ML20085H016

From kanterella
Jump to navigation Jump to search
Telecopy Ao:On 730902,core Spray Loop I Failed to Deliver Required Flow of 6,250 Gpm at Required Pressure
ML20085H016
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/03/1973
From: Green H
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20085H013 List:
References
NUDOCS 8308300073
Download: ML20085H016 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4Tts Posr4 MdMATLA ATL 0

ana cm wo--

!9l tuestem union LC dbN O

!uk 2-085796P2 46 09/03/73

.sq

.IOS IPPDNGZ CSP w

l 2057298316 PGM TDBN DECATUR AL 100 09-03 OC35P EST I ZIP 30303 0

O US ATOMIC ENERGY COMMISSION REGENT TWO DIRECTORATE OF REGULATORY OPERATIONS 230 PEACHTREE ST NORTHWEST O i ATLANTA GA 30303 l

O

~

O CORE SPRAY LOOP ONE FAILED TO DELIVER THE REQUIRED SLOW OF 6250 G PM A T R EQ UIR ED PR ESS UR E WHI LE I N TH E TOR US TO TORUS TEST MODE g

DURING ROUTINE SURVEI LLANCE TESTING AUGUST 2 1973. LOOP TWO TESTED SATISFACTCRILY. THE REACTOR WAS IN THE COLD SHUTDOWN CONDITION AND PREPARATIONS FOR INITIAL NUCLEAR HEATUP WERE IN O

PR OGR ESS H J GREEN BR OWNS FERRY NUCLEAR PLANT g

1836 E5 T MGMATLA ATL O

O O

O 0

0 8308300073 730912 O

PDR ADOCK 05000259 I

i S

PDR

,o '

(

l

.