Interim Deficiency Rept DER 83-82 Re Diesel Generator Control Cabinets Having Too Small Bend Radius.Initially Reported on 831202.Due to Extensive Evaluation,Next Rept Delayed Until 840531
ML20084J414
Person / Time
Site: Palo Verde  
Issue date: 04/24/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29348-BSK, DER-83-82, NUDOCS 8405090104
Download: ML20084J414 (2)


Text

-

w g

sy

^

i Arizona Public Service Company m

ch, pn pI f

fg j;, y L

i UEGWi;m April 24,1984 ANPP-29348-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division -of Resident Reactor Projects and Engineering Programs 7

j

Subject:

Time Extension For Report - DER 83-82 l

A 50.55(e) Potentially Reportable Deficiency Relating To Cables In the Unit 1 and 2 Diesel Generator Control Cabinets and Three Cables in the Unit 1 Diesel Generator Building, Have Too Small of a Bend Radius File: 84-019-026; D.4.33.2 Re ference: (A) Telephone conversation between P. Gage and K. Parrish on l

December 2, 1983 (B) ANPP-28528, dated January 3,1984 (Interim Report)

(C) ANPP-28919, dated February 22, 1984 (Time Extension)

Dear Sir:

l The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by April 25, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 31, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, j

Ct A g.,_

o O

E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director i

EEVB/TRB:db cc: See Page Two 0

/F-G 6

5

y f.

~ ;t-Mr. T. W. Bishop DER 83-82 Page Two ec:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Wo od s, J r.

D. B. Karner' W. E. Ide D. B. Fasnacht A. C. Rogers B. S..Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C.'Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster

n. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 4