ML20085F759
| ML20085F759 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/03/1974 |
| From: | Slade G CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20085F748 | List: |
| References | |
| NUDOCS 8308230172 | |
| Download: ML20085F759 (4) | |
Text
... - _- - -..
k 83 -
t.E *e +
1 Tele 9 ram
=
mestern union
' vv n__
m:' HU
,r -.-;
~
g VEB065(0941)(l-005205A184)PD 07/03/.
0935 r
IL4 CONSPOWEli JKN g3 J
^
b ZCZC 002 7 74 JACKSON MICH 76 % ""
^
DIVISION OF COMPLIANCE RE3 ION III
(
^
@g)
~
GLEN ELLYN, IL
. f?
ll l-(
g-r si 1040 HOURS JULY 2, 1974 MONTHLY TECH SPEC TEST RUN OF DIESEL
^
3E NERA TO R l-1 VAS CONDUCTED IN ACCORDANCE WITH TEST PROCEDURE l
c U-7.
THE DIESEL FAILED THE TEST IN THAT IT WAS NOT READY FOR
[
](
LOA 9ING UNTIL ELEVEN SECONDS AFTER START SIGNAL.
TECH SPEC li it i
SECTION 4.7.1 A REQUIRES DIESEL READY FOR LO ADING WITHIN TEN \\i
^
v SEC0ND3.
t' 0308230172 740715 d
PDR ADOCK 050002g j
P
$F 1201 (R5 *1) g
}
s 9
t i?
estern UQlopEE*
~
Telegram
/s W
ii w.
(
A #ECIAL PLANT REVIEW COMMITTEE MEETING WAS CONVENED AT 1300 HOURS TO EVALUATE PROBLEM.
THE COMMITTEE REVIEWED BOTH THE
(
OPERATING AND MAINTENANCE HISTORY OF THE DIESEL.
IT W A S CO N-CLUDED THAT THE MOST PROBABLE CAUSE OF THE DELAY IN STARTING r
WAS THAT THE FUEL OIL SYSTEM WAS NOT FULLY PR!MED.
k' COMMITTEE RECOMMENDED THAT DIESEL BE RETESTED kHEN DIESEL COOLS DOWN TO CONFIRM THAT WE NO LONGER HAVE A PROBLEM OTHER THAN FUEL OIL HEADER PRIMARY AND THAT A CHECK SHEET BE DRAWN UP AND IM-
?LEMENTED SUCH THAT PERSONNEL PRIME THE FUEL OIL HEADER DAILY.
COMMITTEE ALSO ASSIGNED PLANT EN3INEERING DEPARTMENT THE T ASK OF FURTHER INVESTIG ATION AND TESTING 'TO ATTEMPT TO SHOW MORE CONCt.USIVEtY THAT THE PROBLEM IS INDEED FUEL OIL PRIMING.
i i
(
sr tact (nS4e>
+
\\
"WM e
Tele ram mestern union sv s
AT A r't'ho X I MA TE L Y 1500 tiUUHS 7/2/ 74 THE DIESEL WAS AG AIN TESTED nuo naalN IO0h ELE JEN SECOWJS TO STANT.
If W6J DifEhMINED f ifA T A T B O T ri 1040 AND 1500 HOUR TEST ONE OF THE T'*'O NORMALLY AVAILABLE AIR START M0 TORS WAS NOI IN OPEHATION.
THIS WAS DONE INTENTIONALLY TO TEST AIR MOTORS INDEPENDENTLY OF EACH OTHER.
I'!D ADDIFIONAL TESTS WZHE THEN RUN USIN3 FIRST THE OTHER AIR STAhT MOT 0h AND THEN BOTH AIR START MOTORS, WHICH IS HOW SYSTEM IS NORMALLY TO BE USED.
THE TEST TIMES VEHE 9.7 AND 9.9 SECONDS, it ESPECT IVEL Y.
,,,, g_g ADD I T IO NAL TEST WAS R UN A T 0700 7/3/74 UITH BOTH AIR START i
1 r'
3,3 ' S Telearam
- mestern union w
ti!S sv dJIOnS ANO DIESEL SfAHTED IN 9.6 SECONDS.