ML20084U803

From kanterella
Jump to navigation Jump to search
Notifies That Installation of Generator Breaker on North Anna Unit 2 Will Be Completed During Next Refueling Outage
ML20084U803
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/18/1991
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-172, NUDOCS 9104220328
Download: ML20084U803 (2)


Text

_ _ - - _ _ _ _ _ _ __

s ..

VIHOINIA ELecTine Axu PownH Conmxy RiennoNo,Vinoix A unuGI April 18, 1991  ;

United States Nuclear Regulatory Commission Serial No. 91 17L Attention: Document Control Desk NAPS /JHL Washington, D.C. 20555 Docket Nos. 50 338 50 339 License Nos. NPF-4 NPF 7 Gentlemen:

VIRGINlA ELECTRIC AND POWER COMPANY HQBIH ANNA POWER STATION UNIT NOS.1 AND 2 GENERATOR BREAKER INSTALLATION GENERAL DESIGN CRITERION 17 ANALYS[S Virginia Electric and Power Company letter dated January 29,1986 provided an analysis regarding the installation of a generator breaker on North Anna Unit 2 and load shed scheme removal plans on North Anna Unit 1. The analysis was submitted for NRC approval sad to ensure continued compliance with General Design Criterion 17.

NRC letter dated February 19,1991 granted approval of the installation of a generator breaker on North Anna Unit 2 and load shed scheme removal plans on North Anna Unit 1. The safety _ evaluation that accompanied the NRC letter discussed that ihe completion of the generator breaker installation on North Anna Unit 2 was planned for the first shutdown of North Anna Unit 2 following NRC staff review.

This letter is to notify you that the installation of the generator breaker on North Anna Unit 2 will_not be completed during the next refueling outage. The modification has been deferred. Completion of the. Unit 2 generator breaker installation will be evaluated for inclusion into the Nuclear. Operations five year plan.

If you have any questions, please contact us.

Very truly yours,

, ^ r~ l' dL\

W. L. Stewart 1VV Senior Vice President- Nuclear

((2 gggj Q s j j

J

) .

cc: U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station