Forwards Closed Qar RA-00135,providing Complete Response to NIR-020 Re Deficiencies in Distribution Change Request Forms
ML20084Q026
Person / Time
Site: Midland
Issue date: 05/09/1984
From: Reichel N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
STONE & WEBSTER, INC.
References
CSC-7731, NUDOCS 8405210070
Download: ML20084Q026 (3)


Text

c..

  • a.

l1 CONSUMERS POWER COMPANY k

MIDLAND ENERGY CENTER Transmittal No:

CSC-7731 Date: May 9, 1984 To:

Stone & Webster P O Box 1963 Midland, MI -48640 m aggcipAL STA L j.LW a/RAu.a._m Attached 13:

Partial Response To QT#

[L w-1 T

5S-

}] /

X Complete Response To

?AO igg

~4L YII* &

For Your Information l

Other Description NIR-020:

Attached closed QAR RA-00135 provides a complete response to this item.

Signatures

-..,_..n~--

- l-

+-

i.;JGKeppler,,..NRC Rep.on III;~p /a;;

cc:

JJHarrison,-NRC' Region III w/a

.RJCook, NRC Site w/a RAWells, MPQAD -w/a 3

f #gf BHPeck, MEC w/a NIReichel, LEC w/a f

,I I DDJohnson, MEC w/a

/

MAY 141984'

/

. 8405210070 840509

/

PDR ADOCK 05000329

/

O-PDR

/

j-

6. CAR Nurnber

~

MIDLAND PROJECT RA-00135 gg r

QUALITY ASSURANCE DEPARTMENT 7 Dat) 8 sued

8. R: risen M

QUALITY,. ACTION REQUEST s.

O @ggMy A g i

Page I of }

]

1. riequirernent

- 1

% 5 V N W W 4 N bis

10. ASME Related FPZ l.000 Rev. 1 I Ives IIlNo
2. Defictney Stone & Webster NIR-020 identifies the following deficiencies:

Bechtel Procedure No. FPZ-1.000, Paragraph 7.1, requires distribution change request forms to be properly signed.

It was identified that the file for completed distribution change request forms for area No. 66 was sampled and 4 out of 25 forms sampled were missing signatures.

11. Potential 50.55te)

Yes bNo

3. CAR Originated by W
4. Discipline / Division /Section
5. Response Due Date
12. Date Reported to MPQA Mgr C. L. Soinks PAD 3/15/84 N/A
13. Acti:n item No.
15. Item Prsority
17. S/U Code
19. Action Organization
20. QAR Reviewed by SO 498l 06 PGM00 Bechtel Field F. Point M.
34. Discain.

is. Trond Coas is. Ran Coo.

Document Control

21. D.t.

N/A G-5 BCPC0 STF-D 3/8/84 Cause Proposed Corrective Action W CAL ECE6K_

D PRDCIEb IDEDT1 reb on En Do

+

ugE ECEC.TED ATTl/E T7mf IHE EURLURT1 TH E FDDL. "

U P' UTED Tb LECT RCCU ERIE DISTYISUDDn Fb O2G nTPACT5 pot.Uf7iGDT RDDl17b/VRnD DELE T5 TNG FDDLJEE IMDG Dn & D LY Bh$lb

24. Resgsible Organization / Person
25. Prope(sed Completion Date /

( W l /7DK.

Dt3TE.lSUDon/ D. BBC.S U

/

3 23-7

&,, a

26. Disconstion Cone -
  • /

l QAR Reviewer Date

.PGAE (ASME Only)

Date

27. D.soosition Acton Taken 1

l

  • Lead Field Engineer has reviewed and signed previously submitted forms that lacked l

the signature..

  • S & ontract distribution personnel have reviewed FPZ-1.000, Rev. 1 L

!

  • 3. Metnod of D scosition Verification
29. QAR Closed b l

32 tr ution change requests were sampled and fouad Subcontract distribution personnel have signed a memo yQAD Date indicating understanding of procedure FPZ-1.000,'Rev.1 2 Acc atebie

O un.cce-bi.

OSu,cedingQAa

oc5'^5"5 o"'v>

o '-

M-4/1 A (Rev 1) r v

Mrotm o PRoarcT 7 0Tm

~

O' 7 t.iTY ACTION REOUES '

cAE:

REY:

rM:.7,4 Assumct cE7ARTMENT-3-29-84 0

CONTINUATION SHEET Pact 2 or 2

~C0flTIf;UED BLOCK 23:

and veri the same day.

Any errors should be disc ed curing this ver ~~ cation process.

Because of these disc ancies, FDD cedures were reviewed oy tne unoersignec ano ner rvisor.

I have reviewed the cedures'for anging the FDDL and in.g i ci..en Lu i vu.

03 unde 12 Land u

m,[

lf(

C0f4T. BLOCK 22:

Subcontracts document distribution Group received verbal-Instructions from lead Field Ergineer to reduce distribution to one copy of all documents being 01strioutea to B&k.

Ine unoersigned torms were submitted inadvertently as part or the di.stribution reduction effort.

C0ffT. BLOCK 23:

Remedial action: have lead Field Engineer review all previously sub-mii.1.eo rorms eno sign wnere requireo.

nave att suoconuact otstrioution personnel review FPZ-1.000 proposed corrective action: Subcontract Department procedure FPZ-1.000 is the controlling document 'ot Drevent reoccurance.

fin further act'on is required.

C0f4T. BLOCK 24: R. E. Cleary 3-27-84 CollT. BLOCK 25:

3-27 l

,f Yht

' l h'

/ 0

  • h r.

t~w W LhhfW'

- lt V

~

/

M-4/1B (Rev 0)