Interim Deficiency Rept DER 84-02 Re Rust,Scale & Pitting in Clevis & Arm of Several Safety Injection & Ch Valves. Initially Reported on 840123.Due to Extensive Investigation, Final Rept Delayed Until 840621
ML20084J497
Person / Time
Site: Palo Verde  
Issue date: 04/24/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29350-BSK, DER-84-02, DER-84-2, NUDOCS 8405090126
Download: ML20084J497 (2)


Text

-

.ac 3,:

ECats

n Arizona Public Service Company

!5 M 27 [;.; p ; 7 Ih (~H.~ ^

April 24, 1984 ANPP-29350-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Fishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-02 A 50.55(e) Potentially Reportable Deficiency Relating To Rust, Scale And Pitting In Clevis And Arm Of Several SI And CH Valves File: 84-019-026; D.4.33.2 Re ference: (A) Telephone conversation between P. Johnson and T. Bradish on January 23, 1984 (B) ANPP-28885, dated February 15,1984 (Interim Report)

(C) ANPP-29130, dated March 22,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B) and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by April 27, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by June 21, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, C(L OL E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc: See Page Two 8405090126 840424 PDR ADOCK 05000528 S

PDR W~&

l

(

a-Mr. T. W. Bishop DER 84-02 Page Two cc:

Richard'DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. E. Karner W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J..Stubblefield W. G. Bingham R. L. Pa tterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339