ML20084P254

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1984
ML20084P254
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/30/1984
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8405180069
Download: ML20084P254 (17)


Text

._.

OPERATING DATA REPORT DOCKET NO. 50-269 DATE 05-1.5-64 COSIPLETED BY J.A. Reavis TELEPliONE 704-373-7567 OPERATING STATUS

1. Unit Name: Oconee 1 . Notes
2. Reporting Period: April 1, 1984-April 30, 1984 Year-to-date and cumulative 2568 capacity factors are calcu-
3. Licensed Thermal Power (31Wt): lated using a weighted
4. Nameplate Rating (Gross SIWE): 934 886 amap h mm
5. Design Electrical Rating (Net SIWE): dependable capacity.
6. Ataximum Dependable Capacity (Gross alWe): 899
7. Sf aximum Dependable Capacity (Net 31We): 860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To which Restricted,if Any (Net 31We): M-
10. Reasons For Restrictions.If Any:
This 31onth Yr.-to.Date Cumulative
11. Hours In Reporting Period 719.0 2 903.0 94 608.0
12. Number Of Hours Reactor Was Critical 719.0 2 884.2 67 424.7

~ ~ -

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 719.0 2 880.1 64 269.5

~ ~

15. Unit Reserve Shutdown Hours -
16. Gross Thermal Energy Generated (>iWil) 1 853 815 7 380 223 153 678 255
17. Gross Electrical Energy Generated (AlWH) 650 600 2 590 670 53 458 900
18. Net Electrical Energy Generated (51WH) 623 280 2 480 256 50 645 807
19. Unit Service Factor 100.0 99.2 67.9
20. Unit Availability Factor 100.0 99.2 68.0
21. Unit Capacity Factor (Using alDC Net) 100.8 99.4 62.1
22. Unit Capacity Factor (Using DER Net) __.

97.8 96.4 60.4

23. Unit Forced Outage Rate 0.0 0.8 16.9
24. Shutdowns Scheduled Over Next 6 31onths (Type. Date.and Duration of Eacht:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COllilERCIAL OPERATION 8405180069 840430 PDR ADOCK 05000269 (op;)

R PDR

~_ _ _-- r _-~.7 g,- . ^\

AVERAGE DAILY UNIT POWER LEVEL ' 'f g DOCKET NO. 50-269 -

UNIT Oconee 1 l DATE 05-15-84  :

s  !.

COMPLETED BY J. A. Reavis ,

TkLEPHONE 704-373-7567

' MONTH.; JApril, l'984

-DAY . AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t) (MWe-Ne t)

't 869 17 868 s

2 869 18 866 -

3 870 19 867  :

4- 869 20 867 5 :870 21 866  !

6 862 22 866 [

7 843- 23 857 >

8' 868' .24 867 9 870 25 867  ;

~

101 869- 26 866

~ 11 870 27 867.

~

2 12 870 28 867 i

13 869 29 831  ;

14. 869 30 866- ,

15 869 31 16 868 i

-INSTRUCTIONS-

.On this. format, list the average daily-unit power level in MWe-Net for each day in the reporting month.~ Compute to the nearest whole megawatt.

' P ,'

7 - G c E i 3 R v 7 lt 1 4 a - N R e 1 I 9 E / R 7 e 6 E 5 2 s e le e ntanF si 2 N 1 - e 0

- O C 5

/ A 4 0

oa e) ise D s. c s

u 5 O 0 J 7 s R o e e n or l.

fIi S v c '

e i

t n T er s nf( o1 _

c e P m _

OMTiN EEYE N AA l e nt r

na in r

e I

noi

- r tae s

t o t r

S a

DO ne e v Gahe ep -

T ND l Cot I Ei l E a s pSR KT T EE P &tct i i V

ic h

iPsiyn1 1

i b

t CN I

L L seAn e h e6 i

h n v p x r inv1 x O P E D U a e o Efloii E _

MT l 0 C P r t O S C 4 5 d

n a

l o _

r _

t n .

o C

S N n O X i

. I T 4 E i . a )n i

8 %3. O V nci a C 9 .

L aSl

_. U 1 95v A r

cixc p

D E .

V

ll St aE i(

R L a a n r I duni nnt n

oe h .

R R g?U l aaut .

E P C iMMAO _

W A E,3d< C e - - - -

O M121 4 P .

