ML20085E613

From kanterella
Jump to navigation Jump to search
Telecopy RO ER-76-003:on 760209,eddy Current Testing Revealed Greater than Expected Steam Generator Tube Degradation
ML20085E613
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/10/1976
From: Bixel D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Baker K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20085E610 List:
References
RO-76-003, RO-76-3, NUDOCS 8308150435
Download: ML20085E613 (1)


Text

f C 'lN

& ^

O to l%m cY!35,or><.

t Ca v

j b

Wt3.5 4.4 ILL g

Wil A60Y VHEA WUA 141' J P ll3P CST O

JED141(1345)(1-018099C041)PD 02/10/76 1342 ILh GONSPOWER JKN ECEC 303 DLY JACKSON MICH 2/10/76 PM5 nR K R BAKER g

idoCLE A Tt REGULATORY COMMISSION (FORMERLY AEC)

-E 7b ROOSEVELT RD GLEi4 ELLY'1, IL IE

=

y SU5 JECT PALISADES PLANT PRELIGINARY EDDY CURRENT INSPECTION RESULTS ER-i6-OP3 InI3 IS TO CONFIRM YESTERDAY S TELECON BETWEEN R B DE WITT AND g

h R BAKER CONCERNING PRELIMINARY RESULTS OF THE PALISADES STEAM g

GENERATOR INSPECTION.

THESE RESULTS INDICATE THAT SOME STEAM hg mum

>O

=

GENERATOM TURES HAVE DEGRADED MORE THAN EXPECTED.

,63-2

.E E

D A BIXEL E

PALIJADES PLANT 2

CONGU.iEftS PO'1E3 COMPANY

=

i iiV:.i ILL j:UAUCYWHEA FFF f M 3g W

{

8308150435 760224 say PDR ADOCK 05000255 W

S PDR

-