Interim Deficiency Rept Re Failure of Governor on Emergency Diesel Generator B.Replacement Governor Installed.Governor Returned to Vendor Woodward Governor Co,Who Will Furnish Info on Exact Nature of Failure
ML20084U662
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/01/1973
From: Gerald Williams
TENNESSEE VALLEY AUTHORITY
To: Kruesi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084U431 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8306290166
Download: ML20084U662 (1)


Text

-

o O O TENNESSEE VALLEY AUTHORITY M CHA'ITANDOGA, TENNESSEE i

/A

. . 37401 L

$NIS5UNE

"^""""S"'"

June 1, 1973 -

}'~(f JH(

A v' Mr. F. E. Kruesi, Director Directorate of Regulatory Operations K

U.S. Atemic Energy Commission Washington, DC 205h5

Dear Mr. Kruesi:

On May h, 1973, TVA made initial report to AEC-DRO Inspector W. S. Little of the failure of the governor on Browns Ferr" Nuclear Plant unit 1 emergency diesel-generator B. In accordance with paragraph 50.55(e) of 10 CFR 50, we submit the following formal report of the failure.

On February 28, 1973, diesel-generator B was found to be unstable when paralleled to the system. The instability decreased some-what when the load was increased, but the load could not be raised above 1200 kW; rated continuous load capacity of the unit is 2600 kW. A defective Zener diode was located in the power supply of the governor and replaced. The unit was run again on March 16, 1973; the problem persisted. The governor was then replaced with one from one of the other diesel-generator units. Diesel-generator B then performed satisfactorily. A replacement governor was obtained and installed. The unit operated satisfactorily with the replace-ment governor on April 2,1973 The defective governor was returned to the Woodward Governor Company on April 2h,1973.

The governor is a type EG-A. The engine is a General Motors E!D-GM Model 999-20.

Woodward has been requested to furnish information as to the exact nature of the failure. We expect to receive this information in time to provide a final report of the incident by July 31, 1973.

Very truly yours,

.w G t.b. L hic j, Godwin Williams, Jr. /

Assistant Manager of Power CC: Mr. Norman C. Moseley, Director i Directorate of Regulatory Operations U.S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, NW.

Atlanta, Georgia 30303 8306290166 740617 ,

PDR ADOCK 05000259 i' S PDR l