ML20085E307
| ML20085E307 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/27/1983 |
| From: | Axelrad M LOWENSTEIN, NEWMAN, REIS, AXELRAD & TOLL |
| To: | Strumwasser M CALIFORNIA, STATE OF |
| Shared Package | |
| ML20085E309 | List: |
| References | |
| ISSUANCES-OL, NUDOCS 8308010257 | |
| Download: ML20085E307 (1) | |
Text
e l
I~
s.
~^
LAlt' C FFIC ES IX)WENSTEIN, NzwMAN, REIa & Axztran, P. C.
102S CON NECTICUT AVENUE, N. W.
WAS HINGTON, D. C. = O O36 saca m newman peAA3LD F. St.S
- ,"fll.'3"'*
=O====-=400 J. A. SOU m m.GMT, Ja eHCM AE L A. Sau t t p DOWLA S 0. OS C E N ROSERT LOwtNSTOP
.p-DAYID O. Pow ELL f'
l OF COumSEL 9
,mLYIN N. SWTTER M AN hlr s.Estoonte.awr8
['
asun?g.S senta py.' *d oftysm p.raamer f,7(
JeLLE.oma=T p,,
y.
r m
..eB....,
July 27, 1983 ]:
Jt,L e91983 s p.gr
.o u
.u oc -
n L_.,
oo m os.$.L.....~
~
?
e.n N';.
Michael J. Strumwasser, Esquire 9tN
- sN Special Counsel to the Attorney
' L ::
General 3580 Wilshire Boulevard Suite 600 Los Angeles, CA 90010 Re:
Pacific Gas and Electric Company (Diablo Canyon Nuclear Project, Units 1 and 2), Docket Nos.
Dear Mr. Strumwasser:
I have enclosed the " Response Of The Independent Design Verification Program To Governor Deukmejian's Second Set Of Interrogatories."
A verification statement has been attached to these Interrogatory Responses signed by Dr. William E.
Cooper, Program Manager for the IDVP.
Dr. Cooper was not able to have this verification statement notarized in time to file this Response within the period perraitted under the Commission's regulations.
The IDVP will therefore submit, under separate cover, a signed and notarized copy of the verification statement within the next 10 days.
Sincerely, Maurice Axelrad MA/smw Enclosures cc:
Diablo Canyon Service List h
8308010257 830727 h' -.
PDR ADOCK 03000275 G
_