Telecopy AO AO-22-74:on 741010,low Flow Trip Setpoints for Three & Two Primary Coolant Pump Operation Found to Be Below Tech Spec Limit.Caused by Use of Incorrect Figures in Calculating Setpoints
ML20085F592
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/11/1974
From: Flynn J, Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20085F589 List:
References
AO-22-74, NUDOCS 8308230036
Download: ML20085F592 (9)


Text

,

J-J.MJ M

  • Tele ram.

tuestem umon w

1976 0CT l l Fj; ;: l7 VEB219(1558)(l-028815C284)PD 10/11/74 1545 TLX CONSPOWER JKN

.}

ZCZC 004 DLY ' JACKSON MICHIGAN 10 @ 74 PMS US ATOMIC ENERGY COMMISSION

}N [-

799 ROOSEVELT ROAD k

BY_.1)

TE D TIME /ONA A D4 PTS ELIVER.

9 30,jo/OR ghj

/g g Ja 9 6, g

/

1.

REPORI NO - A0-22-74, DOCKET

%~

2.

A.

REPORT DATE 11-74 53 8.

OCCURRENCE DATE 10-74

/\\.,

3.

FACILITY - PALISADES PLANT gaggo360500 5

yr.im ns.>

g PDR M, M

' Telegram 4.

IDENT[FICATION OF OCCURRENCE -

LOW FLOW TRIP SETPOINTS FOR 3 PCP AND 2 PCP OPERATION FOUND TO DE BELOW TECHNICAL SPECIFICATIONS LIMIT.

5.

CONDITIONS PRIOR TO OCCURRENCE -

PLANT OPERATING IN 4 PCP CONFIGURATION AT POWER LEVEL OF X 30 PER-CENT.

6.

DESCRIPTION OF OCCURRENCE -

A.

A PPOSSIBLE VIOLATION WAS DETECTED 10-3-74 WHEN P-CE-3962 sr.im <nne>WAS REVIEWED AND IT WAS FOUND THAT PRESENT SETPOINTS APPEARED

k

' Tele 9 ram mas u.

t usestern union res LESS CONSERVATIVE THAN THOSE RECOMMENDED IN P-CE-5962.

THIS INFORMATION WAS VERBALLY RELAYED TO RON COOK ON 10-4-74.

B.

FURTHER ANALYSIS OF AVAILABLE INFORMATION VAS CONDUCTED BOTH AT THE PLANT AND IN THE GENERAL OFFICE AND ON 10-10-74 A PRC MEETING WAS HELD AT THE PLANI WITH FIVE MEMBERS OF THE GENERAL OFFICE STAFF PRESENT.

AT THIS TIME IT WAS DETERMINED THAT THE SETPOINTS FOR 5 PUMP AND 2 PUMP OPERATION WERE BELOW IECHNICAL SPECIFICATION LIMITS.

7.

APPARENT CAUSE -

7

.--..-.--..nm.Trun TDTP 4FTPOINTS FOR W EE

  • Tele 9 ram

.-x usestern union s si ALL PUMP COMBINATIONS IT WAS ASSUMED THAT FLOW WAS EQUAL TO THE SQUARE ROOT OF DP - BASED ON A4 PUMP DP AS 100 PERCENT - FOR ALL PUMP CONFIGURATIONS.

IT HAS BEEN DETERMINED THAT THE SQUARE ROOT RELATIONSHIP IS ONLY A VALID ASSUMPTION WHEN THE FLOW CORRESPOND-ING TO EACH PUMP CONFIGURATION IS ASSUMED TO BE 100 PERCENT FLOW IN CALCULATING EACH IRIP SETPOINT AND THE PERCENT OF 4 PUMP FLOW CON-VERTED TO A PERCENT OF 5 PUMP - OR 2 PUMP - FLOW TO ESTABLISH THE MINIMUM TRIP SETPOINY.

