ML20085H024

From kanterella
Jump to navigation Jump to search
AO BFAO-50-260/7414W:on 740920,drywell Equipment Primary Containment Isolation Valve FCV 77-15B Failed.Caused by Sticking solenoid-operated Valve.Valve Changed Out & Cycled Several Times.Foreign Matter Found in Armature Housing
ML20085H024
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/30/1974
From: Eric Thomas
TENNESSEE VALLEY AUTHORITY
To: Case E
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20085H029 List:
References
NUDOCS 8308300104
Download: ML20085H024 (2)


Text

j; R

TENNESSEE CHATTANOOGA, VALLCL_,) TENNESSEEAUTHOF! iTTY !~~Wl *\'77p" ; '

. h ,z

~ .

l , y ' 374 0'1 G \ J l0

,7},!w Gq;

, ,f -

.' ~;. =R :>

' September 30, 1974  : SE"dEEEEE

r. P A CIT N E n r4 H l4

' . g*

\.;h

., y,l i s, rs w -( .s-m,4

.: & w cy,L Mr. Edson G. Case .

h$

~

Acting Director of Licensing

~

I Office of Reg'.11ation

, f' U.S. Atomic Energy Conniccion

.. Washington, DC 20545

Dear Mr. Case:

TETHESSEE VI.LLEY AUTHORITI - BROWS FERRY HUCLit.R PINIT UNIT 2 -

, DOCKET NO. 50-260 - FACILITY OPERATING LICENSE DPR /J3HORMAL OCCURRE:CEREPORTBFAO-50-260/7414U The enclosed report is to provide details concerning failure of the drywell equiprent drain primary contain:nent inolation valve FCV 77-15B

. cnd is submitted in accordance with I.ppendix A to Regulatory Guide 1.16,

! Revision 1, October 1973. This evcnt occurred on Browns Ferry I!uelear

, Plant unit 2 on September 20, 1974.

Very truly yours,

-- {

TEHKESSEE VALLEY AUTHORITY

/// 0' gry ,,p i fa, E. F. Thomas l fy Director of Fouer Production I-Enclosure.

CC (Enclosure):

Mr. Norman C. Moseley, Director l Region II Regulatory Operations Office, USAEC 230 Peachtree Street,liW., Suite 818

4 1

i 83083OO g4 0 h 0 1 PDR ADO PDR g ,* p" l ] ,

f,m 10262 I

    • '"*7A** M 'WR^% *HM ea4 e-weg s sq etq_ss ,

q - 4 , , ,

4 s * ' *-

  • s

~

[ -

+ - '

- COPY SENT REGIOld - -

a f. a ,

.e.

i

  • ABITORMAL OCCURREHCE ICPORT Report Ho.: DF/.0-50-260/7414W Report Date: September 30, 1974 Occurrence Date: September 20, 1974 Fe.cility: Browns Ferry Huelcar Plant unit 2 Tdentification of Occurrence Failure of the drywell equipment drain primary containment isolation valve FCV 77-15B.

Conditions Prior to Occurrence The reactor was at approximately 2-percent power.

Descrintion of Occurrence While attempting to close the dryvell equipment drain sump pump primary containment -

isolation valves from the control room, FCV 77-15B failed to close.

Desirnation of Aprarent Cause of Occurrence The solenoid-operated valve, FSV 77-15B, suppling air to the air-operated valve, FCV 77-153, was sticking.

Analysis of Occurrence At the time of failure of FCV 77-153,' the other valve, FCV 77-15A, closed. This satisfied technical specification requirements calling for at least one of the. .

vtaves to be in the code corresponding to the isolated condition when there is an inoperable isolation valve in that line. This failure caused no damage to~ J any systems, components, or structures. There were no adverse effects on the health or safety of the public as a result of this failure.

Corrective Action The solenoid valve was changed out. The valve was then cycled several times, y operating satisfactorily each tine. The solenoid.ves disassembled to determine.

the cause of sticking. Particles of foreign material vere found in the armature housing probably causing the armature to stick. j .i Failure Data .,) .

The colenoid valve is manufactured by Versa Products Company with the following nameplate:

1 Valve, _ solenoid product No. USG-3521, suffix detail U-14-15-21-31.

A previous failure of this type of solenoid valve on unit 1 was reported in BFAO-7351W.

e e D y, '.

l u_____-_________.m_m_m--__.___------------_--------a---