ML20084P406

From kanterella
Jump to navigation Jump to search
NPDES Noncompliance Notification:On 840409,high Iron Concentration in Plant Heating Boiler Blowdown Discovered. Probably Caused by Infrequent Boiler Use
ML20084P406
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/09/1984
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8405180199
Download: ML20084P406 (2)


Text

a I 1

a%

y" INDIANA & MICHIGAN ELECTRIC COMPAN)'

DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 May 9, 1984 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58/74 Docket Nos. 50-315/50-316

Dear Mr. Keppler:

Pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of a high iron concentration in the Plant Heating Boiler Blowdown on April 9, 1984, is attached. Thin report is required by Amendment No. 54 to Facility Operating License No.

DPR-58 and Amendment No. 40 to Facility Operating License No.

DPR-74 dated May 6, 1982.

Sincerely,

{h #2 */

W .G. Smith, Jr.

IDS Plant Manager

/bab Attachmer.t cc: John E. Dolan INPO M.P. Alexich Dir., IE R.F. Kroeger Dir., MIPC H. Brugger PNSRC E.R. Swanson, RO:III R.C. Callen, MPSC G. Charnoff, Esq.

J.M. Hennigan H.R. Denton, NRC R.O. Bruggee, EPRI g 111984 E.L. Townley J.F. Stietzel 8405180199 840509 PDR ADOCK 05000315 S PDR )Y-

4 g,.

. g, [  :-&i;60 Gl~T,u INDIANA & MICHIGAN ELECTRIC COMPANY r;, ,. .- .

ON SUM MIT SQU AR E. P. O. BOX $0. FORT WAYNE IN. 46801 Telepnonet (219) 425 2111

. i * ;;id (' m.

..lCIIARD C. MtXGE April 27,1984 - ' ' ' -

Vice President Mr. Paul D. Zugger Executive Secretary Michigan Water Resources Commission Stevens T. Mason Building Box 30026 Lansing, Michigan 48909 Re: Donald C. Cook Nuclear Plant

. NPDES Permit No, MI 0005827 a

Boiler Blowdown ,

i

Dear Mr. Zugger:

The pli ; heating boiler, which had not been in use for approximately one month, was started up for steam requirements. A blowdown sample taken April 9,1984, was found to have an iron concentration of 2.9 ppm. The iron level is most likely the result of infrequent boiler use.

An NPDES modification which exempts the plant heating boilers from iron and copper limits was approved at a meeting of the Michigan Water Resources Commission on March 21, 1979, although the staff has never formally modified the permit to reflect this administrative action.

Very truly yours,

[

R. C. Men Vice President RCM/be cc: W. G. Smith I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete.

I am aware that there are signficant penalties for submitting false information, including the possibility of fine and imprisonment.

bc: R. W. Jurgensen

$f -

T. A. Kriesel R. C. Mend w T. A. Wojcik R. W. Reeves /C. E. Hawk J. P. White R. E. Zahler