_ D i 1 N lT A N S O e

  • N M et n n n s t W T e ev i p _

O R icEe n D O L R o T P i t _

U E a l R .

i n _

i S m a

'T I

5gO x .

N ":. i f

E g f, - )

n e U  ;

- s t

g5. ia n e

ina lp c _

x i lp E i nL o i x .

(t l 3js B e r e s

ic&g t

I e

luT f f

isi n o r) *_

iao enei ia n F

t c e Rivll ai-r t l a ap a .

3g5 nn yT r

- ea gr or s nx t

~5. 3f - nnnt oi ioi i

i l

pt i elelaisrat nt _

ninu uinie w qa e eeh pd p t uif gee

,gH aliMRROAOO e - t - - - -

- S RAICDEFGIl 2

7 _

0 te 4 a 0 .

D - d 4 le -

. 8 du _

ed ce nh i c FS ) _

p .

o. .: 7 _

N 7

- FS' /

7 .

I 91 t <!, : 1ji;i ' ' j;L'

DOCKET NO: 50-269

' UNIT
OCONEE 1 DATE: 05/15/84

. NARRATIVE

SUMMARY

-Month: APRIL 1984

- enc ~ept for control valve and stop valve PT's on April 7,1984, the unit' ran

- the entire month at 100% with no major problems.

.4 a

J 3

I e

- . , - rg i

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 1 ,
2. Scheduled next refueling shutdown: October 1984 ,
3. Scheduled restart following refueling: December 1984 ,
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Revision i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .

6 .' Important licensing considerations (new or different design or supplier, ,

unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

i t e i

l l

177

7. Number of fuel assemblies (a) in the core: ,

(b) in the spent fuel pool: 1119* .

1312*

8.

Present. licensed fuel pool capacity:

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present
licensed capacity
August 1991 .

Date: May 15, 1984 ,

DUKE POWER COMPANY

-Name of

Contact:

J. A. Reavis Phone: 704-373-7567

  • Represents the combined total for Units 1 & 2.

.. ~. - . . .. _. _ .. _ . . .

OPERATING DATA REPORT DOCKET NO. 50-270 DATE 05-15-84 C051PLETED BY J.A. Reavis TELEPIIONE 704-373-7567 OPERATING STATUS oconee 2 hue 5

1. Unit Name:
2. Reporting Period: Anril 1. 1984-Anril 30. 1984 Year-to-date and cu:nulative
3. Licensed Thennal Power (51Wt): 2569 capacity factors are calcu-
4. Nameplate Rating (Gross 51We): 934 lated using a weighted
5. Design Electrical Rating (Net 31We): 886 average for maximum
6. Staximum Dependable Capacity (Gross alWe). 899 dependable capacity.

860

7. Slaximum Dependable Capacity (Net SlWe):

S. if Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net SIWE): None
10. Reasons For Restrictions,if Any:

This 31onth Yr.-to.Date Cumulative

11. Hours In Reporting Pen.o d 719.0 2 903.0 84 528.0
12. Number Of Hours Reactor Was Critical 71 9.0 2 903.0 60 216.5

- ~ ~

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 719.0 2 903.0 59 063.2
15. Unit Reserse Shutdown Hours
16. Gross Thermal Energy Generated (31WH) 1 847 158 7 461 301 139 951 968
17. Gross Electrical Energy Generated (51WH) 636 260 2 574 990 47 FL. 846
18. Net Electrical Energy Generated (51WH) _ 610 793 2 471 275 45 2.% 844
19. Unit Service Factor 100.0 100.0 69.9
20. Unit Availability Factor 100.0 100.0 69.9
21. Unit Capacity Factor (Using 31DC Net) 98.8 99.0 62.1
22. Unit Capacity FactorIUsing DER Net) 95.9 96.1 60.5
23. Unit Forced Outage Rate 00 0.0 15.8
24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date,and Duration of Eacht:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY CO\lNIERCIAL OPER ATION (0/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-270 UNIT Oconee 2-DATE o s-15 -84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567

~

o MONTH' April, 1984 -

DAYl -AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 1 851 17 849 2 851 18 851 3 851 19 852 4 851 20 851

-5 851- 21 852

.6 850- 22 851

7. :850 23 850

.8 850 24 849 9 '851 25 849 to- 852 26 849.

b 11 852 849 27 12 852 28 849 ji3 820 29 813 14 852- 848 30

.15 ' 852 31 5[ -16 7

8511 i

' INSTRUCTIONS

~

0n this format, list the average ' daily unit power- level in MWe-Net for each day .

