Ro:On 730207,following Isolation & Scram on 730120,calibr Check of Electromatic Relief Valve Pressure Controllers Revealed High Setpoints.Setpoints Adjusted & Surveillance Increased.Cause Undetermined
ML20084J427
Person / Time
Site: Quad Cities 
Issue date: 03/07/1973
From: Stephenson B
COMMONWEALTH EDISON CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084J415 List:
References
BBS-73-39, NUDOCS 8305120612
Download: ML20084J427 (3)


Text

___

~_

m 7,. _ _ _. - - - -

_.--- -------~ -- g Co nwerith Edison Quad-Citi:s Nuclear Powzr St: tion Post Office Box 216 C

4 Cordova lilinois61242 Telephone 309/654-2241

//%

s^?V-J d?.$bktj' i

?fY 9

BBS-73-39

'h-oi h ' "

/

50-254 March 7, 1973 g

j.bs

\\

Mr. Angelo Giambusso Deputy Director for\\ Reactor Projects Directorate of Licensing U. S. Atomic Energy Commission Washington, D. C. 20545 l U' (,'),l 7

Re ference :

Quad-Cities Nuclear Power Station, Unit 1 I

Docket 50-254, License DPR-29, Appendix A, Section 6.6.C.2.

Dear Mr. Giambusso:

L The purpose of this letter is to inform you of a condition g p.)

relating to the operation of Unit 1 in which the setpoints N

of the electromatic relief valves were found to be high.

( [.

This condition was reported to Region III Compliance by telephone on February 8,1973 Following the January 20, 1973 isolation and scram on Unit Gu t 2, a calibration check of the electromatic relief valve pres-sure controllers revealed that the setpoints of some valves

[)J had drifted 20 to 15 psi low.

In. order to determine if a sindlar condition existed on Unit 1 a calibration was per-

} ()

b formed on February 7,1973 The actuation / reset pressures I,l of valves 203-3A, B, C, D & E were found to be 1245/1100, 7 1400/1080, 1152/1081, 71400/110 8, and 1195/1160 respectively.

The design setpoints for these valves are 1125 (203-3A),

113b (203-3B & C), and 1135 (203-3 D & E) plus a 9 psi head correction.

The "as left" setpoints on July 6,1972, the last previous calibration, were 1132/2113, 1137/1117, 1136/

1118, 1142/1124, and 1147/1115 psi.

Following the discovery of this abnormal drift, the setpoints of all the pressure controllers were adjusted.

A second I

3 8305120612 730619 roe suocs osooo2e4 s

PDR 1882 8

y

~.

g w-O O

,I Mr. A. Giambusso March 7, 1973 i

I calibration on February 7,1973 was conducted to confirm the adjusted setpoints.

Station management personnel including the Instrument Engineer observed this calibration and inspected the controllers.. ?h) abnormal conditions were detected and the trip points were found to be no more than 3 psi different from the as left setting earlier in the day with one exception.

l The. controller for relief valve 3E had drif ted about 50 psi due to a loose ~ nut on the bracket which supports the micro switches. ~ This nut was tightened and the controller was 3

j recalibrated successfully.

5 The pressure switch assembly for the 3B valve was removed from the controller for a closer inspection in the instrument shop.

The switch appeared to be in perfect condition and was re-installed prior to the reactor startup on February 8, 1973 After installation the switch was calibrated and found to have drif ted only 10 psi from the previous setting.

i:

9 The pressure controllers are supplied with the electromatic relief valves by Dresser Industries.

The pressure sensing device in the controller is a Barksdale bourdon tube which actuates two micro switches.

Although the non-safety related pressure relief function of the relief valves was. rendered inoperable, the valves were

, fully operable manually at all times.

Also the capability of

, the valves to perform their auto pressure relief function as j an ECCS subsystem was unaffected; therefore, none of the -

! Limiting Conditions for Operation in the Technical Specifi-

~ cations-were exceeded.

The coincident. failure of the relief valves and the. turbine bypass system is analyzed in the -FSAR

' and demonstrates that the safety valves alone are adequate to prevent exceeding ~ASTE Code,Section III peak. allowable.

pressures.

During the period of operation since the previous calibration-on July 6,1972 reactor pressure never exceeded -1100 psi ~ fol-

-lowing any scram.

If pressure:had increased above the ' design:

relief valveJ11ft pressures, the valves would have been opened

' manually ' by the control room operator. to limit pressure below' the safety valve setpoints.

The Station Review Board:has reviewed-this condition and an increased surveillance -program.on these switches was imple--

mented..

The ' program consists of -a calibration after two weeks

' ofcoperation and then ~ at " intervals of one month, 3 months, and 3 months until the fall refueling outage.

The need for-b l'

e A

l (3

b U

(V Mr. A. Giambusso March 7, 1973 permanent surveillance on a quarterly basis will then be evaluated based on the observed drift history.

The first check was conducted on February 23, 1973 and all switches were within 1% of the previous calibration setting.

It can be seen from the setpoint changes observed that the switches which actuate the relief valves, the right hand micro switch, all drif ted high while the lef t hand switches which reset the valves all drifted low.

The one exception being the 3E valve which was explained by a loose brccket nut.

Both switches are actuated by a bracket which is attached to the tip of the bourdon tube.

The observed drif t could be explained by a slight rotation of the bracket which would have the effect of increasing one switch while decreasing the other.

Examination of the switches, however, did not in-dicate that this had occurred.

The switch manufacturer, Barksdale, was advised of the sit-uation but could offer no explanation for the drif t experienced.

The calibration technique and equipment (1500 psi Heise gage and hand pump) are also being considered as a possible cause along with personnel error.

These are considered unlikely, however, in view of the manner in which the switches drif ted and the simplicity of the procedure.

In a further attempt to identify the cause of failure a replacement bourdon tube-switch assembly is being obtained to allow one of the suspect switches to be removed for laboratory testing.

Any additional information obtained from this study will be reported to your office.

I Very truly yours, COMMONWEALTH EDISON COMPANY QUAD CITIES NUCLEAR POWER STATION AG. ?Q s(s B. B. Stephenson Superintendent BBS/lk