Forwards OTSG Tube ISI Refuel Outage 9 12 Month Rept & Exam of Crystal River-3 Pulled SG Tubes Final Rept
ML20084L527
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1995
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20084L531 List:
References
3F0595-07, 3F595-7, NUDOCS 9506070239
Download: ML20084L527 (2)


Text

,

Florida Power CORPORATION oyennt aver una a DodetNo.80302 May 31, 1995 3F0595-07 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Once Through Steam Generator Inspection, Technical Specification Twelve-Month Report

Reference:

A. FPC to NRC letter, 3F0594-01, dated May 25, 1994 B. FPC to NRC letter, 3F1194-10, dated November 30, 1994

Dear Sir:

Florida Power Corporation (FPC)is hereby providing the complete results of the Once Through Steam Generators (OTSGs) inspection performed during our Refuel Outage 9 (Spring 1994) as well as a final version of the report, " Evaluation of Crystal River 3 Pulled Steam Generator Tubes," we provided to you in Reference B.

The special report is provided in accordance with Technical Specification 5.7.2.c.

The report contains the following information:

1.

Number and extent of tubes inspected, 2.

Location and percent of wall-thickness penetration for each indication of an imperfection, and 3.

Identification of tubes plugged and tubes sleeved.

The information contained in the attached 12-month report supersedes information previously provided in Reference A pertaining to the items listed above.

9506070239 950531 PDR ADOCK 05000302 0

PDR CRYSTAL RVER ENERGY COMPLEX 15760 W. Power une Street. Crysted FUvor. Flonda 3442S6708. (904) 7954486 A Flanda Progress Compvry

U. S. Nuclear Regulatory Commission 3F0595-07 Page 2 The final version of the report provided in Reference B replaces the earlier version with change bars noting any actual changes made.

This report is consistent with the technical bases provided in support of TSCRN 203, Revision 0 but addresses the tube pull results more broadly.

Sincerely, G. L.

oldt, Vice President Nuclear Production GL8:LVC Attachment Regional Administrator, Region 11 xc:

Senior Resident inspector NRR Project Manager

,