ML20084J418

From kanterella
Jump to navigation Jump to search
Informs of Plans for Insp of Jet Pumps at Unit 1 Due to 720820 RO at Unit 2.Insp to Be Performed During Fall 1973 Refueling Outage.Addl Surveillance Requirements Initiated
ML20084J418
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/30/1972
From: Butterfield L
COMMONWEALTH EDISON CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084J407 List:
References
NUDOCS 8305120600
Download: ML20084J418 (1)


Text

O.

g 4

-=an J

0"

[

Commomvealth 3dison Company 2

ONE FIRST N A TIO N A L PLAZA

  • C H I C A G O.

SLLINOlS Address Redy n POST OF FICE SO X 747

  • C H I C A G O. ILLINOl3 40490 October 30, 1972 4'

fy

\\

A-5 Q1 r

f _.

i Mr. Angelo Giambusso

[M '.f

,j Deputy Director of Reactor Projects

$;s,/7 i

g Directorate of Licensing

/QJ U.S. Atomic Energy Commission TM

/N fh.),

Washington, D.C.

20545

Subject:

Quad-Cities Station Suecial Reoort No. 2

Dear Mr. Giambusso:

Attached is Quad-Cities Station Special Report No. 2.

This report is submitted as the result of the incident of August 20, 1972, on Quad-cities Unit 2 when a jet pump failed.

Inspection of the jet pumps on Unit 1 will be performed during the refueling outage, presently scheduled

[

for the fall of 1973.

As a result, additional surveillance 1

requirements have been placed on Quad-cities Unit 1 while the incident is being analyzed.

Continuation of the increased surveillance is under review by the ccmmonwealth Edison Company at this time as a result of this. report.

Modified Technical Specifications, as discussed in'Section VII of this report, will be submitted shortly for the Quad-Cities Station.

One original and 39 copies are provided for your use.

Very truly yours, g[

\\

'f"'

.g z L.D. Butterfield, Jr.

Nuclear-Licensing Administrator

)#

$4 5972 O

PDR j

~

TCOPY SENT REGION a

- _ _ - - - - - _ _ - - - - -