Text
F...
Aw.na swe, con nai4 40 inwmen renNo hd wer list Orfap 0;u t"p, (WfruhyWti, Autinnia 3* P01 Triephane N!i Ot n !Sid
- w. n. iwrm.a. m h
bi.nna yg n Pecadent ome,a < ve.n.
AlilbilnlilPOWef October 14, 1991 Docket No. 50-364 U. S. Nuclear Regulatory Conunisslon ATIN: Document Control Desk Washington, D. C.
20555 Joseph M. farley Nuclear plant Unit 2
_.thulhlLOR0HlinLURLROR0rl_.
Gentlemen:
Attached is the September 1991 Monthly Operating Report for Joseph M.
f arley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.
Also included is a revision to the August 1991 Unit 2 Operating Data Report which incorporates a correction to the Cummulative Unit c.apacity f actor (using MDC not).
If you have any questions, please advise, Respectfully submitted, f 4,/ /rblI_h 1
W. G. Itairston, 111 AEJ:cdb3014 Attachments cc: Mr. S. D. fbneter Mr. S. T. lloffman Mr.
G'. f. Maxwell
^
a 9110100?!O 910930 PDR
(\\ DOCK 05000364 k
R PDR
JOSCPM N. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS September 1991 on September 7 at 2300, ramp-down was initiated to approximately 60 percent to perform governor valve testing and for repairs to an electro-hydraulic leak on 2B steam generator feedwater pump. Tne unit returned to 100 percent power on September 8 at 1045.
There were no unit shutdowns during the month.
The following major safety-related maintenance was performed during the month:
1.
Miscellanee: Sporrective and preventive maintenance was performed on the diesel generators.
2.
2E service water pump motor was replaced and returned to service on 9-28-91.
l t
.