Forwards Test Rept for Unit 2 Second Periodic Rcb Integrated Leakage Test,Completed on 950305
ML20084S328
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/05/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20084S330 List:
References
LCV-0618, LCV-618, NUDOCS 9506120067
Download: ML20084S328 (1)


Text

r-Georgia Power Canpany 40 inverness Center Parkway Post Oftce Box 1295 Birm+ngham Alabama 35201 Telephone 205 877 7122 Georgia Power C. K. McCoy

%ce Pres 4ent. Naciear

- voce Promd June 5, 1995

"" #^*'" *'""' S A'**

LCV-0618 Docket Nos. ' 50-425 U. S. Nuclear Regulatory Commission ATTN: Document ControlDesk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT REACTOR CGNTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST REPORT Attached is the test report for the second periodic Reactor Containment Building Integrated Leakage Test for Vogtle Electric Generating Plant - Unit 2. The test was completed on March 5,1995. All measured leakage rates met acceptance limits.

Sincerely,

,k C. K. McCoy Attachment CKM/HWM/gmb cc: Geprgia Power Company Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR l

Mr. B. R. Bonser, Senior Resident Inspector, Vogtle l