.O.SCHUYLER v CE rag 5&c tni mocktae coat. GtweAUO4 August 12, 1983 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory (hmbsion, Region V 1450 Maria Iane, suite 210 Walnut Creek, CA 94596-5368 Re: Ibcket No. 50-275, OL-DPR-76 Docket No. 50-323 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedures Updates
Dear Mr. Martin:
In accordance with Secticn V, " Implementing Procedures," of 10 CFR 50, Appendix E, we are submitting one copy of the updates to the detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan, as listed on Attachment 1.
Concurrently, two copies of each update are being subnitted to the Document Control Desk.
Some of the updates contain privacy / proprietary information. 'Ihis privacy / proprietary information has been bracketed in accordance with NRC Generic letter 81-27.
Kindly acknowledge receipt of the above material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
l Very truly yours Attachments cc w/att:
R. Fish, NRC (Region V)
Document Control Desk (2)
Service List cc w/o att:
G. W. Knighton 8309080265 030831 PDR ADOCK 05000275
}l F
PDR l
{
(f AITAONENT 1 Updates Included In This Submittal Volume 3A rodated Table of Contents EP OP-0, Revision 4 EP OP-1, Revision 6 EP OP-4B, On-The-Spot-Qvulge EP OP-6, Revision 6 EP OP-8, Revision 6 EP OP-23, Revision 3 EP R-1, Revision 10 EP R-2, Revision 4 EP R-6, Revision 6 EP R-7, Revision 3 EP M-1, Revision 10 EP M-2, Revision 9 EP M-4, Revision 7 EP M-6, Revision 8 EP M-7, Revision 5 EP G-2, On-The-Spot Qange i
Volume 3B Updated Table of Contents EP m -1, Revision 2 EP RB-7, Revision 2 EP RB-8, Revision 2 EP RL-9, Revision 1 EP EF-4, Revision 2 EP EF-5, Revision 3 i
O
A'ITAONENT 2 Iocation of Proprietary / Privacy Information EP R-1, Revision 10 Pages 2 of 15, 10 of 15 and 15 of 15.
Attachnent " Personnel to be Contacted for Reporting of Injuries at Diablo Canyon" both pages.
EP R-6, Revision 6 Pages 1 of 10, 3 of 10, 6 of 10, 7 of 10 and 8 of 10 EP R-7, Revision 3 Pages 9 of 10 and 10 of 10 EP M-1, Revision 10 Pages 1 and 3 of 4 Attachnent " Personnel to be Contacted for Reporting of Injuries at Diablo Canyon " both pages.
Appendix Z Page 1 of 1 EP M-2, Revision 9 Page 1 of 3 Appendix Z Page 1 of 2 EP M-4, Revision 7 Pages 15 through 35 of 40 EP M-6, Revision 8 Pages 1 of 10, 3 of 10, 7 of 10, 8 of 10 EP M-7, Revision 5 Page 2 of 5 EP G-2, On 'Ibe-Spot-01ange Emergency Organization Call List, all of 28 pages.
EP CR-1, Revision 2 Table 1, pages 2 of 9, 3 of 9, 5 of 9, 6 of 9, 7 of 9 EP EF-4, Revision 2 Pages 1 of 8, 2 of 8, 3 of 8 8 of 8, page 1 of 1 EP EF-5, Revision 3 Pages 2 of 39,11 of 39,12 of 39,16 of 39, 27 of 39 Attachnent 1 page 1 of 1 Attachnent " technical Support Center Q1ecklist", pa6e 2 of 3 Attachment 'hergency Operation Facility Equipment Attachment " Quantity Checklist", page 3 of 5 Evacuation Kit Inventory Q1ecklist", page 2 of 2 Attachnent 'hergency Kit Inventory Q1ecklist", page 1 of 4 EP RB-8, Revision 2 Pages 3 of 49, 7 of 49, 29 of 49, 42 through 44 of 49 e
-7 g
-w r.