Interim Deficiency Rept DER 83-77 Re Concrete Pour Containing Honey Combed Concrete Around Vertical Tendon Sheath Block Outs.Initially Reported on 831109.Final Rept Delayed Until 840622,due to Extensive Evaluation
ML20084N758
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/08/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29456-TDS, DER-83-77, NUDOCS 8405170196
Download: ML20084N758 (2)


Text

E w

?C1wa;

~

Arizona Public Service Company i.G s p, r.

,o n c.

May 8,1984 ANPP-29456-TDS/TRB.

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension.For-Report - DER 83-77 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 2 Concrete Pour Contains Honey Combed Concrete Around The Vertical Tendon Sheath Block-Outs.

File: 84-019-0 26; D.4.33.2

_ A) Telephone conversation between P. Narbut and K. Parrish on

(

Reference:

November 9, 1983.

(B) ANPP-28359, dated December 6, 1983 (Interim Report)

(C) ANPP-28773, dated February 1,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was-transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by May 18, 1984.

Due to the extensive investigation and evaluatioe required, it is now expected that this information will be finalized by June 22, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

{

f ch

/t ttl E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc: See Page Two

'9405170196 840500 PDR ADOCK 05000529 h

8 PDR

/E ~Z. 7 \\\\

b o

s

'9

.Mr. T. W. Bishop-DER 83-77' Page Two-cc:

Richard.DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.' G. Wo od s, J r.

.D. B. Karner

.W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum JJ.

M.' Allen P. P. Klute A. C. Gehr W. J.-Stubblefield

-W. G. Bingham R. L. Patterson R. W. Welcher.

H. D. Foster D. R. Hawkinson L._E. Vorderbrueggen G. A. Fiorelli-

.S.

R. Frost-J. Se lf - ~

D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite _1500 -

Atlanta,'GA'30339 e,-

.~ '

_-