ML20084P174

From kanterella
Jump to navigation Jump to search
Forwards Table Inadvertantly Omitted from 950518 Application for Amend to TSs & Exemption to 10CFR50,App J
ML20084P174
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/31/1995
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9506080234
Download: ML20084P174 (3)


Text

,.. ,

l DdeIbwerCanpany ' M S hoowv ,

P.0 Box 1006 Senior Vicehesident !

Charkee,hC2820H006 NudearGenention 1 (TM)382-22000 Mice (IM)3824360 Fax .

DUFWPOWER l

May 31,1995 U. S. Nucle'ar Regulatory Commission Washington, D. C. 20555 i 1

Attention: Document Control Desk '

~

Subject:

Catawba Nuclear Station Docket Numbers 50-413 and -414 Technical Specification Change and Exemption to 10 CFR 50 Appendix J l

Hy letter dated May 18,1995, ar. application for a Technical Specification change and  ;

exemption to 10 CFR 50 Appendix J, to defer a scheduled containment integrated leak j rate test at Catawba Nuclear Station, Unit 2, was submitted. The letter referred to a table ~

which was inadvertantly omitted. This table is attached. We apologize for any '

inconvenience this omission may have caused.

I If there are any questions, or additional information is required, please call Scott Gewehr at (704) 382-7581.

Very truly yours,  !

, S' M. S. Tuckman .

I I

i

)

l 9506080234 950531 PDR 4 DOCK 05000413 P PDR 6

t ' 1

- . ~ . i g  ;

k

t U. S. Nuclear Regulatory Commission h May 31.1995  !

Pag'e 2 xc: R. E. Martin, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission  !

Mail Stop 14H25, OWFN ,

Washington, D. C. 20555 Mr. S. D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission 101 Marietta Street, NW - Suite 2900 ,

Atlanta, Georgia 30323 R. J. Freudenberger Senior Resident inspector Catawba Nuclear Station i

  • l i

i Catawba Nuclear Station Unit 2 .

ILRT Test Results .

Test Type Test Date Test Method Test Duration Test Results (%/ day) i hours As Found As-Left ,

Pre-operational 7/8/85 Mass Point 27.5 N/A 0.1256 i

ist Periodic 3/17/89 Mass Point 24 0.0243 0.0243 ,

2nd Periodic 2n/93 Total Time 8 0.1461 0.1461 '

Mass Point 0.0906 0.0906 Acceptance Criteria (0.75 La): < 0.225 %/ day Allowable Leakage (1.0 La): < 0.300 %/ day Notes:

(1) All test results reported at the 95 % Upper Confidence Limit and include the leakage penalty total for all Type 11 or C penetrations not challenged during performance of the ILRT.

l- (2) Both the ist and 2nd periodic tests were performed at the front of the outage prior to any repairs l or adjustments; therefore, the As-Found test result is equal to the As-Left test result.

(3) For the 2nd periodic test, both the Total Time and Mass Point results were reported in the final test report. 'Ihe Total Time leakage calculated in accordance with the BN-TOP-1 methodology is always greater than the mass point result since its UCL is calculated at the 97.5 % confidence interval.

c f.

k l

I

-.,-r, e