ML20084P366

From kanterella
Jump to navigation Jump to search
Cyber Report 2020-412 Cover Letter
ML20084P366
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/23/2020
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Maza K
Duke Energy Progress
References
IR 2020412
Download: ML20084P366 (4)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION March 23, 2020 Ms. Kim Maza Site Vice President Duke Energy Progress, LLC 5413 Shearon Harris Rd.

Mail Code HNP01 New Hill, NC 27562-9300

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - CYBER SECURITY INSPECTION REPORT 05000400/2020412

Dear Ms. Maza:

On February 14, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant. On February 13, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Shearon Harris Nuclear Power Plant.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.1] - Resources.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Shearon Harris Nuclear Power Plant.

Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION K. Maza 2 The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 05000400 License No. NPF-63

Enclosure:

Inspection Report cc: Distribution via LISTSERV OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION K. Maza 3 cc:

Brian Bernard, General Manager Nuclear Protective Services Duke Energy Corporation Mail Code EC5ZD 526 South Church Street Charlotte, NC 28202 Linwood Faulk, Director Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562-9300 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML20084P366____

Entire Report: Non-Sensitive Publicly Available X SUNSI Review X Sensitive X Non-Publicly Available OFFICE RII/DRS RII/DRS RII/DRS NAME J. Montgomery E. Coffman S. Shaeffer DATE 3/ 19 /2020 3/ 23 /2020 3/ 23 /2020