ORIGINAL CALCULATIONS SHOWED THAT 90 PERCENT OF 5 PUMP FLOW - AND 2 PUMP - WAS MORE CONSERVATIVE THAN THE CALCULATED MINIMUM SETPOINT

, AND THIS VALUE WAS USED.

THE TRIP SETPOINT BECAME --

I l

\\

semOWIRIP/ EQUALS 0.9E2 X DP5 1

b

8 tele ram R A E E.E mestern union -

sv EQUALS 0.81 X DP5 HOWEVER, ASSUMING MEASURED 5 PsMP FLOW - F3 - EQUALS.758 0F MEASURED 4 PUMP FLOW - F4 - AND USING 71 PERCENT OF 4 PUMP FLOW TRIP AS A SETPOINT, THE PREVIOUSLY CALCULATED SETPOINT IS SHOWN TO BE IN ERROR.

E.G.

F5 EQUALS.75dF4 F/THIP/ EQUALS

.71F4 EQUALS

.71 73

.758 8F 12Cl (RS4 )

e I

^

w

- Western, union DP5/ TRIP / EQUALS

.71 E2 X DP5

,758 A SIMILAR ANAYYSIS ALSO SHOWS THAT THE 2 PUMP TRIP SETPOINT WAS AL SO BELOW TECHNICAL SPECIFICATIONS LIMITS.

6.

ANALYSIS OF OCCURRENCE -

SINCE THE PLANT HAS NOT OPERATED IN THE 2 OR 5 PUMP CONFIGURATION AT POWER NO SAFETY LIMITS WERE VIOLATED.

ALSO BECAUSE ALL INFORMA-TION USED TO DETERMINE THE TECHNICAL SPECIFICATION LIMITS IS NOT IMMEDIATELY AVAILABLE, THE DETERMINATION AS TO POSSIBLE SAFETY

' W PROBLEMS HAD THE PLANT OPERATED IN THESE MODES HAS NOT BEEN ANALY2ED

_ _ - - - - = _.

1

l c-
  • Tele ram I
5.E.5 E.5

=

toestern union.

I w

l 9.

CORRECTIVE ACTION-l CORRECTIVE ACTION RECOMMENDED BY THE PLAN

)

A.

INITIATE ADMINISTRATIVE CONTROLS TO LIMIT REACTOR OPERATION

^

j IN THE 2 PUMP MODE TO THE HOT STANDBY CONDITION UNTIL THE PROPER l

FLOW TRIP SETPOINTS ARE ESTABLISHED.

^

B.

SET THE HIGH POWER TRIP SETPOINT FOR 5 PUMP OPERATION AT 25 PERCENT POWER.

THIS IS BASED ON THE FACT THAT NORMAL 2 PUMP OPERATION ALLOWS 25 PERCENT REACTOR POWER, AND THE 5 PUMP FLOW TRIP SETPOINT PRESENTLY ESTABLISHED I WELL ABOVE Tile 46 PERCENT

_ _ 4._..

r e c u core ifarT roR 9 PilMP FLOW.

GIVEN THAT FLOW EXCEEDS THE t

I k_-!

NM

  1. ele ram T

' M tuestern union

=s.

l l

l MINIMUM ALLOWABLE FOR 25 PERCENT, THE POWER LEVEL OF 25 PER-CENT IS CONSERVATIVE.

C.

CP C0 IS ALREADY ENGAGED IN DISCUSSIONS WITH COMBUSTION EN-GINEERING TO ESTABLISH JUSTIFICATION FOR NEW LOW FLOW IRIP SET-POINTS.

WHEN THIS DATA BECOMES AVAILABLE, A TECH SPEC CHANGE WILL BE INITIATED TO ALLIEVIATE THE PRESENT SITUATION.

10. FAILURE DATA -

NOT APPLICABLE l....

-~..

l i

f Wu Tele ram tuestern union i

w !

i G B SLADE/J P FLYNN PALISADES PLANT ALL H0 CC-R 8 SEWELL R L HAUETER NNNN l

?

DCT 1 g 197_;

s sF-1201 (R$-69) l

.,,--,---,,-,n