Text
'
s D
VED3R7(1788)(1-988410A819)PD 11/94/74 171S N 4* 22 ICS IPNVE N NVN A
98858 TOVE MARIS IL-7811-05 4Ier CST s
PS JANES e EEPPLER REGIONAL DIMCTOR DIRECTATE OF-
- Q g
RNULATORY OPERATIONS REGION THREE US ATONIC EMASY C0
\\
d 5 799 ROOSEVELT RD
~
h 6'
Y a h ELLYN IL 60137 t
s l
$l SWJECT DPR-19 DRESMN NUCLEAR P0WER STATION WIT 2
~
gg THIS WILL COW 1RN A CONVERSATION WITN JOHNSON OF YOUR OFFICE
,o8 'lete NDINIS THIS DATE CONCERNINS FAILURE OF PEED WATER 7
p CNECX VALVES S-229-6SA AND 2-220-584 79 PASS LOCAL c { LEAE RATE TEST. 2-289-54A COLA D NOT RE PMSStat1ZD AND LEAE RATE OF OTHER CECE VALVE WAS GUITE NNN.
p1, -
OVERNAIA. IS IN PROGRESS AT TNis TIE
% Y%EPENSON SWERINTENDENT DRESDEN NUCLEAR POWER I,,,,gTION CONNDNWEALTN EDTSON Co ROUTE 1 NDRRIS IL 48454
y-
- 7 F
,f
\\
- 'Aaare ;H. >. o N
- oteeportot N
/ C ucaqo.I: ^ o G e o m
EDS Ltr.6313-74 Dreed h !;uclear Power Station R. R. #1
++
l' orris, Illinois 60450 November 12, 1974
, _, {yj.
q y
~.p z
..!l, '~, y.
I,!
3 O. ' ;,, -
l' Mr. Jr.es G. Keppler, Regional Director
- b. l '.
/~,
Directorate of Rer;ulatory Operationa-Region III
.s,.
,,.7,_
/ '.'
f",,
I
/*
U. S. Atemic Ener;y Co=:icsion 799 Roosevelt Read y','
Glen Ellyn, Illinois 60137
/,
':,?;q-
.c SUDJECT: p_FTORT 07 At"!OML OCCimRE CE PI R STtTIC'T 6.6. A 0F THE TEC!rIICAL SI i CIFIC/7.S '.:A Fis1 LURE 0? ?? 2314 CO:TTP.0L VALVE TO GIVE HALF SCRAt4
References:
- 1) Regulatory Citide 1.16 Rev.1 Appendix A
- 2) Notification of Region III of AEC Regulatory Operations Tclephone: Er. P. Jchncen, 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> on November 3, 1974 Tclogram: Fr. J. Ecppler, 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br /> on November 4, 1974 Report Number: 50-237/1974-59 Report Date: Novc=ber 12, 1974 Occurrence Dato: Novcabcr 2, 1974 Facility: Dresden Nuclear Powcr Station, Morris, Illinois IDETPIFICATION OF OCCURRF:CE At approximately 0230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> on November 2, 1974, during weekly turbino surveillance, the number 4 control valve failed to give an alarm or half scram.
CONDITIONS PRIOR TO OCCURRP CE 3
At the time of the occurrence, Unit 2 was at 1460 megawatts them.a1 with the modo switch in the "Run" position. The unit had an electrical load of 452 megawatts.
DI'SCRIPTION 0? CCCURED;0E During the weekly turbino curveillance, the operator cloned number 4 control valvo per proceduro and failed to receive an alarm or half scram. System.
parameters indicatcd the valve had closed. The valve was subcoquently cycled three times and still failed to produce an alarm or half scram.
11G51 k
W-C0PY SENT REGION _#
2 Q
l
- g November 12, 1974 Mr. J e.cs G. Kep (d
.}
D"SIO*".?ICf 071.??r." 7 C.'.UCE 0? 000'9.RI:02 (Fabrication Error) 1.n investigation into the probica revealed that a lead had broken on the Amphenol plus from the fact acting solenoid initiating the scram function.
The apparent cauco of the breakage appeared to be that the pins in the plug were to czall for the sage wire being used.
M*AIXSIS OP 00CURRE'0E The safety of the plant and public was not in jeopardy during the failure of the number 4 control valve to givo a half scram. The fast acting solenoid j
on control valves 1,2&3 were operable and would have caused a reactor scram on fast closure of these valves.
CORRECTIVE 1.CTION The fr=:cdiato corrective ection t'as to test the valvo and issue work request nicber 10378 to inspect the cirevitry.
The emphenol plugs will be scheduled for replacement during the current E003 refueling outage depending upon the availability of materials.
Sincerely,
- /y l8. 'B. $// W tophenson Superintendent BBS ERP do 4