Text
--
m
.f.,-
O m
O y
m Jersey Central PoweE4 Light Company Q -
M ADISON' AVENU E AT PUNCH DoWL ROAD D MoRRISToWN. N.J. o7960 e 539 611 t
/
~
s;p June 22, 1973 g
\\-
i
!i Q
i/
'Lb
-.12 51973x 2 i
j#
Mr. A. Giambusso i
Deputy Director for Reactor Projects
.s y
d/
Directorate of Licensing S
"N s
' T [\\ P United States Atomic Energy Commissica i
Washington, D. C. 20545 4
Dear Mr. Giambusso:
l
Subject:
Oyster Creek Station j
Docket No. 50-219 Diesel Ccnerator 1-1 The purpose of this letter is to report a failure of diesel gencr-ator 1 to assume load during a recent surveillance test. This event is con-sidered to be un abnormal occurrence as defined in the Technical Specifications, Paracraph 1.15.G.
Notificatien of this event as required by the Technical Specifications, Paragraph 6.6.B was made to AEC Region I, Directorate of Reg-ulatory Operations on June 11, 1973.
I t
As a part of the normal surveillanco progra:n, an attempt was made to start the No. I diesel generator and load it to greater than 201 power as re-a quired by the Technical Specifications, Paragraph 4.7. A.1.
ilowever, before the unit could automatically synchronize onto the IC bus, a " sequence fault" initiated i
and the generator shut down.
Investigation into this event showed that following a fast start test and with the diesel generator in peaking control, the generator trips immedi-ately upon receipt of a normal stop signal rather than running back the-load as might be expected. As a result, the cngine governors arc not set up for 60 !!z unloaded operation.
In attempting to perform the normal surveillance test, the engine governor could not reset at a fast enough rate to match up frequency.
Allowabic time interval is 60 seconds.
Coasequently, the " sequence fault" condition occurred and the generator shut down, i-The No. 1~ diesel generator was taken out of automatic, started locally, was properly synchronized manually and loaded to rated load (2750 KN peaking).
i.
Control was then transferred back to the Control Room and the load test ecmp]cted.
The No. 2 dicsc1 generator was also nanually started and voltage and frequency natched locally. The unit was shut down, then niven a normal' start from the l
Control-Room and the surveillance test satisfactorily completed.
L I;
(
,My 8305180225 730622 0
PDR ADOCK 05000219 S
PDR f
COPY SENT REGION
_ _ =
o o
Mr. Giambusso June 22, 1973 The diesel generator units are required to perform their safety function during a loss of power condition; thus, under such circumstances, synchronization is not required.
Since both engines started and both generators were excited, their safety function would have been performed. Therefore, no unusu'al safety signficance is associated with this event.
I To prevent a recurrence of this kind, the Diesel Fast Start Surveil-lance Procedure (601) will be revised to include a manual unloading of the diesel generator before tripping the unit. This 'will run back the governor to normal unloaded position corresponding to 60112.
Enclosed are forty (40) copics of this report.
Very truly yours, syj{ _Cr,f
,i W
Donald A. Ross Manager, Nuclear Generating Stations i
l DAR:cs Enclosures (40) l cc:
Mr. J. P. O'Reilly, Director Directornte nf OcEn]ptory Oper.itions, Region I 7
l I
i e
.e---
,y w.
,.m..
,.7.
.,y,.
_-_.,-.-.,,m..w.g
,.e 1
Docket No. 50-219
\\.
\\
.',c o
\\
~%.:Q.
w
- g..g:g 7
^
f 6:;[
...' a% 4_
'I W K.,
s
- +, 4f 3.x.,,
. w;* ;;
a b f.k?.
....-...{'.T'.
4 x[ g ~'. '~~.
( r v';
p:..,..,. -
y(:: _7.
.t s
Date: i;/ t t0 3
?; d : }.
.+ -;. : >..,
TL.=.c s3 49_ gg _
.l..f..
/E:C?. MAL CCCU~EEE
. fI,;[
y..,
f(jf,;f REECRT ).'O..
73 10 W$.;*A.lt
,. s l;;*f;4.:
g.
GC2J':CT: Violati.cn of the Technical Specificatten, para.
u/A
.,:H a.: On (or),
Failuto of _ Diesel GDucuCQL l~L to assa.=a laod during survetilance
, testing witich is reqaited at bi ~ucckilj intervals.
This event is considered to be an abnornal cccurrence as defined in the Techatcal Specific.2clons, para, t, go Nottfi. cation of tius e.ent as required by the Tec'cnical Spe. tt'I.cdicts, para, 6.6.3 was made to EdC Regica I Directorate of Regulatory Operations on Noniant
.Dirn.1_1.