In:the' reporting month. Compute to the nearest whole megawatt.

s 1a+

DOCKET NO. 50-270 UNIT SilUTDOWNS AND POWEll ItEDUCTIONS UNIT NAME OCONEE 2 I

DATE 05/15/84 COMPLETED ilY il. A. Roavic ItEPoltT MONTil April 1984 TELEPil0NE 704 171 7867 i .

No. D.it e

-, .$g 5g 3

R

)Y j~5 Licensee Even

,E-ro 3,7 "L

s?

Cause & Ciorcesive Action to i

i i

H j= $ 3 gg g itepini e en V o

5O Prevent iteentrence g

O 5-p 84-04-13 S -- B -- CC VALVEX Control and Stop Valve PT's  ;

I 2 1 4 F: Forced Iteamn: Methoti: Exhibit G Instructions S Scheilutet! A-Etluipment Failure (Explain) 1-Manual for Preparation of D.na II Maintenance of Test 2 Manual Scram. lintry Sheets for I.i.:ensee C.Itefueling 1 Automatic Sciam. Event IteporI (L' cit) File INtillEG.

D.Itegulatory llest tictiini 4-Ot her (lixplain) 01bl1 1: Ope 5ator Training & License lixamination F-Administrative 5 G Opciational lieror (lixplain) Exhibit I - Sa.ne Sotnee C1/77) Il Other (lixplain)

DOCKET NO: 50-270 UNIT: OCONEE 2 DATE:~05/15/84 NARRATIVE

SUMMARY

Month: Aoril 1984 l

l l

Except for control valve and stop valve PT's on April 13, 1984, the unit ran l the entire month at 100% with no major problems.

mummumismi

l. .

MONTHLY REFUELING INFORMATION REQUEST Oconee Unit 2

1. Facility name: ,
2. Scheduled next- refueling shutdown: February 1985 .
3. Scheduled restart following refueling: April 1985 .
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Ruview Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

177

7. Number of fuel assemblies (a) in the core: ,

(b) in the spent fuel pool: 1119* .

Present licensed fuel pool capacity: 1312* ,

8.-

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: _ August 1991 DUKE POWER COMPANY Date: May 15, 1984 .

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

  • Represents the combined total for Units 1 and 2.

OPERATING DATA REPORT DOCKET NO. 50-287 DATE 05-15-84 CO.\lPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name: ocome 3 Notes
2. Reporting Period: Anril 1.1984 - April 30,1984 Year-to-date and cumulative
3. Licensed Thermal Power (31Wt): 2568 capacity factors are ccleu-
4. Nameplate Rating (Gross 31We): 934 lated using a weighted

- 5. . Design Electrical Rating (Net alWe): 886 average for maxunum

6. .\taximum Dependable Capacity (Gross .ilWe): 899 dependable capacity.
7. Staximum Dependable Capacity (Net SIWE): 860
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted.lf Any (Net 31We):
10. Reasons For Restrictions. If Any:

This 3tonth Yr. to.Date Cumulative

' i1. Hours in Reporting Period 719.0 2 903.0 82 175.0

- 12. Number Of Hours Reactor Was Critical 0.0 1 619.6 58 329.4

- ~ ~

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0.0 1 615.5 57 198.1

' 15. Unit Reserve Shutdown Hours - - -

16. Gross Thermal Energy Generated (SiWH) 0 4 048 036 139 540 600

.17. Gross Electrical Energy Generated (>lWH) 0 1 397 550 48 212 144

18. Net Electrical Energy Generated (31WH) -1 252 1'335 943 45 903 061
19. Unit Service Factor 0.0 55.7 69.6

- 20. Unit Availability Factor 0.0 55.7 69.6

21. Unit Capacity Factor (Using .\tDC Net) 0.0 53.5 64.8
22. Unit Capacity Factor (Using DER Net) 0.0 51.9 63.1
23. Unit Forced Outage Rate' O.0 0.2 14.8
24. Shutdowns Scheduled Oser Next 6.\lonths(Type, Date,and Duration of Each):

Currently Refueling

25. If Shut Down At End Of Report Period. Estimated Date of Startup: Y '

f6." Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY CO\l\tERCIA L OPER ATION I

(9/77)

~L

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-287 UNIT Oconee 3 DATE 05-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH April, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 1 -

17 2 -

18 -

3 19 4 -

20 -

i

! 5 -

21 -

l I 6 -

22 -

7 23 8 -

24 -

9 25 10 -

26 -

11 -

27 12 28 -

13 29 14 -

30 15 31 16 INSTRUCTIONS On this forrrat, IIst the average daily unit power icvel in MWe-Net for each day in tbc reporting month. Compute to the nearest wh. ole megawatt.

