ML20084J918

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Design of Diesel Generator Exhaust Piping.Components Needed to Complete Installation Expected on Site by 840601.Work Expected to Be Complete by 840701 for Unit 1 & 841001 for Unit 2
ML20084J918
Person / Time
Site: Perry  
Issue date: 05/01/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Keppler T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-78(83), NUDOCS 8405110030
Download: ML20084J918 (1)


Text

)b f T!!E C L E V E L, M D E L E C T R iC ! L L UiM u AT!!10 C O M PW P.O. box 5000 - CLEVELAND. oHlO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BloG. - 55 PUBLICSoU/.RE Serving The Best Location in the Nation I '

MURRAY R. EDELMAN VICE PRES 10ENT NUCLE A R Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Design of Diesel Generator Exhaust Piping [RDC 78(83)]

Dear Mr. Keppler:

Our final report to you dated January 30, 1984, stated that installation of redesigned diesel generator exhaust piping / supports was expected to be completed by May 1,1984, for Unit 1 and October 1,1984, for Unit 2.

Components needed to complete installation are expected on site by June 1, 1984. We now anticipate work completion by July' 1,1984, for Unit 1 and October 1,1984, for Unit 2.

Sincerely,

)

}0:

Murray R. Edelman Vice President Nuclear Group MRE:pab cc:

Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Conmission c/o Document Management Branch Washington, D.C.

20555 Records Ceriter, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 h1 9

8405110030 840501

-hlAY 4 1984 PDR ADOCK 00000440 S

PDR I D