ML20085E347

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1991 for Grand Gulf,Unit 1
ML20085E347
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/30/1991
From: Cottle W, Daughtery L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-91-00172, GNRO-91-172, NUDOCS 9110180185
Download: ML20085E347 (5)


Text

- - - _ - - - - - - - - - - _ __ _ - _ _

?.. &

ntrgy

-:,E RTg="~ 'a-erations

+<

+ =

www,,,

.,~.~.~...+.+-.-_._,~-_-m-~_

m,

.. ~

. + - ~ - - - - - - ~ ~ - - - - - - + - - + -

W.T.Cotde mo.,

Ortolier 14.-1991

,"l

,m U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.

20555 q

Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 i

License No. NPF-29 Monthly Operating Report GNR0-91/00172 l'

Gentlemen:

.In accordance with the requirement of Technical Specification 6.9.1.10 Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for SeptembV 1991-(attachment).

-In the August 1991 Monthly.0perating Report, the monthly, year-to-date and cumulative generator on-line hours were incorrectly-reported as

639.0, 5,303.6 and 45,317.3, respectively.. The corrected values are 568.1, 5,232.7 and 45,246.4.-

q If you have any questions or require additional information, please contact this office.

Yours truly,

/

. ppm

);;

WTC/TKM/cg attachments: 1. -Operating Status 2.- Average Daily Power Level 3

3.

Unit Shutdowns and Power Reductions L.

cc:.

(See next page)

W i

9110180185'910930 PDR ADOCK 05000416 1 R PDR g

l M00PSEPT p

,g.

, 1._ _ _

[.

~'

i e

o October 14. 1991 GNRO-91/00172-Page 2 of 3 cc Mr. D. C. Hintz (w/a)

Mr. J. L. Mathis (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S. Nuclear Regulatory Comission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 l

Mr. P. W. O'Connor, Project Manager OfficeofNuclearReactorRegulation(w/a)

U.S. Nuclear Regulatory Comission Mail Stop 13H3 Washington, D.C.

20555 t

t t.

l' i

M00PSEPT,

1:

Attachment I to GNRO-91/00172 i

1 DOCKET NO.

50-416 DATE

_ 10/D&791 COMPLETED BY

~ TEGIT07:ght ery L. f. Dau lH4 TCLEPHONE OMRATING STATUS 1.

Unit Name: GGNS UN!'.' 1

~liotes:

~

2.

Reporting Period: September 1991 3.

Licensed Thermal Power (MWT): 3BTDiWT I

4.

Nameplate Rating T372.5 MWE 5.

Design Electrical (Gross MWE): Rating _ (Net fWe): TfE0~1NE

6.. Maximum Dependable Capacity (Gross MITE): ITF0~fM Maximum Dependable Capacity (Not HWo : !!43 MWE l

-If Changes 0; cur in Capacity Ratings)(Items Number 3 lhrough 7)~5TnceTast Report.

7.

8.

Give Reasons N/A (Net MWe):

TUA Power Level To Wl11ch Restricted, in Any /A-9.

10. Reasons for Restrictions, If Any:

N e

i 1his Month Yr to Day Cumulative

11. Hours In Reporting Period 720 6.551 60 873
12. Number of Hours Reactor Was Critical-

~~77D~~~

6.121.3 4H%, BIET

13. Reactor Reserve Shutdown Hours 6

D~

0

14. Hours Generator On-Line 720 5,95F7 45,966 4
15. Unit Reserve Shutdomi Hours 0

0 0

~al 988 333 E696,404

16. Gross Thermal Energy Generated (HWH)

L75 F

2 2

17. Gross Electrical Energy Generated (MWH) 66 7,DD6,9M

~30 070 493 725

~47,

,N

18. Net Electrical Energy Gee rated (MWH)

~61,

6.718,D3 78 3

19. Unit Service factor 100.0 9
20. Unit Availability factor 100.0~

90.9 7B 3

21. Unit Capacity factor (Using MDC Net) 1~6TT 89 7 74.2
22. Unit Capacity Factor (Using DER Net) 92.7 82 T 67.2

~~

23.. Unit Forced Outage Rate 0

9.1 6.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ~of fach):

None

25. If Shut Down At End of Report Period.

Estimated Date of Startup:

NA 26.-Units In Test Status (Prior to Commercial Operation).

Forecast Achieved INITIAL CRITICALITY 08/18/82 COMMERCIAL OPERATION 10/20/84 INITIAL ELECTRICITY 07/01/85 l

M00PSE?T/SCMPFLR

' to GNR0-91/00172

$ i DOCKEY NO.

50+416 UNIT I

OATE T075E/71 E.~f. Daughte COMPLETED BY EDTT41TQp4~l 10LEPHONE MONTH September 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1152.6 17 1149.9 i

2 1153.0 18 1151.6 3

1153.0 19 1180.1 4

1156.3 20 1183.9 _

5 1155.4 21 1174.3

'6 1155.0 22 1164.2 L

7 1151.5 23 1157.1 8

1152.3 24 1163.4 _

9 1151.6 25 1178.5 10 1151.2 25 1175.8 11' 1154.7 27 1183.8 12 1154.4 28 1128.4 e

13 1151.6 29 1171.8 14 1125.4 30 1166.4 15 1154.3 16 1151.1 M00PSEPT/SCMPFLR

=

- tG i

GNRO-91/00172 -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-416 UNIT NAME 1

DATE 10/08/91 COMPLETED BY L. F. Daughtery 1

TELEPHONE 601-437-2334 i

REPORT MONTH September 1991 i

[ ]l No. !

l l

l l

l Method of l Licensee l l

l Cause & Corrective l

Date l Type ] Duration! Reason (Shutting Downj Event i System l Component l Action To

[

j l

l (1) l Hours l

(2)

Reactor l Report #

l Code l Code l

Prevent Recurrence l

1 l

i l

l l

l (3)

{

l (3) l (5) 1 (C&CA) l l

1 I

l 1

I I

1 l

4

.lNone j l

{

l l

l l

l l

l i

1 l-1 I

I I

I I

I J

i j

UNIT SHUTDOWNS AND POWER REDUCTIONS i

1 2

3 4

i F: Forced Reasen:

Method:

Exhibit G - Instructions 5: Scheduled A-Equipment Failure 1-Manual for Preparation of Data i.

(Explain) 2-Manual Scram Entry Sheets for L~icensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)

C-Refueling 4-Continued File (NUREG-0161)

D-Regulatory Restriction 5-Reduced load i

E-Operator Training &

6-Other L

Licensing Examination j

F-Administrative 5

]

G-Operational Error Exhibit 1-Same Source j

(Explain)

M-Other (Explain) i

]

I i

M00PSEPT/SCMPFLR L

b