Forwards Rept Re Containment Dome.Concrete Placement Scheduled for 710210 & Completion of post-tensioning Will Be Two Months Thereafter.Proof Test Will Be Conducted After Completion of Final Const Step.W/O Rept
ML20084K294
Person / Time
Site: Turkey Point, 05000000
Issue date: 12/23/1970
From: Kinsman G
FLORIDA POWER & LIGHT CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19289B371 List:
References
NUDOCS 8305190261
Download: ML20084K294 (1)


Text

u y Y

P O COX 319') f.itAr.u. II OSM B101 10-1 O

v =v==m!,h.a'%

I '.----.D,rD, ?bq

.i to s-_.

FloboA Poa H t. LIGHT to*/rM.Y December 23, 1970 c)

\\

N d

Q s\\\\

N' % -@,1

\\

n Dr. Peter A. Morris, Director

~

-V

-t

-2 M

s Division of Reactor Licensing h '^

4 3 U.

S. Atomi.c Energy Commission Washington, D. C.

20545

?

  • ~ ~.

Re:

Docket No. 50-250 - Turkey Point Unit No. 3 O-

Dear Dr. Morris:

\\

As discussed in your letter of December 4, 1970, received this week, we herewith submit fifty (50) copies of a report concerning the Turkey Point Unit No. 3 containment dome.

Concrete placement is scheduled for on or about February 10, 1971, and completion of post-tensioning will be about two

{

months thereafter.

As soori as practicable af ter completion i

of thic final construction step, the proof test will be conducted and test results reported to you.

Very truly yours, m

_o_

i

\\

George KinMan Senior Vice President