ML20085G591

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Surveillance Requirements 4.20.3.c.1 & 4.7.10.3.c.1 for Units 1 & 2,respectively,deleting Requirement for Visual Internal Cell Insp of Diesel Fire Pump Battery
ML20085G591
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/15/1991
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20085G590 List:
References
NUDOCS 9110250128
Download: ML20085G591 (7)


Text

m; x

s l3,5( 'e

e,

' PROPOSED TECilNICAL SPECIFICATION CilANGES

-FOR ANO-1,.

i 4

f 1

l9110250128 911015 DR - ADOCK 05000313 PDR

~....;_---....,...__

4.20.2 The f tre pump dicsol engino shall be demonst rated OPERADI,E:

n.

At least once por 31 days by verifying the fuel storage mny tank to be at least 5/8 full of fun) (approximately 155 gallons).

b.

At innst once por 92 days ty % rifying that a sample of diesel fuel from the fuel storngo t ank, obtainnd in accordance with ASTH-D270-65, is within the acceptablo limits specified in Tablo 1 of ASTE 3975-74 with respect to viscosity, water content and sediment.

c.

At least caco per 18 months, during shutdown, by subjncting the dicant to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.

4.20.3 The firo pump diesel starting 24-volt battery bank and charger shall bo demonstrated OPERABhE:

n.

At least onco por 7 days by verifying that:

1)

The electrolyte level of each battery is above the plates, and 2)

The overall battery voltago in 224 volts, b.

At lonst once per 92 days by verifying that the specific gravity is appropriate for continued service of thn battery, c.

At Innst once por 18 months by verifying that:

1)

The batteries and battery racks show no visual l

indiention of physical damngo or abnormal deteriorations, and 2)

Tho battery-to-battery and termluni connections are clean, tight. free of corrosion and coated with anti-corrosion material.

t Amendment No. 30 110r

PROPOSEl' TECllNICA1, SPECIFICATILN CilANGES F01 ANO-2

- J

.= PLANT SYSTEMS-SURVEILLANCE REQUIREMENTS-(Continued) t c.

At least once por 18-months by verifying that:

1.

Thn'batterlesandbatteryracksshownovisunl-indientionofl.

physical damage or obnormal deterioration, and 2.

The battery-to-battery and terminal connections are clonn, LJght. free of corron ton and coated wit.h anticorrosion material.

Y r(

u v

P

~,

7 ARKANSAS - UNIT 2 3/4 7-32

.-s

+

MARKED UP ORIGINAL SPECIFICATION (PROVIDED FOR INFORMATION ONLY)

e 4.20.2 The fire pump diesel engine shall be demonstrated OPERABLE:

At least once per 31 days by verifying the fuel storage day a.

tank to be at least 5/8 full of f uel (approximately 1%

gallons),

b.

At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTH-0270-65, is within the acceptable limits specified in Table 1 of A5TM-0975-74 with respect to viscosity, water content and sediment.

At least once per 18 months, during shutdown, by subjecting the c.

diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.

4.20.3 The fire pump diesel starting 24-volt battery bank and charger shall be demonstrated OPERABLE:,

p a.

At least once per 7 days by verifying that:

1)

The electrolyte level of each battery is above the plates, and 2)

The overall battery voltage is 224 volts, b.

At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery, c.

At least once per 18 months by verifying that:

1)

The batter 1ES.-- C ll SI M d hattery_racki._show nn visual indication of physical damage or abnormal deterioration, and 2)

The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated with anti-corrosiort material.

t emendment No. 30 110r

3

.e4

- (*

4-PLANT SYSTEMS SURVEILLANCE RE00fREMENTS (continued)

At least once per 18 months by verifying that:

c.

1.

The batteries _ -  ;';t.: nd battery racks show no visual indication of physical damage or abnormal deterioration, and 2.

-The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated with anticorrosion

material, t

9 b

6 9

ARKANSAS - UNIT 2 3/4 7-32 i

i.

['

_