OPERATING DATA REPORT DOCKET NO. 50-9a7 DATE a-a o3 COMPLE1 ED 11Y E_ rich.

, TELEPHONE (41a1 496-5155 OPERATING STATUS

1. Unit Name: Tnainn onint U".it "c. 2
2. Reporting Period: March 1983 *
3. Licensed Thermal Power IMWt):

2758

4. Nameplate Rating (Gross MWe):

1013-

5. Design Electrical Ratin; 4 Net MWel:

873

6. Maximum Dependable Capacity (Gross MWe): on0
7. Maximum Dependable Capacity (Net MWc): AAA 871f Changes Occur in Capacity Ratings 1 Items Number 3 Through 7) Since Last Report.Gise Reasons:

No chancine _.

9. Power LeselTo which Restricted.lf Any (Net MWe): none
10. Reasons For Restrictions. If Any:

N/A Tids Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 74a n69 75795 725.07 1743.87 49901.4s
12. Number Of Iloun Reactor Was Critical 16.25 23.13 1601.64
13. Reactor Resene Shutdown Hours 712.07 1440.75 48280.05
14. Hours Generator On-Line 0 0 0
15. Unit Resene Shutdown flours 1865423 3545310 124981986
16. Gross Thermal Energy Generated (MWH) 579870_.... 1098300 1Rsn1n7s
17. Gross Electrical Energy Generated (MWil) _

IS. Net Electrical Energ) Generated (MWil) 556790 1038406 36770461 95.7 66.7 62.9

19. Unit Senice Factor 95.7 66.7 62.9
20. Unit Asailability Factor 86.6 55.6 55.8
21. Unit Capacity Factor (Using MDC Net) 5 3 . '/ 55.1 54.9
22. Unit Capacity Faetor (Using DER Net) 0.7 14.4 1n.n
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Each):

'l None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operationk Forecast Achiesed

\

INill \ L C RillC \ Lil Y N.A.

\ \

INilI \t. FLt Cl RICIIT cmnirReiu oPrR mon \' \_

i 8306020276 830404 pyn g PDR ADOCK 05000247 PDR R '

~~ . . ,

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-247 I.P. Unit No. L DATE 4-4-83

, COMPLETED BY TELEPHONE (914) 526-5155

. MONTH MARCH 1983 DAY AVERAGE DAILY POWER LEVEL

~

DAY AVERAGE DAILY POWER LEVEL (Mbe-Net) (MWe-Net) 1 841 17 754 2 759 gg 709

. 3 583 ,,

769 4 839 20 757 5 841 21 346 6

831 835 835 840

~ '

23 3 836 24 853 9

NO 23 10 834 26 53 11 ___

831 471 12 826 834 g

13 573 845 29 14 786 30 849 808 846 15 3g 16 736 da >

INSTRUCTIONS On this format.!ist the average daily unit power levelin MWe Net for each day in the reporting month. Compute tu the nearest whole nwgswatt.

(4 /77 )

S

, . .. - __ ~ - . . _ . - . , . .

3 4 P DOCKET NO. 50-247 UNIT SHUTDOWNS AND POWER REDUCTIONS I.P. Unit 57 -

UNIT N A'.lE DA TE .d=A= Q 3 COMPLETED BY P_ Meh REPORTMONT11 MARCII 1983 TELEPilONE (914)526-5155

, .]g 3 kE Licensee ,E-r,  % Cause & Cor recieve W. D.ne i 5= s .h s 5 Event p Action to 5 uo{

! l-35 5 ;5 g Report *: mU Present Recurrence O .

I N/A 3l0303 F 0 ,.H 4 None HH HT EXCH Load reduction to control high D condensate temperature.

7 830313 F 4.85 A 3 CH PUMP XX Spurious speed runback on 21 None B Main Boiler Feed pump resulting in low level trip on No. 23 S/G.

N/A 8J,0321 F 0 A 4 CH HT EXCH Load reduction due to condenser None F tube leaks 8 830326 S 27.08 A 2 CH VALVEX Unit shutdown to repair None F #24 Main Boiler Feed Water Reg.

Valve stem packing leakage.

t i 2 3 4 i

F: Forsed ' Reason: Method: Exhibit G - Inst ructions S: Sacduled A 1:quipment Failure (lixplain) 1 Manual for Pseparation nf Data Bataintenanec oi Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LE R1 Fi!c iNURI.G- ,

D Regulatory Restriction '4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative . 5 G-Operational Error (Explain) Exhibis 1 - Same Source (9/77) Il Other (Explain) ,,

SMFARY OF OPEPATING EXPERIENCE Docket No.: 50-247 Date: 4/8/83 Cmpleted by: J. Curry Telephone No.: (914) 526-5235 Indian Point Unit No. 2 began the month of Parch at 100% reactor pomr. On Parch 2, a contract diver became entrapped in the service water pump forebay while performing underwater inspection and cleaning. To rmove him required a reduction in plant load to approximately 180 PMe and a concurrent shutdown of all but one service water pucp. - He was not injured.

On March 7 a brief load reduction of approxurately 170 M1e was required to clear an obstruction frm the forebay of No. 24 circulating water puup after which the unit was returned to full power.

