4 OPERATING DATA REPORT 050-298 DOCKET NO.
DATE 4-5-83 COMPLETED BY P.L. Ballinger TELEPHONE - 402-825-3811 OPERATING STATUS Cooper Nuclear Station Notes
- 1. Unt h March 1983
- 2. Reporting Period:
2381
- 3. Licensed Thermal Power (MWt):
836
(
- 4. Nameplate Rating (Gross MWe):
778
- 5. Design Electrical Rating (Net MWe):
787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
I t
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr. to-Date Cumulative 744.0 2,160.0 76,705.0
- 11. Hours in Reporting Period 744.0 2,146.5 63,517.4
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 744.0 2,138.6 62,510.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.658.232.0 4.797.720.0 124,859,022.0 i
- 17. Gross Electrical Energy Generated (MWH) 556,026.0,_,
1,605,696.0 39,537,924.0
- 18. Net Electrical Energy Generated (MWH) 536.915.0 1,552,516.0 38,125,976.0
- 19. Unit Service Factor 100.0 99.0 81.5
- 20. Unit Availability Factor 100.0 99.0 81.5
- 21. Unit Capacity Factor (Using MDC Net) 94.5 94.1 65.1 92.8 92.4 63.9
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 1.0 3.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
Refueling, Ray 1, 1983, four weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8306020148 830405 DR ADOCK 05000298 g 7, PDR
O.
AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET NO.
UNIT Cooper Nuclear Station DATE April 5, 1983
?
COMPLETED BY P.L. Ballinger TELEPHONE 402-825-3811 March MONT11 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 762 1
37 732 2
756 ig 730 3
754 39 711 4
748 20 660 732 5
707 21 720 6
700 22 7
71?
23 712 g
746 716 24 713 9
746 25 711 10 745 26 1I 741 27 710 12 739 23 707 13 737 705 29 14 734 702 30 1
15 732 3
693 l
16 728 l
l I
INSTRUC110NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to i
the nearest whole megawatt.
f (9/77) l I
k
n
=
2 2
3
- m.. m..
o y
z X'T m
m n v.
O
- c. o e
- 6. C-
- S n
s c
2
=
0 Er.
y m
mo" ea m*
I
=.cm
>x Z
Type o 6 >c. m. c. o. m.0 ;c M E.m u
. o O
n u=n w'R. o n o oa
-c-m 22 U 6. k -d M
~ O E.. EI E 5* E B Duration mc
-c uo O
(Hours) m E E d x n -
xs-ss e
u "m
5'rTEx 2.E:
- i' a 2. 3 g Q= a c
=
33 Reason-Cg m
.x,~
3 Y
Method of x
c s
Shutting 2
s, o
7 Down Reactor 3 q
m u
n 5-3 c
C m
-u a
~
z r
5 4"E z
o
- 3o H
t
- =s g
2 4
O2 H
2
=
c w
o' o
t'eY-E System 6
- E 4
1 m
o>EEE code n
M
- . c u u :r
~33 y
2 5 c c 8.
M.c s E. v. -
-o C
mE 5 n' N, Component C
w n
. X,' s Code 5 d
u 2
s m
- sm b
n O
3 mg g,g cR a
m omm m E
~ n :.4 5 3>g rF 25 m
g
=.
=
-e.
gE
~CM d
E w"
g 3 50m -
@ E' n 2m c2q C*>>E
- e. sc 4K20 2
$3 c a r. -
=-:
2mw y
= = 5 5-g-R m<mm.
3
- 23 %
=
2 I'O5 b
N
- ' t.> 0 O
r *-
o 3
3 m
vi N,., t r.
M, 1 3 o
- r. O O 9
E, s'a e
nug I
D 1
4 Q
?5Ey v
- a 1 o
- n*
A D
A D
Z l
d' Z
A 3
a-M=
4 1
-4 3
o a
""1 dIQ D
D C
3 4
3 1
1 rI) rt e3 rt
>8.
O
- 3
,.'.1
., e
~l OPERATIONS NARRATIVE Cooper Nuclear Station' j
March 1983 The plant operated the month of March with,no shutdowns or power reductions.
A capacity factor of approximately 93% was maintained for.the month.
a
's
)
COOPER NUCLEAR STATION Nebraska Public Power District
' " * ?A"e" =%";%""^15""
m CNSS830259 April 5, 1983 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Monthly Operation Status Report for March 1983 Docket No. 50-298 Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for March 1983. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown data, and a Narrative Summary of Operating Experience.
Should you have any comments or require additional information regarding this report, please contact me.
Sincerely, L. C. Lessor Station Superintendent Cooper Nuclear Station LCL:cg Enclosure cc: