Ro:On 740216,only Two Licensed Operators on Site for Approx 40 Minutes.Caused by Error in Scheduling Licensed Operator Work Periods.Situation Reviewed W/Personnel
ML20084S986
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/03/1974
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8306200360
Download: ML20084S986 (2)


Text

,- o ,

(T xs,- ' , s ,

v) W'i -u (v;

3

( s S 1'>  :\ ,A C -

7, o

% CORSulnerS E D'1' ' l g' j i Power V" company b

oy %7 j/

Generet Offices: 212 West 82Ekan Avenue, Jackson. MmNgan 49201. Area Code 017 788-0550 April 3, 1974 Mr. John F. O' Leary, Director Re: Docket 50-255 Directorate of Licensing License DPR 20 US Atomic Energy Commit,sion Washington, DC 20545

Dear Mr. O' Leary:

OnFebruary16,197)N, a situation arose in which there were only two licensed operators on the site at the Palisades Plant for a period of approximately 40 minutes. Technical Specifications 6.1 3 require three licensed operators to be on the site at all times.

This event was discussed with a representative of Region III of the Directorate of Regulatory Operations and we agreed that it would be reported even though it was not classified as a reportable event.

The event occurred because of an error in scheduling licensed operator work periods and as a result relief was not provided for one licensed operator at the end of his normal working schedule. As the licensed operator had not been informed ahead of time that he would be expected to work an additional hour, he felt that he had the right to leave at the time he would normally be relieved. Neither he nor the supervisore present at the plant site at that time recognized that Company procedures require personnel in this job classification to be properly relieved regardless of whether or not overtime has been correctly scheduled.

Since that occurred, the situation has been reviewed with the Plant Operations Superintendent and the shift supervisors. They now understand that an operator or a shift supervisor is expected to stay on the job until properly relieved and that operators can be re-quired to work a reasonable amount of overtime even if not scheduled ahead of time.

We believe that the Palisades Plant's shift supervisors now understand the ramifications of this type of .11tuation and that wp will not find ourselves in this position again. /

/

gqqMo g. F

.m 8- 4 aoos

O Mr. John F. O' Leary, Dircctor O 2

-Docket 50-255 License,DPR 20 April 3,1971+

At the time this incident occurred, the plant was shut down with all fuel stored in the spent fuel pool.

Yours very truly, Ralph B. Sewell (Signed)

RBS/ds Ralph B. Sewell Nuclear Licensing Administrator CC: JGKeppler, USAEC i