1 OPERATING IEA RGCRT DOCKrF NO. 50-364 DA2B October 7, 1991 CQtPLEI?D BY D. N. Morey TELEPHONE (205)S99-5156 OPERATING S MTUS
~ Etest
- 1. Unit Names Joseph M. Farley - Unit 2
- 1) 0.mulative data since
- 2. Reporting Period:
August 1991 7-30-81, date of
- 3. Licensed normal Power (tHt):
2,552 commercial operation.
- 4. Nameplate Rating (Gross PWe) _
860
- 5. Design Electrical Rating (Net tHe):
829"
- 6. Maximum Dependable Capacity (Gross PHe):
864.2
- 7. Maximum Dependable Capacity (Net lHe):
82T.'0-
- 8. If Changes Occur in Capacity Ratings (ltems Number 3 3 rough 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net IMe):
N/A
- 10. Reasons For Restrictions, If Any N/A
'1his Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744 5,831 88,440
- 12. Number Of Hours Reactor Was Critical 724.2
- 13. Reactor Reserve Shutdown Hours 0.0 5,551.1 75,935.3 0.0 175 3
- 14. Hours Generator On-Line 716.3 5,448.3 74,999.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
~
- 16. Gross hermal Energy Generated (tEH) 1,874,009 14,123,923
_191,327,872
- 17. Gross Electrical Energy Generated (tWI) 604,202
"'4,538,354
__62,794,310
- 18. Net Electrical Energy Generated (iWd) 574,3D2 4,357,382 59,551,504
- 19. Unit Service rector 96.3 93.4 84 3
- 20. Unit Availability Factor 96.3~
~
93.4 84 3
- 21. Unit Capacity Factor (Using MDC Net) 93.7 90.7 82.2 l
- 22. Unit Capacity Factor (Using DER Net) 93.1 ~
90.1 81 2
~
- 33. Unit Forced Outage Rate 3.7~~
4.4 4.3
- 24. Ghutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
_N/A
- 25. If Shut Dcm1 At End Of Report Period, Estimated Date of StartTup: N/A
- 26. Units In Test Status (Prior to Commercial Oparation):
Forecast Achieved INITIAL CRITICALITY 05 1
05/08/81 INITIAL ELECTRICITY U
1 35725/81 cove 2CIAL OPERATION I
07/30/81
~
rora 2/30 91102102 5 911014 pop p, DOC F 05000364 g