Unit 2 tripped autmatically on March 13 due to a low level condition in No. 23 steam generator in ccxtbination with a steam flow /feedwater ficw mismatch signal. 'Ihe trip occurred during a load reduction to cmpensate for a loss of speed control on No. 21 main boiler feedwater pump. The unit was returned to service the same day. Peactor power was raised to 42%

while the feedwater pump was repaired and full power operation was restored on March 14.

On March 16, load was reduced to approximately 670 Mie to permit removal of condensers frcrn service for inspection and cleaning. During the period frczn March 16 to Parch 23, three of the condenser sections were cleaned and several condenser tube leaks were plugged. No. 21 Circulating Water Pump was returned to service and full power was restored by_ Parch 22.

The unit was reoved frcm service on March 26 to repair a sten packing gland leak on the main feedwater regulating valve for No. 24 steam genera-tor. The unit was returned to service on March 27 and operated at 100% for the rmainder of the period. . . .

I

D'ocket No. 50-247 Date: 4/14/83 Completed by: J. Bahr March, 1983 Indian-Point Unit No. 2 Date Component MWR Malfunction Corrective Action 11/4/82 cont. Cooling 2000 Pump frozen Pump replaced.

Gas and Part Pump 10/20/82 Main Steam 4438 Leaks past Removed valve and System MS-49B seat replaced disc and Safety Valve cotter pin.

11/11/82 Feedwater 4865 Valve packing Replaced packing System Valve Leak BFD 60-3 10/29/82 CVCS Valve 1464 Valve leak Installed new valve 204B internals and repacked ,

10/29/82 Containment 5045 Valve leak Replaced worn gear Isolation sector in housing ,

System Valve .

PCV-1190 10/29/82 PCV-1190 5046 Valve leaks Replaced T rings and PCV-1191 and 5047 11/4/82 Main Steam 4902 Repacking re- Valves repacked System MS-1 quired following

- Valves (4 S/G hydrostatic valves) test 11/11/82 Valve for 4979 Packing leak Valve repacked Steam Gen- causing SG i

erator Level level instru-Transmitter mentation LT-417C error 10/20/82 No. 23 Steam 228 Valve leaks Removed valve Generator bonnet, replaced Safety Valve disc insert and MS-45C cotter pin.

11/1/82 containment 203-5495 Pailed to open Replaced failed control r,1: . i t ,

. lay i

e v er ,n -,t- ,e

Docket No. 50-247 Date: 4/14/83 Completed by: J. Bahr March, 1983 Indian Point Unit No. 2 Date Component MWR Malfunction Corrective Action 11/5/82' Pressurizer 4817 Breaker Replaced breaker Heater Breaker, overheats Circuit No. 2, Panel No. 23 10/27/82 Instrument 3100 Air leaks Air lines resweated Air Lines and 111 to Valves 791 and FCV-110A 11/4/82 Temperature 5011 Gauge broken Temperature gauge Gauge for replaced.

Dessicant Dryer Tank 11/4/82 Instrument 5190 Sight glass Rechargn? dryer Air System for freon No. 22 Re- level low, frigerant indicator Dryer shows moisture 11/5/82 Service Water 4714 Gear mal- Replaced gear box System Outlet functii. ..

valve of PCV 1179 10/19/82 HVAC System 419 Manual operators Replaced manual valve PCV1191 broken operators and PCV 1192 10/29/82 Safety In- _3086 Valve requires Valve repacked jection valve repacking and and new studs No. 850A renewed studs and nuts installed 10/23/82 Safety In- 4213 Diaphragm Diaphragm replaced jection leaks system Valve No. 1830

Docket No. 50-247 Date: 4/14/83

. Completed by: J. Bahr March, 1983 Indian Point Unit No. 2 Date Component MWR Malfunction Corrective Action 11/5/82 Post Accident 5092 Valve broken Replaced broken Sample System in closed valve bonnet Valve 1875F position 10/27/82 cvCS Valve 5134 valve packing Valve replaced No. 344 leaks 10/29/82 CVCS Valve 5436 Diaphragm leak valve bonnet No. 267B and diaphragm replaced 11/4/82 No. 23 Emer - '5141 Cooling System Nine tubes gency Diesel leak in water jacket Generator plugged Jacket Water

. Cooling System l

.s-

%e I

f e

, - ~ - - - . - - - - - -

,-s /

John D. O'Toob

. . Vice Presedent Consohdated Edison Company of New York, Inc -

4 Irving Place. New York. NY 10003 Telephone (212) 460-2533 April 15, 1983 Re: Indian Point Unit No. 2 Docket No. 50-247 Mr. William G. Mcdonald, Director

. Office of. Management Information and Program Control c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Mcdonald:

Enclosed you will find two copies of the Monthly Operating Reporting related to Indian Point Unit No. 2 for the month of March 1983.

Ve truly yours,

/

l f. % s Y Encl.

cc: Mr. Richard DeYoung, Director (40 copies)

Office of Inspection and Enforcement c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. James M. Allan, Acting Regional Administrator Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pa. 19406

-Mr. Thomas Foley, Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 38 Buchanan, New York 10511

'/

- - . - . - .