1

DOCK ET NO.- 'in 7R7 UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME ntnNFF 3 DATE nt/in/na COMPLETED llY f Al lleavis REPORT MONTil Anril 1984 TELEPilONE 704 373-7567

. 3 -

-, .! E $ Licensee ,E ro l Cause & Currective N". Dde i ~@ p 2s& Event y? $1 Action su u5L

  • g3 5 g 3 gg 5 Repini e cd v Prevent Recurrence I e g 84-04-01 C 1 RC FOC v End of Cycle 7 Refueling Outage 2 S 719.00 1

1 1

1 I 2 1 4 17 : I% eed Reawn: Method: Exhibit G Insiructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Prcearation or Data Il-Maintenance or Test 2-Manual Scram. linary Sheeis for I.icensee C Refueling - 1-Autoinatie Scram. Event Report (LER) File int! REG.

D Itegulatory Resifiction 4 Other (lixplain) 0161) li Opeiutor Training & Lie. nse Examination I; Administrative 5 G-Opciational lie ror (lixplain) Exhibit I Same Source 19/77) Il-Other (Explain)

r-- -

.1 DOCKET NO: 50-287 UNIT: OCONEE 3 DATE: 05/15/84 NARRATIVE

SUMMARY

'. Month: -Aoril 1984 The unit was in its end of cycle _7' refueling outage for the entire month of April and is expected to return to service late in May.

L o

I, a

I \

4-u

MONTHLY REFUELING INFORMATION REQUEST Oconee Unit 3

1. Facility name: ,
2. Scheduled next refueling shutdown: Currently Refueling ,

May 27, 1984

3. Scheduled restart following refueling: ,
4. Will refueling or resumption of operation thereaf ter require a technical Yes specification change or other license amendment? ,

If.yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier,

.unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

Number of fuel assemblies (a) in the core: 177

7. .

(b) in the spent fuel pool: 72 .

8. Present licensed fuel pool capacity: 825 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 .

Date: May 15, 1984 ,

DUKE POWER COMPANY-Name of

Contact:

J. A.' Reavis Phone: 704-373-7567

e v

.<  :: .; -i. ,

,7 4;r

_A .N F: _

OCONEE NUCLEAR STATION

~

~ Monthly Operat'ng i Status Report-

~

1. 1 Personnel Exposure For th'e month of March, 12-individual (s) exceeded 10 percent of a- -their allowable annual radiation dose limit with the highest dose
being 2.070 rem, which represents approximately 17.2% of that person's allowable annual limit.

4

2. :The' total station liquid release.far March'has been compared with

.the Technical Specifications annual value of 15 curies; the total release:for. March was'less than 10 percent of this limit.

~

--: .The total station gaseous release for March has been compared with V' the. derived Technical, Specifications annaal value of 15,000 curies;

<the total release for March was less than 10 percent of this limit.

f.

i i

r" M

Y

, , . . --, . ., g , , . . .. ,

p-- , -

, }

DUKE POWER COMPANY GENERAL OFFICES " " ' "" !!

3y3 4a 422 SOUTH CHURCH STREET CIIARLOTTE, N. C. 28242 May 15, 1984 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington,-D. C. 20555 Attention: Document Control Desk RE: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of April 1984.

Very truly yours, f b f4Lc Hal B. Tucker

/gf JAR:scs Attachments cc: Regional Administrator -Ms. Helen Nicolaras, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101.Marietta Street, NW, Suite 2900 Washington, D. C. 20555 Atlanta, Georgia 30303 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 circle 75 Parkway

' Washington, D. C. 20555 Atlanta, Georgia 30339 Senior Resident Inspector Oconee Nuclear Station 4

W

$#4 , ,

.. - _ ,. . _ _ . - . . . .