1 OPERATING IEA RGCRT DOCKrF NO. 50-364 DA2B October 7, 1991 CQtPLEI?D BY D. N. Morey TELEPHONE (205)S99-5156 OPERATING S MTUS

~ Etest

1. Unit Names Joseph M. Farley - Unit 2
1) 0.mulative data since
2. Reporting Period:

August 1991 7-30-81, date of

3. Licensed normal Power (tHt):

2,552 commercial operation.

4. Nameplate Rating (Gross PWe) _

860

5. Design Electrical Rating (Net tHe):

829"

6. Maximum Dependable Capacity (Gross PHe):

864.2

7. Maximum Dependable Capacity (Net lHe):

82T.'0-

8. If Changes Occur in Capacity Ratings (ltems Number 3 3 rough 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net IMe):

N/A

10. Reasons For Restrictions, If Any N/A

'1his Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 5,831 88,440
12. Number Of Hours Reactor Was Critical 724.2
13. Reactor Reserve Shutdown Hours 0.0 5,551.1 75,935.3 0.0 175 3
14. Hours Generator On-Line 716.3 5,448.3 74,999.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0

~

16. Gross hermal Energy Generated (tEH) 1,874,009 14,123,923

_191,327,872

17. Gross Electrical Energy Generated (tWI) 604,202

"'4,538,354

__62,794,310

18. Net Electrical Energy Generated (iWd) 574,3D2 4,357,382 59,551,504
19. Unit Service rector 96.3 93.4 84 3
20. Unit Availability Factor 96.3~

~

93.4 84 3

21. Unit Capacity Factor (Using MDC Net) 93.7 90.7 82.2 l
22. Unit Capacity Factor (Using DER Net) 93.1 ~

90.1 81 2

~

33. Unit Forced Outage Rate 3.7~~

4.4 4.3

24. Ghutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

_N/A

25. If Shut Dcm1 At End Of Report Period, Estimated Date of StartTup: N/A
26. Units In Test Status (Prior to Commercial Oparation):

Forecast Achieved INITIAL CRITICALITY 05 1

05/08/81 INITIAL ELECTRICITY U

1 35725/81 cove 2CIAL OPERATION I

07/30/81

~

rora 2/30 91102102 5 911014 pop p, DOC F 05000364 g

PD9 4