ML20084U593

From kanterella
Jump to navigation Jump to search
Provides Addl Info Re AO 50-254/75-4 Concerning Misposistioned Fuel.No Gross Fuel Failure Occurred as Result of Misorientation.Ge Interested in Inspecting Misoriented Fuel Assembly
ML20084U593
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 03/25/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: Oleary J
Office of Nuclear Reactor Regulation
Shared Package
ML20084U597 List:
References
NJK-75-153, NJK-75-81, NUDOCS 8306290133
Download: ML20084U593 (1)


Text

_ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _

s Co writh Edison I,)

^^'

Ouad es Gen: rating Station

/ s.

I I

Post Office Box 216 4-

/c/~

Cordova, Illinois 61242 Telephone 309/654-2241

/',

r.4, u.

NJK-75-153 N;{ y l

s gg March 25, 1975

.s

\\

g.

Mr. John F. O ' Le a ry, Director s

Directorate of Licensing Regulation 4-U.

S.

NUCLE AR REGULATORY COMMISSION Washington, D.

C.

20545

REFERENCE:

Quad-Cities Nuclear Powe r S ta tion, Unit 1, NRC Docket No. 50-254, DPR 29, Previous Abnormal Occurrence Report No. 50-254/75-4.

Dear Mr. O' Leary:

1 In the referenced report conce rning mispositione d fuel in the Quad-Cities Unit 1 co re, it was indicated that the misoriente d assembly would be sipped to determine if there was any gross failure of the fuel cladding.

Detection o f cladding f ailure via sipping is based on comparison of samples from a large number of fuel assemblies that operated under the same conditions.

There are no assemblies to form a background for comparison and it was re co gnize d that only a failure that would have resulted in the release o f large quantities of ff==ien pr: ducts tc the coolant could be detected.

Since the time of our report to you, Unit 1 has re turne d to power operation.

The operational off gas rele as e rate and off-gas response to power ch an ge is identical to that p rio r to the removal o f the mis-oriented assembly.

It has th e re fo re been concluded that no gross fuel failure had occurred as a result of the misorien tation and that no further investigation with methods available at Quad-Cities will yield use ful info rmation.

General Electric has expressed an in te res t in disassembly and inspec-tion of the misoriented fuel assembly.

You will be informed of the results if this inspection is conducted.

Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITI 'S LEAR WER STATION f

  • / '

A&

N.

J. Kalivianakis

'W, Station Superintendent l

NJK:SRH/dkp cc: