ML20085H016
| ML20085H016 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/03/1973 |
| From: | Green H TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20085H013 | List: |
| References | |
| NUDOCS 8308300073 | |
| Download: ML20085H016 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4Tts Posr4 MdMATLA ATL 0
ana cm wo--
!9l tuestem union LC dbN O
!uk 2-085796P2 46 09/03/73
.sq
.IOS IPPDNGZ CSP w
l 2057298316 PGM TDBN DECATUR AL 100 09-03 OC35P EST I ZIP 30303 0
O US ATOMIC ENERGY COMMISSION REGENT TWO DIRECTORATE OF REGULATORY OPERATIONS 230 PEACHTREE ST NORTHWEST O i ATLANTA GA 30303 l
O
~
O CORE SPRAY LOOP ONE FAILED TO DELIVER THE REQUIRED SLOW OF 6250 G PM A T R EQ UIR ED PR ESS UR E WHI LE I N TH E TOR US TO TORUS TEST MODE g
DURING ROUTINE SURVEI LLANCE TESTING AUGUST 2 1973. LOOP TWO TESTED SATISFACTCRILY. THE REACTOR WAS IN THE COLD SHUTDOWN CONDITION AND PREPARATIONS FOR INITIAL NUCLEAR HEATUP WERE IN O
PR OGR ESS H J GREEN BR OWNS FERRY NUCLEAR PLANT g
1836 E5 T MGMATLA ATL O
O O
O 0
0 8308300073 730912 O
PDR ADOCK 05000259 I
i S
,o '
(
l
.