Application to Revise Tech Specs of License DPR-23 Changing Frequency of Surveillance of Boron Concentration in Boron Injection Tank
ML20085D384
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/14/1973
From: Bessac N
CAROLINA POWER & LIGHT CO.
To: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20085D381 List:
References
NUDOCS 8307250301
Download: ML20085D384 (2)


Text

--

7 O O

$ (i - d61 Carolina Power & Light Company

/x--  %

03 I

March 14, 1973 g g

?y '

p (R lq(x'sopR< 'og ,

Mr. D. J. Skovholt '

Assistant Director for Operating Reactors (D ,

f;

ph Directorate of Licensing Y United States Atomic Energy Commission Washington, D. C. 20545 ' .

s,y 4 -

H. B. ROBINSON UNIT NO. 2 LICENSE DPR-23 REQUEST FOR REVISION OF TECHNICAL SPECIFICATIONS SURVEILIANCE OF BORON CONCENTRATION OF BORON INJECTION TANK

Dear Mr. Skovholt:

In response to your ccccern with the possibility of inadvertent dilution of boron in the boron injection tank of H. B. Robinson Unit No. 2 as expressed in your letter of February 27, 1973, Carolina Power & Light

' Company concurs that the frequency of surveillance of the boron concentra-tion in the tank should be increased from the present once per month to a frequency commensurate with the importance of boron injection as the .

backup system for shutting the reactor down.

Based on our submittals of September 28, November 10 and November 29, 1972, in which we informed you of equipment and administrative changes to prevent local concentration and precipitation of boron in the boron injection system, we feel that a surveillance frequency of once per week is adequate to provide the reactor operator with information that will lead to corrective action before a limiting condition for operation is violated. In addition, since the dilution problems have occurred subsequent to actuation of the safety injection system, we feel the boron concentration should be checked immediately following any actuation of the system that could cause such a dilution.

Therefore, we request that the following changes be made in the Technical-Specifications for H. B. Robinson No.'2 to incorporate the above-mentioned modifications:

Hf Section Requested ChanRe E 4.1, Table 4.1-2, Item 5 Under the heading,." Frequency", change Y " Monthly" to " Weekly (6)"; under the

.M. heading, " Maximum Time Between Tests",

.M

'bb (Continued on page 2) 1 8307250301 730412

~- $ s?'\ . 1803 A

PDR ADOCK 05000261 P PDR b /3 .

336 Fayetteville Street . P. O. Box 1551. Raleigh, N. C. 27602 -

O O Mr. D. J. Skovholt March 14, 1973 Section Requested Change 4.1, Table 4.1-2, Item 5 (Cont'd) change "45 days" to "10 Jays"; add note: "(6) The boron concencration in the boron injection tank shall be checked immediately after any actuation of the safety injection system that might result in dilution of the boron injection tank."

. Very truly yours, BT lesWe Manager Nuclear Generation DBW/za cc: Mr. C. D. Barham Mr. B. J. Furr Mr. D. V. Menscer Mr. E. E. Utley 4