ML20084S942

From kanterella
Jump to navigation Jump to search
Telecopy Ao:During Review of Refueling Surveillance Calibr Sheets,Pressurizer Pressure Sensors PT-0102 Were Noted to Have Drifted Down.Vendors Recommendations Sought
ML20084S942
Person / Time
Site: Palisades 
Issue date: 04/16/1974
From: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084S940 List:
References
NUDOCS 8306200301
Download: ML20084S942 (3)


Text

,

v-I' O

'A2w

,,, m,,,

[~h, UNITED STATES

~

?

.}J.

l ATOMIC ENERGY COMMISSION

) Q' -

DIRECTOR ATE OF REGULATORY OPER ATIONS REGION lli

  1. '81f $ '**-

799 ROOSEVELT ROAD ygtgpgoug GLEN ELLYN, ILLINOIS Go137 (312)858-2660 i

l A.

RO Inspection Report No.

^

E Transmittal Date Distribution:

Distribution:

R0 Chief, FS&EB R0 Chief, FS&EB RO:HQ (5)

RO:HQ (4)

DR Central Files L:D/D for Fuels & Materials Regulatory Standards (3)

DR Central Files Licensing (13)

RO Files R0 Files B.

RO Inquiry Report No.

Transmittal Date Distribution:

Distribution:

R0 Chief, FS&EB RO Chief, FS&EB RO:HQ (5)

RO:HQ DR Central Files DR Central Files Regulatory Standards (3)

RO Files Licensing (13)

RO Files

=

l C.

Incident Notification From: Consumers Power Co. Docket No. 50-255 (Licensee & Docket No. (or Licensa No.)

Transmittal Date

April 24, 1974 Distribution:

Distribution:

.R0_ Chief d S&ER_

R0 Chief, FS&EB RO:HQ (4)

RO:HQ (4)

Licensing (4)

L:D/D for Fuels & Materials DR Central Files DR Central Files RO Files RO Files

/

)\\

i f,

~

\\

\\

e,s s

8306200301 740426 (A

/ i PDR ADOCK 05000255 S

PDR

/[

h

.pww eu+j

+

h

-n a

u m ani-r -

.g.

r m

f' LILE M V

  1. Tele rani mestern union sv
1..

.7.

i

(. '1 VEB277(1320)(1-019900A106)PD 04/16/74 1316 TLX CONSPOWER JKN ZCZC 005 JACKSON MICHIG AN 4-16-74 PMS MR ED JORDAN

. aw m. -

.u n ';.

~

" PN'4 F MM -

USAEC OD8 ul_iC,_[$b khd j

^

REGION III Syd7-~

799 ROOSEVELT ROADate did_Ll-l ll GLENELLYN,ILh4h.:of k r[ libI-Oc0 or B'f }

3, t

---~~~~~~A X WHILE REVIEWING THE REFUELING SURVEILLANCE CALIbHATION SnEETS IT WAS NOTED THE PRESSURIZER PRESSURE SENSORS PT-0102 HAD DHIFIED DOWh

-INDICATING ION.

THIS CAUSED A MORE CONSERVATIVE SETTING Oh PRES-SURIZER HIGH PRESSURE TRIP PA-0102H buT A LESS C0hSERVATI',E SETIING l

ON SAFETY IhJECTION SIGNAL PIC-0102LL.

InE LARGEST SENS0rt DHIFT WAS l

PSI - TWO PERCENT.

SYSTEM SETTIhGS HAD bEEN ESTABLISHED ASSUMING r-f,,,,, ggQ3 j

j WM 9

  1. Telehram

/s mestern union sv GTlL.

..m

{.

E ' ' '

,s r

A FIVE PSI

.5 PERCENT DRIFT AS SPECIFIED BY THE VENDOR.

THUS TWO CHANNELS C AND D WERE FOUND l'i PSI: LOWER 'THAN REQUIRED TECH SPEC

~

SETTINGS AS LISTED IN 3.16.1.2. AND CHANNEL A W AS S PSI LOW.

SINCE THESE PHESSURE TRANSMITTERS WEHE SPECIALLY MODIFIED BY (HE VENDOR TO WITHSTAND MHA CONDITIONS, VENDOHS HECOMMENDATIONS ARE BEING SOUGHT.

R B DE WITT CONSUMERS POWER COMPANY PALISADES PLANT IIM ALL DBW l

NNNN SP-1201 4 R$ 99) t

-.- __.