ML20084U446
| ML20084U446 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 06/04/1974 |
| From: | Gilleland J TENNESSEE VALLEY AUTHORITY |
| To: | Knuth D US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084U431 | List: |
| References | |
| NUDOCS 8306290048 | |
| Download: ML20084U446 (1) | |
Text
,
ENNESSEE VALLEY A DAITY CHATTANOOGA, TE ESSEE 37401 5 W
40 June 4, 1974 gN ygA,SQ PAATNEFISHIP Mr. D. F. Knuth, Director T
Directorate of Regulatory Operations U.S. Atomic Energy Commission Washington, DC 20545
Dear Mr. Knuth:
Our letter to F. E. Kruesi, dated July 9, 1973, submitted a final report on the failure of a Channel A Traveling Incore Probe (TIP) cable and detector at Browns Ferry Nuclear Plant unit 1.
This report described as a permanent solution proximity-type limit switches that would be installed on unit 1 as soon as available from GE and on units 2 and 3 before fuel loading.
At the time our report was submitted, the proximity-type limit switch had not been developed.
Subsequently, it has taken longer to develop than originally anticipated. TVA intends to make the interim modification on unit 2 before fuel loading as was done on unit 1 and to install the switch as soon as it is available. We anticipate this will be not later than the first refueling outage for units 1 and 2 and will be before fuel loading for unit 3.
The interim modification is described in the above mentioned July 9 letter.
Very truly yours, f
J. E. Gilleland Assistant to the Manager of Power l
CC:
Mr. Norman C. Moseley, Director I
Directorate of Regulatory Operations U.S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, NW.
Atlanta, GA 30303
\\
}
- f I
v di 9
8306290048 740617 S
PDR V, '.
Or I PDR ADOCK 05000259
~
4 1?25 L
t