Monthly Operating Rept for Apr 1984
ML20084R162
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/30/1984
From: Blatt M, Otoole J
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: Mcdonald W
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8405220198
Download: ML20084R162 (5)


Text

_ _. _ _ _ _.

~

O 4

OPERATING DATA REPORT DOCKET NO.

50-247 DATE 5/3/84 COMPLETED IlY M. Blatt~

TELEP110NE (9141526-5127 OPERATING STATUS Indian Point Unit No. 2 Notes

1. Unit Name:
2. Reporting Period:

Ipril, 1984

3. Licensed Thermal Power (MWr):

2758

4. Nameplate Rating (Gross SDVe):

1013

5. Design Electrical Rating (Net MWe):

873

6. f.laximum Dependable Capacity (Gross MWe): 885 849
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Ttms 6 & 7 reflect suTtner ratinas.

(Effective 4/29/84)

9. Power Level To Which Restricted.If Any (Net MWe):

None

10. R'easons For Restrictions. If Any:

None This Month Yr.-to-Date Cumulative

!!. Hours In Reporting Period 714 2903 86208

12. Number Of Hours Reactor Was Critical 719 2460.46 58407.68
13. Reactor Reserve Shutdown Hours 0

0 2119.73

14. Hours Generator On-Line 719 2436.50 56632.60
15. Unit Reserve Shutdown Hours a

n n

16. Gross Thermal Energy Generated (MWH) 1961795 6599713 147632332
17. Gross Electrical Energy Generated (MWH) 623410 2085090 45742666
18. Net Electric I Energy Generated (MWH) 600941 2001328 43628420
19. Unit Service Factor

.100.0 83.9 65.7

20. Unit Availability Factor 100.0 gtg g c; _7 96.8 79.8 58.9

,21. Unit Capacity Facter(Using MDC Nern

22. Unit Capacity Factor (Using DER Net) 95.7 79.0 58.0
23. Unit Forced Outage Rate 0

16.1 9.5

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

10 year In-Service Inspection / refueling outage scheduled to begin June 2,1984 f

25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test Status (Prior o Commercial Operation):

Forecast Achieved I

~

INITIAL CRITICALITY E

E

~

~

INITIAL ELECTRICITY COMMERCIAL OPERATION 8405220198 840430 PDR ADOCK 05000247 i

R N

[

4,j773 n

m

~_ _.

AYERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-247 UNIT IP Unit No. 2 DATE -- 5/3/84 COMPLETED BY M. Blatt

' ' --TELEPHONE (914) 526-5127 Acril 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net)

I 847 836 g7

'2 749 gg 775 3

839 831 g,

4 839 20 839 5

843 21 839 6

844 22 845 7

A41 23 841 8

949 24 9

Rd1 25 839 10 na?

26 841

't !

27 840 a'"

12 Ra5 23 839 13 843 29 838 14 oA' 30 837 15 R44

~

3 16 848 INSTRUCTIONS On this format. fist the average daily unit power levelin MWe-Net for each day in the reporting month. Com the nearest whole megawatt.

(9/77) g f.

e o

a 4

50-217 UNITSHUTDOWNS AND POWER REDUCTIONS '

DOCKET NO.

UNIT NAME IP Unit No. 2

~

DATE 5/3/84 i

REPORT MONTil Anril M MPLEE D W M WR i

TELEPHONE (414) <?6-9197 a

w.

,$E

'I; Y

Licensee E*

Cause & Correenve Se.'

Date

(

3 ij

(

.3 g &

Event uT Action in H

g$ 5 5

jigg Repora #

N0 fO Presen Recurrence d

WA 840402 F

O A

NA IF INSTRU NIS PCHER RANGE FAILED I

. WA 840418 F

O A

NA NC IfrEX01 REDUCED IDAD bOE TO VACULM II)SS

[

D s

9 h

7 I

I

=. ~

I I

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Insieuctions

. 5: Scheduled A Equepment Failure (Explain) 1-Manual for Preparation of Data i

B-Maintenance of Test 2-Manual Scram-Entry Sheets for Licensee

{

C-Refueling 3 Automatic Scram.

Event Report iLER) File tNUREG-3 D-Regulatory Restriction 40ther (Explain) 01611 E. Operator Training & Ucens: Examination F-Administrative G-Operational Error (Explain) -.

5 Estubit I - Same Source t'a/77)

II.Oihe,l Explain t 4

.. ~ _.. - - _

e 4

1

SUMMARY

OF OPEPATING EXPERIENCE April 1984 With the exception of a few brief power reductions, Unit No. 2 operated at maximum licensed reactor power throughout the month.

On April 22, No. 26 main circulating water pump was removed from service r-due to a

suspected failure of the pump's lower guide bearing.

Preparations for replacing the pump with one of the new two-speed pumps w re initiated.

At the end of the month, all but two of the new Pegion 9 fuel assemblies had arrived at the site and had been placed in the new fuel storage racks in the fuel storage building.

b 1

9 I

.I -

J

e.

  • ~

John D. O' Tool)

' 'e V!ce Pres.oent Consoldated Edison Company of New York, Inc 4 Irving Place, New York, NY 10003 Telephone (212) 460-2533 May.15, 1984 Re Indian Point Unit No. 2 Docket No. 50-247 Mr. William G. Mcdonald, Director Office of Management Information and Program Control c/o Distribution Services Branch, DDC, ADM Washington, D. C.

20555

Dear Mr. Mcdonald:

Enclosed you will find two copies of the Monthly Operating Report for Indian Point Unit No. 2 for the month of April 1984.

Very truly yours l gt, YY Encl.

cc:

Mr. Richard DeYoung, Director (40 copies)

Office of Inspection and Enforcement c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Thomas E. Murley, Regional Administrator Region I U. S. Nuclear Pegulatory Commission 631 Park Avenue King of Prussia, Pa.

19406 Mr. Thomas Foley, Senior Pesident Inspector U. S. Nuclear Regulatory Commission P. O. Box 38 Buchanan, New York 10511 26M r

n E

.