1973 t.
e\\
SETUATICN:
,~
t' v 7tl
.J
?
As a part: of the notr11. sutvoi! lance pcoqtam, an a ttempt wa s enade to c;bitt JL Olesel Genatalar and load it to <fte.tter than 2G:' Scycr as ccqui ced i>y ti:0 s*cchnical Spm;ilica tion ytt,* graph 4.7. A.1 Ucuevnt
!;ciorn ti:<3 unit; could autoraticalLt) 2)cchtani.:a to thd 1C bus, a *Soyuence Vaalt" was initiated and ti;0 cn'rinc that r!nwn.
k h.h
~
r__ _m=+emeagemeens c _
O O:
C"U'T
- I 2'
rollowing a Fast Statt cost which had tects conducccd on both Diosal Genarators on Juno 1, etch unit htd bean Ltipp d tro"1 the fully Lcadcal cordi tion. As a result, tha engine jovernors vara not set up Car 60's unicuded operation.
to.sttemptit>7 to pocEarm the nort al survnllianco test tha cityina gavarnar could not resat at a fast enoug's cata to tutch up frequency, Allovabic tint intncval is 60 scconds. Conaaquantly tlw " Sequence Fault" conditlan cccutted.
REXEDT AL Af:TTC.'[:
The engino was taken out of automatic, atacccd locally, was properly synchconized rat:nually, and loaded to cated load (21$0 X:t peakin.y).
Cat 1 trol was then transt'otted back to the Cnnt tol Roost and tho load test was ccapleted. 42 Dinsal Genovator was also.mattually started and voltago and frequency natched up locally' Tha unit was stopped, thett given a nocnni start fran the Control Poors and tha sutvollianco tcst v.1s aatisfactattLy cc:tpla ted.
j SA?5TT SIGK[FLCANCE:
The Dicaal Generator unita are required to cunction durin-] a loss af pcwet condition, thus as a tcsult, stichrottizttlon is not
.rcquitad. Sinca Loth enginen started and botit genotators woro excited, this tunction muld have tccn portorevyl. Therefore thara is no safaty signit'icance associated with this event.
s1n o
1.1 r-t,
.r, y
t.),
c.
i w-P-
s
.2 s
p.
Prepared by:
D. A.L. Reeves '
6/11/73~
l
s x
f.1E!10 !!OUTE 5:
I_
,.....,si....,,<.-.
s,..... e.
,m,,
i y """' a"-
5 " '"' a " d ""'
'a'""'-
m...,.,......-
,.,,.s..
r..
& ~..._. u o,
=
i o (n.,.
..rm n = c.
'^'
j Licensec: Jersey Central l'ower & Licht Co.
't j.
- 11. D. Thornburg, em Docket No.: 50-219 3
Chief, FSSEB i
i j
Abnormal Occurrence: Report dated 6/11/73 -
{*
10 (Name and wrot)
ANTIAA.s 7 tw AAn.S
.i 2
RO:llQ (5)
)'
DR Central Files (1)
The attached report from the subject negulatory Standards
- 3)
~
licensec is em Dir of Licensine (131 forwarded in accordance uith PO Manual Chnnter 1000 klMARPS y Files The action taken by the ifcensee is considered i
'.i em appropriato.
Followup will be performed durin:
1; the next inst'ection Es appropriate.
Conics *of F RO M (No vie anJ unst)
PLMARKS the report have been forwarded to the PDR, Local v
, ', p'.L2,,
t
,1 PDR, NSIC, DTIE and State representatives. The R. T. Carlson, RO:I
. 3.3 T't licensee will submit a 10 day written report to c-em/12/73 T%.<
r.or o.
6 Licensing.
'g$
m omo m,e.u-mA.,.,
_,,,,..., g w-
.~
.y
{
.~
- y;- ::.,
w,.
n
.x
. p;.
s
-c.
s:.
+..
- g
- .a.
,,. :, f.'3 5
f 1: - '
K:
,; w r.
4 3.
W<
j m w i
=..
~
.g s
~
_{
j t.
'.b T
{:,.
e..
.t I
.j
' {:
r..
1,.
.c l,
- ' i..
r
.m
$.: v
.O.
. e,.,...
. '.a,......
r.
~ $.,
o 4.! g m' -. - _ '. '
gggemm m igd WIFawg g wJir? M-l c
';::ec. f. ] _J
. -l
~: j..
,. p ' ;:
o