ML20084R351

From kanterella
Jump to navigation Jump to search
Amends 202 & 205 to Licenses DPR-44 & DPR-56,respectively, Correcting Administrative Errors in Section 4.11.A of TS
ML20084R351
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/30/1995
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Philadelphia Electric Co, Public Service Electric & Gas Co, Delmarva Power & Light Co, Atlantic City Electric Co
Shared Package
ML20084R354 List:
References
DPR-44-A-202, DPR-56-A-205 NUDOCS 9506090267
Download: ML20084R351 (8)


Text

4 gJLKfg y

UNITED STATES j

j NUCLEAR REGULATORY COMMISSION 4

WASHINGTON, D.C. 30806 4 001

\\,...../

PECO ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 202 License No. DPR-44 1.

The hu: lear Regulatory Commission (the Commission) has found that:

A.

Thel application for amendment by PECO Energy Company, et al,i(the licensee) dated February 10, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the 1

Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health or safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Tec*nnical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:

1 9506090267 950530 PDR ADOCK 05000377 P

PDR

4 1

l (2) Technical Soecifications The Technical Specifications coa ained in Appendices A and B, as t

revised through Amendment No. 2ue, are hereby incorporated in the license. PECO shall operate the facility in accordance with the Technical, Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMISSION r

J h T. Stolz, Director ct Directorate I-ision of Reactor Projects - I/II l

Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

May 30, 1995 i

.e ATTACHMENT TO LICENSE AMENDMENT NO. 202 EACILITY OPERATING LICENSE NO. OPR-44 DOCKET NO. 50-277 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.

Remove '

Insert 233a 233a p.-

i

=

e V'

Unit 2 PBAPS j

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS b.

The results of laboratory d.

A dry gas purge shall carbon sample analysis be provided to the filters I

shall show 90% radioactive to insure that the methyl iodide removal at relative humidity in the a velocity within 20%

filter systems does not of system design, 0.05 exceed 70% during idl6 to 0.15 mg/m3 inlet periods.

methyl iodide concentra-tion, 2 45% relative i

humidity and 2 125 degrees F, or that filter train shall not be considered operable.

c.

Fans shall be shown to operate at approximately 3.

Once every 18 months automatic 3,000 CFM 300 CFM initiation of control room (design flow for the emergency ventilation, from filter train).

all designed initiation signals shall be demonstrated.

5.

The main control room ventilation radiation 4.

Operability of the main monitors, which monitor main control room ventilation control room ventilation radiation monitors and flow radiation levels, shall switches shall be functionally be operable at all times tested every 3 months.

when secondary containment is required.

5.

The main control room radiation monitors shall be a.

One radiation monitoring calibrated electronically and channel may be inoperable for with a known radioactive 7 days, as long as the source positioned in a remaining radiation monitoring reproducible geometry with channel maintains the respect to the sensor every 18 capability of initiating months.

emergency ventilation on any designed trip functions.

6.

The main control room ventilation supply flow b.

A trip system is operable when switches shall be calibrated 1 of 2 channels is available to every 18 months.

provide its trip function and the inoperable, channel is placed in its tripped condition.

If a channel is inoperable or placed in its tripped condition in both trip systems, then emergency ventilation must be initiated and maintained.

-233a-Amendment No. 413,484, 202 w

-,,-o,k y-UNITED STATES j

NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 206aMmot

.....,o PECO ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3

}

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 205 License No. DPR-56 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by PECO Energy Company, et al. (the licensee) dated February 10, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (11) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health or safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operai.ing License No. DPR-56 is hereby amended to read as follows:

i !

. (2) Technical Specifications The Technical Specifications contained in Appec41ces A and B, as revised through Amendment No. 205, are hereby inerporated in the license. PECO shall operate the facility in accordance with the Technical Specifications.

3.

Tliis license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMISSION hni.Stolz, Director r ect Directorate IJ D vision of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

May 30, 1995 k

l ATTACHMENT TO LICENSE M4ENDMENT NO. 205 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.

Remove '

Insert 233a 233a i

)

Q si l

i l

i Unit 3 PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS b.

The results of laboratory d.

A dry gas purge shall carbon sample analysis be provided to the filters shall show 90% radioactive to insure that the methyl iodide removal at relative humidity in the a velocity within 20%

filter systems does not of system design, 0.05 exceed 70% during idle to 0.15 mg/m3 inlet periods.

methyl iodide concentra-tion, 2 95% relative humidity and 2 125 degrees F, or that filter train shall not be considered operable.

c.

Fans shall be shown to operate at approximately 3.

Once every 18 months automatic 3,000 CFM t 300 CFM initiation of control room (design flow for the emergency ventilation, from filter train).

all designed initiation signals shall be demonstrated.

5.

The main control room ventilation radiation 4.

Operability of the main monitors, which monitor main control room ventilation control room ventilation radiation monitors and flow radiation levels, shall switches shall be functioncily be operable at all times tested every 3 months, when secondary containment is required.

5.

The main control room radiation monitort shall be a.

One radiation monitoring calibrated electronically and channel may be inoperable for with a known radioactive 7 days, as long as the soufce positioned in a remaining radiation monitoring reproducible geometry with channel maintains the respoct to the sensor every 18 capability of initiatir.g months.

emergency ventilation an any designed trip functious.

6.

The main control room ventilation supply flow b.

A trip system is operable when switches shall be calibrated 1 of 2 channels is available to every 18 months.

provide its trip function and the inoperable channel is placed in its tripped condition.

If a channel is inoperable or placed in its tripped condition in both trip systems, then emergency ventilation must be initiated and maintained.

-233a-Amendment No..it7 tB9. 205 t

w

-