Telecopy Ro:On 761209,one Sequencer in Left Channel Failed to Run Completely Through During Safeguards Sys Online Tests.Caused by Improper Sequencer Resetting
ML20085E432
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/10/1976
From: Lewis J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Baker K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20085E430 List:
References
NUDOCS 8308110440
Download: ML20085E432 (1)


Text

-

[

12 -W-%

7lm m

e M

ro OV i

Vd A1CY WHEA i

Vo nVN ILL WJ4%74 DB 318P CST e

j S

V E A14 7 C 1524) (2-3P.1183C3 AS) PD 12/19/76 1521

[

uu n IL A CONSPOWEN JKN S

EGs, G JJ3 DLY JACKSON MICHIGAN 12-lff-76 5

W!S Mn K BAKEM u

N0 GLEAM RE'iULATORY COMMISSION 3

/roitMEitLY US ATOMIC ENEM3Y COM/

7 e M00SF.VELT 30AD tilt.a El. LYN, IL 6f4137 m

fnid IS NOTIFICATION OF A REPORTABLE EVENT WHIC W

Al FAL134 DES.

h IN THE LEFT CHANNEL FAILED TO R A

3F.f]dENCER f HE

.'t I 3HT CHANNEL WAS THEN TESTED FOR OPERABILITY a.a.2F AND ONE OF ITS TWO SEQUENCEMS FAILED SIMILARLY.

y PuWEM REDUCTION WAS IMMEDIATELY STARTED PER REQ PLANT PROHLEMS WEME TMACED TO IMPM0PER SEQUENCER RES S.

BOTH ETTING AND COR-t ma

\\

$\\

O RbCTIVF TDJUSTMENTS MADE WITHIN ONE HOUR.

l 3

TEdTr.D auCCESSFULL f AFTEM MEPA IM.BOTH CHANNELS WERE 8309110440 761221 M

PDR ADOCh 0S000255 S

ti:

pop N

CU;

. 3 DE WITT h

1) A BIXF.L

'b J 1 LEWIS / PALISADES PLANT /

"h CONSU:1E:ts POWER COMPANY 212 W MICHI3AN AVE h

At.l. H0

]jWdA'ICYWMEA Wd MVN ILL t

DEC 101976

(

- - - - -